Based on the TGERC retail supply tariff for FY 2026–27 (Appendix A), effective 1 April 2026, for TGSPDCL, TGNPDCL and CESS Sircilla. Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your load and units. The calculator applies the TGERC FY 2026–27 tariff with domestic slabs by total units, Gruha Jyothi, commercial, industry, agriculture and HT categories, ToD and excess demand.
Based on the TGERC retail supply tariff for FY 2026–27 (Appendix A), effective 1 April 2026, for TGSPDCL, TGNPDCL and CESS Sircilla. Free, no sign-up. An estimate, not your official bill.
Pick your connection, enter load and units, and the bill breaks down line by line.
Homes use Domestic – LT-I. Shops and offices use Commercial LT-II. Factories use LT-III up to 125 HP, and larger users pick an HT category by voltage.
Use the contracted load from your bill and the units for the month. For HT, enter contract demand in kVA and kVAh units, and recorded demand if you have it.
Turn on Gruha Jyothi if you hold a white ration card, add peak and day-hour units for ToD categories, and choose the green tariff or capacitor surcharge if they apply.
See energy, fixed, customer and each adjustment separately. Enter Electricity Duty and FSA from your bill in Advanced mode to match the final amount.
Everything in the TGERC FY 2026–27 tariff schedule, not just domestic and commercial.
Picks LT-I(A), (B)(i) or (B)(ii) from your total monthly units, then applies the slabs, the fixed charge and the unit-based customer charge.
A single switch gives a zero bill up to 200 units and the full bill above it, the way the scheme works.
Commercial, advertising, salons, industry types, cottage, agriculture, street light, water supply, general, temporary and EV charging.
HT industry, commercial, airports and stations, lift irrigation, townships, railway traction, Metro and EV, at 11 kV, 33 kV and 132 kV and above.
Applies the ₹1.50 peak surcharge, the ₹0.50 day-hour rebate, billing demand, double-rate excess demand and the 15% or 20% energy uplift.
Applies minimum monthly charges for LT categories and minimum kVAh per kVA for HT categories.
The bill has four building blocks. The energy charge is your units multiplied by the slab rate. The fixed charge is a rate per kW (or a demand charge per kVA for HT). The customer charge is a flat monthly amount. Finally come Electricity Duty, the FSA/FCA adjustment and any arrears, which the tariff schedule does not price.
Telangana is served by TGSPDCL in the south, TGNPDCL in the north and CESS in Sircilla. All three use the same tariff schedule approved by the Telangana State Electricity Regulatory Commission (TGERC) for FY 2026–27, from 1 April 2026 to 31 March 2027.
This is the rule that catches most people. Telangana does not just add slabs on top of each other. Your total units for the month choose one of three categories, and then that category's slabs apply.
| Monthly units | Category | Slabs and rates |
|---|---|---|
| Up to 100 | LT-I(A) | 0–50 units ₹1.95; 51–100 units ₹3.10 |
| 101 to 200 | LT-I(B)(i) | 0–100 units ₹3.40; 101–200 units ₹4.80 |
| Above 200 | LT-I(B)(ii) | 0–200 ₹5.10; 201–300 ₹7.70; 301–400 ₹9.00; 401–800 ₹9.50; above 800 ₹10.00 |
So a home using 100 units and one using 101 units are billed on different slab tables, and the customer charge also steps up. That is why a small rise in use near 100 or 200 units can lift the bill sharply.
| Monthly units | Customer charge |
|---|---|
| 0–50 | ₹40 |
| 51–100 | ₹70 |
| 101–200 | ₹90 |
| 201–300 | ₹100 |
| 301–400 | ₹120 |
| 401–800 | ₹140 |
| Above 800 | ₹160 |
The fixed charge is ₹10 per kW of contracted load, and ₹50 per kW when consumption is above 800 units. For a 3 kW home using 350 units the energy is ₹2,240, the fixed charge is ₹30 and the customer charge is ₹120, a total of ₹2,390 before duty and FSA.
Estimated bill before Electricity Duty and FSA, rounded to the nearest rupee.
| Units | 1 kW home | 2 kW home | 3 kW home |
|---|---|---|---|
| 50 | ₹148 | ₹158 | ₹168 |
| 100 | ₹333 | ₹343 | ₹353 |
| 150 | ₹680 | ₹690 | ₹700 |
| 200 | ₹920 | ₹930 | ₹940 |
| 250 | ₹1,515 | ₹1,525 | ₹1,535 |
| 300 | ₹1,900 | ₹1,910 | ₹1,920 |
| 400 | ₹2,820 | ₹2,830 | ₹2,840 |
| 500 | ₹3,790 | ₹3,800 | ₹3,810 |
| 800 | ₹6,640 | ₹6,650 | ₹6,660 |
| 1000 | ₹8,700 | ₹8,750 | ₹8,800 |
Eligible households with a white ration card get free electricity for consumption up to 200 units a month under the Gruha Jyothi scheme. At 200 units or less the bill is zero. At 201 units or more the household pays the entire bill, not only the units above 200. For a 2 kW home, 200 units shows ₹930 under the normal tariff, which Gruha Jyothi waives. At 201 units the bill is ₹1,148.
The scheme is a State government scheme, not part of the TGERC table, so check your own eligibility and bill. The calculator lets you switch it on or off for LT-I connections.
| Line | Amount |
|---|---|
| Energy charge – LT-I(B)(ii) (350 units) | ₹2,240.00 |
| Fixed charge (₹10 × 3 kW) | ₹30.00 |
| Customer charge (monthly) | ₹120.00 |
Every LT and HT category in the tariff schedule, with its main rates.
| Category | Group | Rates and charges |
|---|---|---|
| Domestic – LT-I (A / B by monthly units) | Domestic (LT-I) | The category follows total monthly units. LT-I(A), up to 100 units: ₹1.95 for 0–50 and ₹3.10 for 51–100. LT-I(B)(i), 101–200 units: ₹3.40 for 0–100 and ₹4.80 for 101–200. LT-I(B)(ii), above 200 units: ₹5.10, ₹7.70, ₹9.00, ₹9.50 and ₹10.00 by slab. Fixed charge ₹10 per kW, ₹50 per kW above 800 units. Customer charge ₹40 to ₹160 by units. |
| Non-domestic / commercial – LT-II(A) and (B) | Commercial (LT-II) | LT-II(A), up to 50 units: ₹7.00 per unit and ₹30 per kW. LT-II(B), above 50 units: ₹8.50 for 0–100, ₹9.90 for 101–300, ₹10.40 for 301–500 and ₹11.00 above 500. Fixed ₹70 per kW up to 300 units and ₹100 per kW above. Customer charge ₹50 to ₹160 by units. Minimum charge ₹50 single phase, ₹100 three phase. |
| Advertising hoardings – LT-II(C) | Commercial (LT-II) | ₹13.00 per unit, ₹150 per kW fixed, customer charge ₹160, minimum charge ₹300 a month. |
| Haircutting salons up to 200 units – LT-II(D) | Commercial (LT-II) | ₹5.30 for 0–50 units, ₹6.60 for 51–100 and ₹7.50 for 101–200. Fixed ₹60 per kW. Customer charge ₹45, ₹55 or ₹65 by units. Minimum charge ₹65 single phase, ₹200 three phase. |
| LT industry – LT-III (general) | Industry (LT-III) | ₹7.70 per unit, ₹100 per kW fixed. Customer charge ₹100 up to 20 HP, ₹350 for 21–50 HP and ₹1,200 for 51–125 HP. |
| LT industry – seasonal (off-season) | Industry (LT-III) | ₹8.40 per unit. Fixed charge ₹100 per kW on 30% of contracted load. Customer charge by HP as for LT-III. |
| LT industry – pisciculture / prawn culture | Industry (LT-III) | ₹6.20 per unit, ₹50 per kW fixed. |
| LT industry – sugarcane crushing | Industry (LT-III) | ₹6.20 per unit, ₹50 per kW fixed. |
| LT industry – poultry farms | Industry (LT-III) | ₹7.00 per unit, ₹65 per kW fixed. |
| LT industry – mushroom, rabbit, sheep and goat farms | Industry (LT-III) | ₹7.30 per unit, ₹100 per kW fixed. |
| Cottage industries – LT-IV(A) | Cottage and agro (LT-IV) | ₹4.00 per unit, ₹20 per kW fixed, customer charge ₹50. |
| Agro based activities – LT-IV(B) | Cottage and agro (LT-IV) | ₹4.00 per unit, ₹20 per kW fixed, customer charge ₹50. Connected load limit 20 HP, or 25 HP for mushroom, rabbit, sheep, goat and dairy farming. |
| Agriculture – corporate farmers (DSM mandatory) | Agriculture (LT-V) | ₹2.50 per unit with no fixed charge. Customer charge ₹30. |
| Agriculture – other than corporate farmers | Agriculture (LT-V) | ₹0.00 per unit with no fixed charge. Customer charge ₹30. |
| Horticulture nurseries up to 20 HP – LT-V(B) | Agriculture (LT-V) | ₹4.00 per unit, ₹20 per HP fixed, customer charge ₹30. |
| Street lighting – Panchayats | Street light and water supply (LT-VI) | ₹7.10 per unit, ₹32 per kW fixed, customer charge ₹120. |
| Street lighting – Municipalities | Street light and water supply (LT-VI) | ₹7.60 per unit, ₹32 per kW fixed, customer charge ₹120. |
| Street lighting – Municipal Corporations | Street light and water supply (LT-VI) | ₹8.10 per unit, ₹32 per kW fixed, customer charge ₹120. |
| Protected water supply (PWS) – Panchayats | Street light and water supply (LT-VI) | ₹6.00 per unit. Fixed ₹32 per HP, subject to a minimum of ₹50 a month. Customer charge ₹120. |
| Protected water supply (PWS) – Municipalities | Street light and water supply (LT-VI) | ₹7.10 per unit. Fixed ₹32 per HP, subject to a minimum of ₹100 a month. Customer charge ₹120. |
| Protected water supply (PWS) – Municipal Corporations | Street light and water supply (LT-VI) | ₹7.60 per unit. Fixed ₹32 per HP, subject to a minimum of ₹100 a month. Customer charge ₹120. |
| General purpose – LT-VII(A) | General, temporary and EV (LT) | ₹8.30 per unit, ₹21 per kW fixed, customer charge ₹100. Minimum charge ₹50 single phase, ₹150 three phase. |
| Wholly religious places – LT-VII(B) | General, temporary and EV (LT) | ₹5.00 per unit, ₹30 per kW fixed, customer charge ₹100. |
| Temporary supply – LT-VIII | General, temporary and EV (LT) | ₹12.00 per unit, ₹21 per kW fixed, customer charge ₹100. Minimum charge ₹125 per kW or part of the contracted load for the first 30 days. |
| EV charging station – LT-IX | General, temporary and EV (LT) | ₹6.00 per unit, no fixed charge, customer charge ₹120. Minimum charge ₹65 single phase, ₹200 three phase. |
| HT-I(A) industry general – 11 kV | HT industry (HT-I) | ₹7.65 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-I(A) industry general – 33 kV | HT industry (HT-I) | ₹7.15 per kVAh, demand charge ₹500 per kVA. Customer charge ₹3500. |
| HT-I(A) industry general – 132 kV and above | HT industry (HT-I) | ₹6.65 per kVAh, demand charge ₹500 per kVA. Customer charge ₹5000. |
| HT-I(A) lights and fans – 11 kV | HT industry (HT-I) | ₹7.65 per kVAh, no demand charge. Customer charge ₹2000. |
| HT-I(A) lights and fans – 33 kV | HT industry (HT-I) | ₹7.15 per kVAh, no demand charge. Customer charge ₹3500. |
| HT-I(A) lights and fans – 132 kV and above | HT industry (HT-I) | ₹6.65 per kVAh, no demand charge. Customer charge ₹5000. |
| HT-I(A) poultry farms – 11 kV | HT industry (HT-I) | ₹7.65 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-I(A) poultry farms – 33 kV | HT industry (HT-I) | ₹7.15 per kVAh, demand charge ₹500 per kVA. Customer charge ₹3500. |
| HT-I(A) colony consumption – 11 kV | HT industry (HT-I) | ₹7.30 per kVAh, no demand charge. Customer charge ₹2000. |
| HT-I(A) colony consumption – 33 kV | HT industry (HT-I) | ₹7.30 per kVAh, no demand charge. Customer charge ₹3500. |
| HT-I(A) colony consumption – 132 kV and above | HT industry (HT-I) | ₹7.30 per kVAh, no demand charge. Customer charge ₹5000. |
| HT-I(A) seasonal industries – 11 kV | HT industry (HT-I) | ₹8.60 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-I(A) seasonal industries – 33 kV | HT industry (HT-I) | ₹7.90 per kVAh, demand charge ₹500 per kVA. Customer charge ₹3500. |
| HT-I(A) seasonal industries – 132 kV and above | HT industry (HT-I) | ₹7.70 per kVAh, demand charge ₹500 per kVA. Customer charge ₹5000. |
| HT-I(B) ferro alloys – 11 kV | HT industry (HT-I) | ₹7.65 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-I(B) ferro alloys – 33 kV | HT industry (HT-I) | ₹7.15 per kVAh, demand charge ₹500 per kVA. Customer charge ₹3500. |
| HT-I(B) ferro alloys – 132 kV and above | HT industry (HT-I) | ₹6.65 per kVAh, demand charge ₹500 per kVA. Customer charge ₹5000. |
| HT-II(A) others – 11 kV | HT commercial and others | ₹8.80 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-II(A) others – 33 kV | HT commercial and others | ₹8.00 per kVAh, demand charge ₹500 per kVA. Customer charge ₹3500. |
| HT-II(A) others – 132 kV and above | HT commercial and others | ₹7.80 per kVAh, demand charge ₹500 per kVA. Customer charge ₹5000. |
| HT-II(B) wholly religious places – 11 kV | HT commercial and others | ₹5.00 per kVAh, demand charge ₹285 per kVA. Customer charge ₹2000. |
| HT-II(B) wholly religious places – 33 kV | HT commercial and others | ₹5.00 per kVAh, demand charge ₹285 per kVA. Customer charge ₹3500. |
| HT-II(B) wholly religious places – 132 kV and above | HT commercial and others | ₹5.00 per kVAh, demand charge ₹285 per kVA. Customer charge ₹5000. |
| HT-III airports, railway stations and bus stations – 11 kV | HT commercial and others | ₹8.50 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-III airports, railway stations and bus stations – 33 kV | HT commercial and others | ₹7.85 per kVAh, demand charge ₹500 per kVA. Customer charge ₹3500. |
| HT-III airports, railway stations and bus stations – 132 kV and above | HT commercial and others | ₹7.45 per kVAh, demand charge ₹500 per kVA. Customer charge ₹5000. |
| HT-IV(A) irrigation and agriculture (lift irrigation) – 11 kV | HT agriculture and others | ₹6.30 per kVAh, demand charge ₹300 per kVA. Customer charge ₹2000. |
| HT-IV(A) irrigation and agriculture (lift irrigation) – 33 kV | HT agriculture and others | ₹6.30 per kVAh, demand charge ₹300 per kVA. Customer charge ₹3500. |
| HT-IV(A) irrigation and agriculture (lift irrigation) – 132 kV and above | HT agriculture and others | ₹6.30 per kVAh, demand charge ₹300 per kVA. Customer charge ₹5000. |
| HT-IV(B) CPWS schemes – 11 kV | HT agriculture and others | ₹6.10 per kVAh, no demand charge. Customer charge ₹2000. |
| HT-IV(B) CPWS schemes – 33 kV | HT agriculture and others | ₹6.10 per kVAh, no demand charge. Customer charge ₹3500. |
| HT-IV(B) CPWS schemes – 132 kV and above | HT agriculture and others | ₹6.10 per kVAh, no demand charge. Customer charge ₹5000. |
| HT-VI townships and residential colonies – 11 kV | HT agriculture and others | ₹7.30 per kVAh, demand charge ₹285 per kVA. Customer charge ₹2000. |
| HT-VI townships and residential colonies – 33 kV | HT agriculture and others | ₹7.30 per kVAh, demand charge ₹285 per kVA. Customer charge ₹3500. |
| HT-VI townships and residential colonies – 132 kV and above | HT agriculture and others | ₹7.30 per kVAh, demand charge ₹285 per kVA. Customer charge ₹5000. |
| HT-VII temporary supply – 11 kV | HT agriculture and others | ₹11.80 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-VII temporary supply – 33 kV | HT agriculture and others | ₹11.00 per kVAh, demand charge ₹500 per kVA. Customer charge ₹3500. |
| HT-VII temporary supply – 132 kV and above | HT agriculture and others | ₹10.80 per kVAh, demand charge ₹500 per kVA. Customer charge ₹5000. |
| HT-IX EV charging stations – 11 kV | HT agriculture and others | ₹6.00 per kVAh, demand charge ₹100 per kVA. Customer charge ₹2000. |
| HT-IX EV charging stations – 33 kV | HT agriculture and others | ₹6.00 per kVAh, demand charge ₹100 per kVA. Customer charge ₹3500. |
| HT-IX EV charging stations – 132 kV and above | HT agriculture and others | ₹6.00 per kVAh, demand charge ₹100 per kVA. Customer charge ₹5000. |
| HT-VIII RESCOs – 11 kV | HT agriculture and others | ₹4.77 per kVAh, no demand charge. Customer charge ₹2000. |
| HT-V(A) railway traction | Railway and HMR | ₹5.05 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-V(B) Hyderabad Metro Rail (HMR) | Railway and HMR | ₹4.95 per kVAh, demand charge ₹500 per kVA. Customer charge ₹2000. |
| HT-I(A) optional category, CMD up to 150 kVA – 11 kV | HT industry (HT-I) | ₹8.00 per kVAh, demand charge ₹100 per kVA. Customer charge ₹2000. |
Non-domestic users with up to 50 units a month are in LT-II(A) at ₹7.00 per unit and ₹30 per kW fixed. Above 50 units, LT-II(B) applies: ₹8.50 for 0–100 units, ₹9.90 for 101–300, ₹10.40 for 301–500 and ₹11.00 above 500. The fixed charge is ₹70 per kW up to 300 units and ₹100 per kW above that. A minimum monthly charge of ₹50 (single phase) or ₹100 (three phase) applies, and the customer charge runs from ₹50 to ₹160 by units.
| Units | 2 kW single phase | 2 kW three phase |
|---|---|---|
| 50 | ₹460 | ₹460 |
| 100 | ₹1,080 | ₹1,080 |
| 200 | ₹2,085 | ₹2,085 |
| 300 | ₹3,075 | ₹3,075 |
| 500 | ₹5,230 | ₹5,230 |
| 1000 | ₹10,770 | ₹10,770 |
Example: a 3 kW shop using 200 units pays ₹1,840 energy, ₹210 fixed and ₹105 customer charge, which is ₹2,155 before duty and FSA.
| Category | Energy charge | Fixed charge |
|---|---|---|
| LT-III industry general | ₹7.70 per unit | ₹100 per kW |
| LT-III seasonal | ₹8.40 per unit | ₹100 per kW on 30% of load |
| LT-III pisciculture, prawn, sugarcane | ₹6.20 per unit | ₹50 per kW |
| LT-III poultry | ₹7.00 per unit | ₹65 per kW |
| LT-IV cottage and agro | ₹4.00 per unit | ₹20 per kW |
| LT-V corporate farmers | ₹2.50 per unit | None |
| LT-V other farmers | ₹0.00 per unit | None |
| LT-VI street light | ₹7.10, ₹7.60, ₹8.10 | ₹32 per kW |
| LT-VI protected water supply | ₹6.00, ₹7.10, ₹7.60 | ₹32 per HP with a minimum |
| LT-VII general purpose | ₹8.30 per unit | ₹21 per kW |
| LT-VIII temporary | ₹12.00 per unit | ₹21 per kW |
| LT-IX EV charging | ₹6.00 per unit | None |
HT consumers are billed in kVAh. The demand charge is ₹500 per kVA for most categories, charged on billing demand, which is the higher of recorded maximum demand and 80% of contract demand. Lift irrigation uses 80% from July to November and 25% from December to June. Townships use actual recorded demand.
| HT category | 11 kV | 33 kV | 132 kV and above |
|---|---|---|---|
| HT-I(A) industry general | ₹7.65 | ₹7.15 | ₹6.65 |
| HT-I(A) seasonal | ₹8.60 | ₹7.90 | ₹7.70 |
| HT-II(A) others | ₹8.80 | ₹8.00 | ₹7.80 |
| HT-III airports, stations | ₹8.50 | ₹7.85 | ₹7.45 |
| HT-IV(A) lift irrigation | ₹6.30 | ₹6.30 | ₹6.30 |
| HT-VII temporary | ₹11.80 | ₹11.00 | ₹10.80 |
| HT-IX EV charging | ₹6.00 | ₹6.00 | ₹6.00 |
A 200 kVA HT-I(A) consumer at 11 kV using 50,000 kVAh pays ₹3,82,500 energy, ₹80,000 demand charge (160 kVA billing demand) and ₹2,000 customer charge, a total of ₹4,64,500.
| Recorded demand vs contract | Demand charge on excess | Energy charge |
|---|---|---|
| Up to 100% | None | Normal |
| 100% to 120% | 2 times | Normal |
| 120% to 200% | 2 times | 1.15 times on all units |
| Above 200% | 2 times | 1.20 times on all units |
For railway traction and Hyderabad Metro the energy charge is 1.05 times on all units if recorded demand is above 120%. Minimum energy is 50 kVAh per kVA for HT-I(A), HT-I(B) and HT-III, 25 for HT-II and townships and EV, and 32 for railway and Metro. If you use less, the minimum is billed. With the same 200 kVA consumer at 250 kVA recorded demand, the bill rises to ₹5,91,875.
| Window | Hours | Effect per unit |
|---|---|---|
| Peak | 6–10 am and 6–10 pm | +₹1.50 |
| Normal | 10 pm–6 am | No change |
| Day | 10 am–6 pm | −₹0.50 |
ToD applies to HT-I(A) industry general and poultry, HT-II(A), HT-II(B), HT-III and HT-IX. For 10,000 peak units and 20,000 day units the adjustment is ₹15,000 less ₹10,000, a net ₹5,000 added.
| Service | Charge |
|---|---|
| Reconnection, LT-I(A) | ₹25 |
| Reconnection, overhead LT | ₹75 |
| Reconnection, underground LT | ₹200 |
| Reconnection, HT 11 kV / 33 kV / 132 kV+ | ₹1,000 / ₹2,000 / ₹3,000 |
| Meter test, single phase / three phase | ₹100 / ₹300 |
| Supervision charge, LT / HT | ₹100 / ₹600 |
The tariff says duty is extra and gives no figure. The calculator leaves it at 0 until you enter your per-unit amount in Advanced mode.
No rate is set in the schedule. Enter the per-unit amount from your bill.
Taken from State government scheme rules, not from the TGERC table. Eligibility is your responsibility.
The schedule does not state a rounding rule for load, so the load you enter is used as it is.
Arrears, late payment charges, meter charges and any State subsidy beyond Gruha Jyothi are not part of the estimate.
Your real bill can differ by a few rupees. Check it against your bill.
The category changes at 100 and 200 units, so small cuts near these marks save the most.
A white ration card holder using 200 units or less pays nothing.
Fixed charges follow contracted load, so a lower sanction cuts the monthly fixed charge.
For ToD categories, day units get ₹0.50 off while peak units cost ₹1.50 more.
Going above contract demand doubles the demand charge on the excess and can raise energy rates.
A defunct capacitor adds 25% to the bill for the affected LT categories.
Telangana State Electricity Regulatory Commission, retail supply tariff for FY 2026–27, Appendix A tariff abstract, effective 1 April 2026 to 31 March 2027, for TGSPDCL, TGNPDCL and CESS Sircilla.
A Telangana bill adds the energy charge for your units, a fixed charge on your load (or a demand charge in kVA for HT), and a monthly customer charge. Electricity Duty, the FSA/FCA adjustment and any arrears come on top. Domestic units are billed in slabs, and the slab set depends on your total monthly units.
For homes using up to 100 units the rate is ₹1.95 for 0–50 units and ₹3.10 for 51–100. Between 101 and 200 units it is ₹3.40 for the first 100 and ₹4.80 for the next 100. Above 200 units it is ₹5.10, ₹7.70, ