Based on the APDCL Schedule of Tariff effective 1 April 2026 (AERC order dated 6 March 2026). Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your load and units. The calculator follows the official APDCL tariff notice effective 1 April 2026, with slab-by-slab charges, the government subsidy, fixed charges, ToD, green tariff and HT demand rules.
Based on the APDCL Schedule of Tariff effective 1 April 2026 (AERC order dated 6 March 2026). Free, no sign-up. An estimate, not your official bill.
Pick your connection category, then fill in the fields that appear. Each category shows only the inputs its tariff needs.
Pick Domestic A for homes of 0.5 kW to below 5 kW and Domestic B for 5 kW to 30 kW. Jeevan Dhara is the lifeline category. Shops use LT-IV.
Type the connected load in kW and the units for the month. HT categories take contract demand in kVA.
Add ToD units, recorded demand, green tariff, and the duty, meter rent or fuel adjustment from your bill.
See every slab and line, then print, save as PDF or share the result.
It applies the APDCL tariff notice category by category and shows each step of the working.
Covers Jeevan Dhara, Domestic A and B, commercial, industrial, agriculture, lighting, temporary supply, EV charging and every HT category in the notice.
Shows each block of units at its own rate, with the full cost, subsidy and the rate you pay.
One switch shows the effective bill and the full-cost bill, and tells you how much the subsidy saves.
Rounds connected load to the nearest kW as the notice says, and flags the one case it does not cover.
Uses billing demand, 3 times the rate for demand above contract, voltage rebates and the transformer-loss rule.
Handles 80% and 120% ToD, the ₹1.00 green tariff, the oxygen-plant rebate and the higher-of rule for temporary supply.
The Assam Power Distribution Company Limited (APDCL) bills a fixed charge plus an energy charge. The fixed charge depends on your connected load in kW, or contract demand in kVA for HT. The energy charge depends on your category and, for domestic homes, on telescopic slabs.
Bill = fixed charge + energy charge by slab ± ToD, voltage and demand adjustments + green tariff + duty and other items from your bill
The notice gives two figures for subsidised slabs: the full cost approved by the Assam Electricity Regulatory Commission, and the effective tariff after the Government of Assam subsidy. The calculator shows both.
These are the rates for homes. The last column is what you pay after the subsidy.
| Slab | Full cost | Targeted subsidy | Tariff subsidy | You pay |
|---|---|---|---|---|
| All unitsLT-I Jeevan Dhara | ₹5.34 | ₹1.00 | ₹0.99 | ₹3.35 |
| 0 to 120 unitsLT-II Domestic A (0.5–5 kW) | ₹5.99 | ₹0.75 | ₹0.99 | ₹4.25 |
| 121 to 240 unitsLT-II Domestic A (0.5–5 kW) | ₹7.29 | – | ₹0.99 | ₹6.30 |
| 241 to 300 unitsLT-II Domestic A (0.5–5 kW) | ₹8.19 | – | ₹0.99 | ₹7.20 |
| 301 to 500 unitsLT-II Domestic A (0.5–5 kW) | ₹8.19 | – | ₹0.79 | ₹7.40 |
| Balance units above 500LT-II Domestic A (0.5–5 kW) | ₹8.19 | – | – | ₹8.19 |
| 0 to 300 unitsLT-III Domestic B (5–30 kW) | ₹7.74 | – | ₹0.99 | ₹6.75 |
| 301 to 500 unitsLT-III Domestic B (5–30 kW) | ₹7.74 | – | ₹0.79 | ₹6.95 |
| Balance units above 500LT-III Domestic B (5–30 kW) | ₹7.74 | – | – | ₹7.74 |
| 0 to 300 unitsHT-I HT Domestic | ₹7.89 | – | ₹0.99 | ₹6.90 |
| 301 to 500 unitsHT-I HT Domestic | ₹7.89 | – | ₹0.79 | ₹7.10 |
| Balance units above 500HT-I HT Domestic | ₹7.89 | – | – | ₹7.89 |
Every category in the schedule is listed below. The notice marks all of them "No Hike". Energy rates are effective rates per kWh.
