Electricity bill · North Gujarat

UGVCL Electricity Bill Calculator 2026-27 (North Gujarat, FPPAS + Duty)

Pick your connection, enter your monthly units, and see your UGVCL bill line by line, with fixed charge, FPPAS and duty included.

UGVCL Electricity Bill CalculatorNorth Gujarat bill from your units, as per the GERC schedule for 2026-27
kWh
More options (smart meter and peak-hour units)
kWh

Smart meters get a 60 paise per unit concession on daytime units. Commercial loads above 10 kW pay 45 paise extra per peak-hour unit.

Effective Tariff Slabs & Charges (Per Month)

Note: Slab rates are from the GERC tariff schedule for UGVCL, DGVCL, MGVCL and PGVCL effective 1 April 2026. FPPAS changes every quarter, so check the FPPAS line on your bill.

Bill Breakdown

Slab RangeUnitsRateAmount
Total Bill₹0.00

Key takeaways

  • The 2026-27 UGVCL base tariff is unchanged. Urban homes pay ₹3.05, ₹3.50, ₹4.15 and ₹5.20 per unit, rural homes ₹2.65 to ₹4.90.
  • Fixed charge is a flat ₹15 to ₹70 a month by load band, not a rate per kW. A 1 kW home pays ₹15.
  • With FPPAS and 15% duty, 200 units cost about ₹1,454.86 for an urban home, or about ₹7.27 per unit.

Many UGVCL calculators add a meter rent that is not in the tariff, show the fixed charge per kW, or use a wrong commercial rate. This one follows the GERC schedule effective 1 April 2026, then adds FPPAS and duty and shows each line so you can match your bill.

It covers urban and rural homes, BPL households and commercial (NRGP) connections up to 40 kW. It is free and needs no login.

In this guide
  1. UGVCL electricity bill calculator
  2. Budget planner: how many units can I use?
  3. Estimate your units from appliances
  4. UGVCL electricity tariff 2026-27
  5. How your UGVCL bill is calculated
  6. Monthly bill ladder
  7. FPPAS and duty explained
  8. Commercial (NRGP) bills
  9. UGVCL service area
  10. How to lower your bill
  11. Why other calculators show a different bill
  12. Frequently asked questions
  13. Sources and how we checked this

Budget planner: how many units can I use?

Enter the most you want to pay for a monthly bill. It uses the connection and charges you set above.

Estimate your units from appliances

Set how many of each appliance you run and for how many hours a day. The table adds up a 30-day total. Wattages are typical, so check your appliance label.

ApplianceWattsQtyHours/dayUnits (30 days)
Total: 0 units in 30 days
Advertisement

UGVCL electricity tariff 2026-27

GERC published one tariff schedule for UGVCL, DGVCL, MGVCL and PGVCL, effective 1 April 2026. Residential slabs are telescopic: each rate applies only to the units inside its slab.

Residential (RGP), post-paid meter

Monthly unitsUrbanRural
First 50₹3.05₹2.65
51 to 100₹3.50₹3.10
101 to 250₹4.15₹3.75
Above 250₹5.20₹4.90

Smart pre-paid meters get slightly lower rates: urban ₹2.96, ₹3.40, ₹4.03 and ₹5.04, rural ₹2.57, ₹3.01, ₹3.64 and ₹4.75.

Fixed charge for residential homes

Connected loadPer month
Up to 2 kW₹15
Above 2 to 4 kW₹25
Above 4 to 6 kW₹45
Above 6 kW₹70
BPL household₹5

BPL households

₹1.50 per unit for the first 50 units on a post-paid meter (₹1.46 pre-paid). Units above 50 are billed at the normal residential slab rate.

Commercial (NRGP), load up to 40 kW

ItemRate
Fixed charge, first 10 kW₹50 per kW per month
Fixed charge, next 30 kW₹85 per kW per month
Energy, load up to 10 kW₹4.35 per unit (₹4.22 pre-paid)
Energy, load above 10 kW up to 40 kW₹4.65 per unit (₹4.51 pre-paid)
Peak-hour extra, load above 10 kW45 paise per unit, 7-11 AM and 6-10 PM

The schedule excludes electricity duty, tax on sale of electricity and other government levies. FPPAS is charged under the formula GERC approves from time to time.

How your UGVCL bill is calculated

  1. Energy charge. Multiply the units in each slab by that slab's rate and add them up.
  2. Fixed charge. A flat amount for your load band.
  3. FPPAS. A per-unit charge on every unit you use, plus a small variable surcharge.
  4. Duty. A percentage of energy plus FPPAS.

Example 1: 200 units, urban RGP, 1 kW, post-paid.

  • 50 × ₹3.05 + 50 × ₹3.50 + 100 × ₹4.15 = ₹152.50 + ₹175.00 + ₹415.00 = ₹742.50
  • Fixed (up to 2 kW) = ₹15.00
  • FPPAS: 200 × ₹2.45 × 1.0399 = ₹509.55
  • Duty: 15% × (₹742.50 + ₹509.55) = ₹187.81
  • Total: ₹1,454.86

Example 2: 300 units, commercial NRGP, 5 kW.

  • Energy: 300 × ₹4.35 = ₹1,305.00 (all units at one rate)
  • Fixed: 5 kW × ₹50 = ₹250.00
  • FPPAS: ₹764.33, duty: 15% × (₹1,305.00 + ₹764.33) = ₹310.40
  • Total: ₹2,629.73

Monthly bill ladder

A quick lookup for an urban home with up to 2 kW load on a post-paid meter, including FPPAS and 15% duty.

UnitsEnergyFPPASDutyTotal billPer unit
50₹152.50₹127.39₹41.98₹336.87₹6.74
100₹327.50₹254.78₹87.34₹684.62₹6.85
150₹535.00₹382.16₹137.57₹1,069.73₹7.13
200₹742.50₹509.55₹187.81₹1,454.86₹7.27
250₹950.00₹636.94₹238.04₹1,839.98₹7.36
300₹1,210.00₹764.33₹296.15₹2,285.48₹7.62
400₹1,730.00₹1,019.10₹412.37₹3,176.47₹7.94
500₹2,250.00₹1,273.88₹528.58₹4,067.46₹8.13
600₹2,770.00₹1,528.65₹644.80₹4,958.45₹8.26
800₹3,810.00₹2,038.20₹877.23₹6,740.43₹8.43
Advertisement

FPPAS and duty explained

  • FPPAS. It is the largest add-on. This calculator uses ₹2.45 per unit plus 3.99% variable surcharge as a starting point. It changes every quarter, so enter the figure from your bill.
  • Electricity duty. The schedule says duty is extra. We use 15% on energy plus FPPAS. Check your bill and edit it if different.
  • Meter rent. Not in the GERC schedule, so the default is ₹0.

For 200 units, the slab rates alone give ₹742.50. With the fixed charge, FPPAS and duty the bill is ₹1,454.86. That is about ₹7.27 per unit, nearly double the first-slab rate.

Commercial (NRGP) bills

Shops and offices up to 40 kW pay the same rate on all units in the month, not slab by slab. The fixed charge is per kW: ₹50 for each of the first 10 kW and ₹85 for each of the next 30 kW.

UnitsEnergyFixedFPPASDutyTotal
100₹435.00₹250.00₹254.78₹103.47₹1,043.25
200₹870.00₹250.00₹509.55₹206.93₹1,836.48
300₹1,305.00₹250.00₹764.33₹310.40₹2,629.73
500₹2,175.00₹250.00₹1,273.88₹517.33₹4,216.21
800₹3,480.00₹250.00₹2,038.20₹827.73₹6,595.93
1000₹4,350.00₹250.00₹2,547.76₹1,034.66₹8,182.42

Table is for a 5 kW post-paid shop with 15% duty and default FPPAS.

  • Loads above 10 kW pay ₹4.65 on all units, and an extra 45 paise on peak-hour units (7 to 11 AM and 6 to 10 PM).
  • Loads above 40 kW fall under a different tariff (LTMD) that this calculator does not cover.

UGVCL service area

UGVCL (Uttar Gujarat Vij Company Limited) distributes power in North Gujarat, including Mehsana, Gandhinagar, Sabarkantha, Banaskantha, Patan and Aravalli districts. Rural rates apply to eligible residential premises in Gram Panchayat areas. For payments, new connections and complaints use the official UGVCL website.

How to lower your UGVCL electricity bill

Stay under 250 unitsUnits above 250 are charged at ₹5.20 for urban homes, the highest slab, before FPPAS and duty.

Use daytime power on a smart meterSmart meters get 60 paise off per unit used between 11 AM and 5 PM.

Use the AC wiselySet a split AC to 24 to 26 °C. It is the biggest load in most North Gujarat homes in summer.

Switch to LED and BLDC fansA 28 W BLDC fan uses far less than a 75 W fan running all day.

Check the fridgeKeep door seals tight and coils clean. A fridge runs all day, so small losses add up.

Read the meter mid-monthNote the reading about 15 days in and use the calculator to see which slab you are heading for.

Why other calculators show a different bill

  • Meter rent added by default. Some tools add ₹30 a month. It is not in the GERC schedule.
  • Fixed charge per kW. Residential fixed charge is a flat amount by load band. Showing it per kW, or using ₹45 for a 1 kW home, overstates the bill.
  • Wrong commercial rate. NRGP energy is ₹4.35 up to 10 kW and ₹4.65 above, not ₹4.50, and fixed charge is ₹50 and ₹85 per kW.
  • Flat fuel charge. A single flat charge per unit ignores that FPPAS changes every quarter.
  • No pre-paid rates. Smart pre-paid meters have their own lower rates.

What this calculator covers

  • Covers: residential urban and rural, BPL, commercial NRGP up to 40 kW, post-paid and pre-paid rates, smart meter concession, editable FPPAS, duty and meter rent.
  • Does not cover: agriculture, industrial, LTMD, temporary and high-tension connections, and Torrent Power areas.
Advertisement

Frequently asked questions

What is the UGVCL electricity rate per unit in 2026-27?

For urban homes on a post-paid meter the energy rate is ₹3.05 for the first 50 units, ₹3.50 for the next 50, ₹4.15 for the next 150 and ₹5.20 above 250 units a month. Rural homes pay ₹2.65, ₹3.10, ₹3.75 and ₹4.90. FPPAS and electricity duty are added on top.

Did the UGVCL tariff change from 1 April 2026?

No. The GERC tariff schedule for UGVCL, DGVCL, MGVCL and PGVCL effective 1 April 2026 keeps the same residential slab rates and fixed charges. FPPAS is separate and changes every quarter.

What is the fixed charge in a UGVCL residential bill?

It is a flat amount per month by connected load, not a rate per kW: ₹15 up to 2 kW, ₹25 above 2 to 4 kW, ₹45 above 4 to 6 kW and ₹70 above 6 kW. BPL households pay ₹5. A 1 kW home pays ₹15, not ₹45.

What is FPPAS on a UGVCL bill?

FPPAS is the Fuel and Power Purchase Adjustment Surcharge, a per-unit charge that GERC lets distribution companies recover under an approved formula. It changes by quarter. This calculator uses ₹2.45 per unit plus a 3.99% variable surcharge by default, so check the FPPAS line on your latest bill and edit it if it differs.

How is electricity duty calculated?

The GERC schedule says tariffs exclude electricity duty and other levies. This calculator applies 15% on energy charges plus FPPAS and leaves the fixed charge out of the base. Check the duty line on your bill and change the percentage if it differs.

Is there a meter rent on a UGVCL bill?

The GERC tariff schedule does not set a meter rent, so the default here is ₹0. Some bills show a separate meter charge. If yours does, add it in the edit box.

What are the UGVCL commercial (NRGP) rates?

Non-RGP shops and offices with a load up to 40 kW pay ₹50 per kW for the first 10 kW and ₹85 per kW for the next 30 kW as fixed charge. Energy is ₹4.35 per unit up to 10 kW and ₹4.65 per unit above 10 kW, on all units. Above 10 kW an extra 45 paise applies to units used from 7 to 11 AM and 6 to 10 PM.

What is the BPL rate in UGVCL?

BPL households pay ₹1.50 per unit for the first 50 units on a post-paid meter, with ₹5 a month fixed charge. Units after the first 50 are billed at the normal residential slab rate.

Which areas does UGVCL serve?

UGVCL (Uttar Gujarat Vij Company Limited) serves North Gujarat, including Mehsana, Gandhinagar, Sabarkantha, Banaskantha, Patan and Aravalli districts. The residential tariff is the same as DGVCL, MGVCL and PGVCL.

Why is my UGVCL bill different from this estimate?

FPPAS changes by quarter, duty and meter charges can differ, and arrears or late fees may be on your bill. Compare each line with the breakdown here and use Edit Slabs & Surcharges to match your bill.

Sources and how we checked this

How we checked these numbers

Slab rates, fixed charges and the NRGP tariff are from the GERC Tariff Schedule for DGVCL, MGVCL, PGVCL and UGVCL effective 1 April 2026, which matches the rates you gave for UGVCL. We tested every example on this page with the same code the calculator runs. FPPAS and duty change or depend on your bill, so they are editable. If you spot an error, contact us.

About the author: Aftab

Aftab builds and maintains the free calculators and guides on Kalikolom. He writes these guides from official tariff orders and keeps the numbers in step with the tool.

Connect on LinkedIn →

Disclaimer. Kalikolom is an independent site and is not affiliated with UGVCL, GUVNL or GERC. This is an estimate for information only. Tariffs, FPPAS and duty can change, so check your official bill for the amount payable.

Related tools

View all tools

More tools

View all tools