| Code | Category | Fixed charge per month | Energy rate per kWh (effective) |
|---|---|---|---|
| LT-I | Jeevan Dhara (0.5 kW and 1.5 kWh per day) | ₹40 per connection | ₹3.35 |
| LT-II | Domestic A (above 0.5 kW to below 5 kW) | ₹70 per kW | ₹4.25 up to 120; ₹6.30 121–240; ₹7.20 241–300; ₹7.40 301–500; ₹8.19 above 500 |
| LT-III | Domestic B (5 kW to 30 kW) | ₹70 per kW | ₹6.75 up to 300; ₹6.95 301–500; ₹7.74 above 500 |
| LT-IV | Commercial (above 0.5 kW to 30 kW) | ₹150 per kW | ₹8.94 |
| LT-V(A) | General purpose supply up to 30 kW: non-commercial and non-domestic | ₹165 per kW | ₹7.99 |
| LT-V(B) | General purpose supply up to 30 kW: Govt. primary, secondary and higher secondary schools | ₹90 per kW | ₹7.89 |
| LT-VI | Public lighting | ₹140 per kW | ₹7.94 |
| LT-VII | Agriculture up to 30 kW | ₹65 per kW | ₹6.09 |
| LT-VIII(i) | Small industries, rural, up to 30 kW | ₹70 per kW | ₹6.59 |
| LT-VIII(ii) | Small industries, urban, up to 30 kW | ₹80 per kW | ₹6.84 |
| LT-IX | Temporary supply: domestic | ₹105 per kW | ₹10.93 |
| LT-IX | Temporary supply: non-domestic non-agriculture | ₹155 per kW | ₹13.03 |
| LT-IX | Temporary supply: agriculture | ₹65 per kW | ₹6.19 |
| LT-X | LT electric vehicle charging station | None | ₹8.72 |
| LT-XI | Interstate sale | None | ₹8.72 |
| HT-I | HT domestic above 30 kW (35 kVA) | ₹70 per kVA | ₹6.90 up to 300; ₹7.10 301–500; ₹7.89 above 500 |
| HT-II | HT commercial above 30 kW (35 kVA) | ₹210 per kVA | ₹9.04 |
| HT-III | Public water works | ₹155 per kVA | ₹7.79 |
| HT-IV(i) | Bulk supply 30 kW and above: educational institutional | ₹150 per kVA | ₹8.19 |
| HT-IV(ii) | Bulk supply 30 kW and above: others | ₹210 per kVA | ₹9.14 |
| HT-V(A) | HT small industries above 30 kW (35 kVA) and up to 50 kVA | ₹90 per kVA | ₹7.29 |
| HT-V(B) | HT industries-I, 50 kVA to 150 kVA | ₹200 per kVA | ₹7.69 |
| HT-V(C) | HT industries-II above 150 kVA: Option 1 | ₹280 per kVA | ₹8.09 |
| HT-V(C) | HT industries-II above 150 kVA: Option 2 | ₹360 per kVA | ₹7.69 |
| HT-VI | Tea, coffee and rubber | ₹310 per kVA | ₹8.04 |
| HT-VII | Oil and coal | ₹320 per kVA | ₹9.09 |
| HT-VIII | HT irrigation load above 7.5 HP | ₹85 per kVA | ₹7.59 |
| HT-IX | HT temporary supply | ₹190 per kVA | ₹10.69 |
| HT-X | HT electric crematorium | ₹190 per kVA | ₹5.89 |
| HT-XI | HT railway traction | ₹320 per kVA | ₹7.79 |
| HT-XII | HT electric vehicle charging station | None | ₹8.35 |
| HT-XIII | HT interstate sale | None | ₹8.72 |
LT fixed charges are per kW of connected load, except Jeevan Dhara which is per connection. HT fixed charges are per kVA. LT-X and LT-XI, HT-XII and HT-XIII have no fixed charge in the notice.
Bills for a 2 kW Domestic A home and a 6 kW Domestic B home, with and without the government subsidy. They exclude duty, meter rent and fuel adjustment.
| Units | Domestic A, 2 kW | Without subsidy | Domestic B, 6 kW | Without subsidy |
|---|---|---|---|---|
| 50 | ₹352.50 | ₹439.50 | ₹757.50 | ₹807.00 |
| 100 | ₹565.00 | ₹739.00 | ₹1,095.00 | ₹1,194.00 |
| 120 | ₹650.00 | ₹858.80 | ₹1,230.00 | ₹1,348.80 |
| 150 | ₹839.00 | ₹1,077.50 | ₹1,432.50 | ₹1,581.00 |
| 200 | ₹1,154.00 | ₹1,442.00 | ₹1,770.00 | ₹1,968.00 |
| 240 | ₹1,406.00 | ₹1,733.60 | ₹2,040.00 | ₹2,277.60 |
| 300 | ₹1,838.00 | ₹2,225.00 | ₹2,445.00 | ₹2,742.00 |
| 400 | ₹2,578.00 | ₹3,044.00 | ₹3,140.00 | ₹3,516.00 |
| 500 | ₹3,318.00 | ₹3,863.00 | ₹3,835.00 | ₹4,290.00 |
| 750 | ₹5,365.50 | ₹5,910.50 | ₹5,770.00 | ₹6,225.00 |
| 1000 | ₹7,413.00 | ₹7,958.00 | ₹7,705.00 | ₹8,160.00 |
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 120 units | 120 | 4.25 | ₹510.00 |
| 121 to 240 units | 80 | 6.30 | ₹504.00 |
| Line | Amount |
|---|---|
| Energy charge (200 units, after government subsidy) | ₹1,014.00 |
| Fixed charge (₹70 × 3 kW) | ₹210.00 |
| Total payable | ₹1,224.00 |
At full cost the same bill would be ₹1,512.00, so the subsidy saves ₹288.00 in the month.
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 120 units | 120 | 4.25 | ₹510.00 |
| 121 to 240 units | 120 | 6.30 | ₹756.00 |
| 241 to 300 units | 60 | 7.20 | ₹432.00 |
| 301 to 500 units | 50 | 7.40 | ₹370.00 |
| Line | Amount |
|---|---|
| Energy charge (350 units, after government subsidy) | ₹2,068.00 |
| Fixed charge (₹70 × 2 kW) | ₹140.00 |
| Total payable | ₹2,208.00 |
| Line | Amount |
|---|---|
| Energy charge (40 units, after government subsidy) | ₹134.00 |
| Fixed charge (₹40 per connection per month) | ₹40.00 |
| Total payable | ₹174.00 |
| Line | Amount |
|---|---|
| Energy charge (400 units) | ₹3,576.00 |
| Fixed charge (₹150 × 5 kW) | ₹750.00 |
| Total payable | ₹4,326.00 |
| Line | Amount |
|---|---|
| Energy charge (30,000 units) | ₹2,42,700.00 |
| Demand charge (₹280 × 200 kVA contract demand) | ₹56,000.00 |
| Over-drawal penalty (30 kVA above contract demand at 3 × ₹280) | ₹25,200.00 |
| Total payable | ₹3,23,900.00 |
The 30 kVA above contract demand is charged at 3 times the ₹280 rate.
For LT consumers the connected load is rounded up to the next higher kW if the decimal is above 0.5 and down if it is below 0.5. A Jeevan Dhara load below 0.5 kW counts as 0.5 kW. So 1.4 kW is charged as 1 kW, 1.6 kW as 2 kW. The notice is silent on exactly .5. The calculator rounds up and warns you.
| Time slot | Name | Energy charge |
|---|---|---|
| 10 pm to 9 am | Normal hours | 100% of normal |
| 9 am to 5 pm | Solar hours | 80% of normal |
| 5 pm to 10 pm | Peak hours | 120% of normal |
Where ToD is newly introduced it is at the consumer's option. Where it was optional before it stays optional, and where it was compulsory it stays compulsory. A consumer may opt out or opt in again at most once every 6 months, with 2 months' notice to APDCL. The notice does not list the categories, so this calculator offers ToD as an optional input. It applies the multipliers to the average energy rate you pay.
LT and HT consumers can opt for additional renewable power at ₹1.00 per kWh over the normal charges. The share starts at 25% of monthly consumption and goes up to 100% in steps of 5%. The request must reach APDCL at least 3 months in advance.
These apply only to open access consumers and are shown for reference. The calculator does not use them.
| Item | Value |
|---|---|
| Wheeling charges at 33 kV | ₹0.27 per kWh |
| Wheeling losses at 33 kV | 5% |
| Wheeling losses at 11 kV | 11% |
| Category | CSS (₹ per kWh) |
|---|---|
| HT Domestic | ₹1.81 |
| HT Commercial | ₹1.81 |
| HT Public water works | ₹1.81 |
| HT Bulk supply, Govt. educational | ₹1.81 |
| HT Bulk supply, others | ₹1.81 |
| HT Small industries | ₹1.32 |
| HT Industries-I | ₹1.81 |
| HT Industries-II | ₹1.81 |
| Tea, coffee and rubber | ₹1.81 |
| Oil and coal | ₹1.81 |
| Irrigation load | ₹1.81 |
| Electric crematorium | ₹1.81 |
| Railway traction (kept in abeyance by Supreme Court interim order) | ₹1.81 |
| EV charging station | ₹1.33 |
| Category | Average billing rate (₹/kWh) | Standby charge (₹/kWh) |
|---|---|---|
| HT Domestic above 30 kW (35 kVA) | ₹9.01 | ₹2.25 |
| HT Commercial above 30 kW (35 kVA) | ₹10.72 | ₹2.68 |
| Public water works | ₹12.39 | ₹3.10 |
| Bulk supply, Govt. educational, above 30 kW (35 kVA) | ₹11.07 | ₹2.77 |
| Bulk supply, others, above 30 kW (35 kVA) | ₹10.52 | ₹2.63 |
| HT Small industries up to 50 kVA | ₹8.35 | ₹2.09 |
| HT Industries-I, 50 to 150 kVA | ₹11.03 | ₹2.76 |
| HT Industries-II above 150 kVA | ₹9.98 | ₹2.49 |
| Tea, coffee and rubber | ₹10.62 | ₹2.65 |
| Oil and coal | ₹10.18 | ₹2.55 |
| HT Irrigation above 30 kW (35 kVA) | ₹9.99 | ₹2.50 |
| HT Railway traction | ₹12.31 | ₹3.08 |
| HT EV charging station | ₹8.35 | ₹2.09 |
The APDCL notice is a schedule of tariff. It has no electricity duty, meter rent, fuel and power purchase adjustment, security deposit, arrears or late-payment charges. It also does not list which categories are on ToD, and it does not say how to round a load of exactly .5 kW. These are the reasons your printed bill can differ from this estimate. Enter the extra items in Advanced mode to close the gap.
Domestic A units up to 120 cost ₹4.25. The next 120 cost ₹6.30, so staying at or under 120 units saves the most per unit.
The rate rises to ₹7.20 after 240 units, ₹7.40 after 300 and ₹8.19 after 500. Check the meter before the month ends.
If you are on ToD, solar-hour units cost 80% of the normal rate, while 5 pm to 10 pm costs 120%.
Domestic fixed charge is ₹70 per kW, so a sanctioned load larger than you need adds to every bill.
Demand above contract demand is charged at 3 times the rate, so revise the contract demand if usage has grown.
Fewer grid units means fewer slab steps. Check net metering terms with APDCL before you invest.
APDCL Notice, Schedule of Tariff w.e.f. 1 April 2026, issued under the Assam Electricity Regulatory Commission order dated 6 March 2026 on Petition No. 20 of 2025. The state subsidy follows the Government of Assam letter referred to in the notice (Ref. PEL 590525/606 dated 20 December 2025). The notice is available on the APDCL website. Kalikolom Tools is not affiliated with APDCL.
An Assam bill is the energy charge plus a fixed charge. Domestic A and Domestic B use telescopic slabs, so each block of units is charged at its own rate. The fixed charge is ₹70 per kW of connected load for domestic homes. The notice gives an effective tariff after the state subsidy, and the full cost without it. Electricity duty, meter rent and fuel adjustment are not in the notice, so you add them from your bill.
For Domestic A (above 0.5 kW to below 5 kW) the effective rate is ₹4.25 for the first 120 units, ₹6.30 for 121 to 240, ₹7.20 for 241 to 300, ₹7.40 for 301 to 500 and ₹8.19 above 500 units. Domestic B (5 kW to 30 kW) pays ₹6.75 up to 300 units, ₹6.95 for 301 to 500 and ₹7.74 above that. Jeevan Dhara pays ₹3.35 and commercial LT-IV pays ₹8.94.
Domestic A and Domestic B pay ₹70 per kW per month. Jeevan Dhara pays ₹40 per connection per month. The connected load is rounded to the nearest kW first, so a 2 kW home pays ₹140 and a 3 kW home pays ₹210.
Full cost is the tariff approved by the Assam Electricity Regulatory Commission. The Government of Assam then gives a targeted subsidy and a tariff subsidy per unit for some domestic slabs. The effective tariff is full cost minus both. For Domestic A up to 120 units, ₹5.99 minus ₹0.75 and ₹0.99 gives ₹4.25. The notice says that without the subsidy the full charge becomes operative.
The notice marks every category "No Hike". The schedule applies from 1 April 2026 under the AERC order dated 6 March 2026 on Petition No. 20 of 2025, and stays in force until the Commission replaces it.
Jeevan Dhara is the lifeline category for a 0.5 kW load and 1.5 kWh a day. It pays ₹40 per connection and ₹3.35 per unit. If consumption is above 45 units a month for 2 consecutive months, the connection moves to Domestic A. The notice gives no other Jeevan Dhara rate, so the calculator bills all units at ₹3.35 and shows what Domestic A would cost.
For LT consumers the load is rounded up to the next higher kW if the decimal is above 0.5, and down to the nearest lower kW if it is below 0.5. A Jeevan Dhara load below 0.5 kW is taken as 0.5 kW. The notice does not say what happens at exactly .5, so the calculator rounds up and warns you.
Temporary supply (LT-IX and HT-IX) is billed at the higher of the fixed charge or the energy charge. The fixed charge is ₹105, ₹155 or ₹65 per kW for LT, and ₹190 per kVA for HT. The rate column says per month, but the footnote says per day, so the calculator uses the monthly figure by default and lets you switch to per day.
ToD changes the energy charge by time of day. Units from 10 pm to 9 am are at the normal rate, units from 9 am to 5 pm (solar hours) at 80%, and units from 5 pm to 10 pm (peak hours) at 120%. It is optional for categories where it is newly introduced, and compulsory only where it was compulsory before. The notice does not list the categories, so check with APDCL.
No, because the APDCL notice does not contain them. They default to zero. In Advanced mode you can enter the duty percentage, fuel and power purchase adjustment per unit, meter rent and any other item exactly as shown on your bill. Then the total matches your bill more closely.
It is an optional extra of ₹1.00 per kWh on top of the normal fixed and energy charges. A consumer can take 25% to 100% of monthly consumption from renewable sources, in steps of 5%, and must apply to APDCL at least 3 months in advance.
HT consumers pay a demand charge per kVA on billing demand plus the energy charge. Billing demand is the higher of contract demand and recorded demand. A 3% rebate applies at 132 kV supply and 1.5% at 33 kV, a 3% surcharge applies if power is drawn at a lower voltage, and 3% is added if metering is on the LT side of the transformer. Demand above contract demand is charged at 3 times the rate.
Common reasons are electricity duty, meter rent, fuel adjustment, arrears, late-payment charges, a different billing period, a meter reading that is estimated, or a connected load that differs from what you entered. Enter those items in Advanced mode to compare line by line.
Yes. In Advanced mode, enter an amount in the budget field. The calculator works backwards through the slabs and the fixed charge to show roughly how many units that amount covers. This helps prepaid and smart meter users.
The APDCL notice "Schedule of Tariff w.e.f. 1st April 2026", issued after the AERC order dated 6 March 2026 on Petition No. 20 of 2025. The subsidy follows the Government of Assam letter referred to in the notice. This tool is not an official APDCL service.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.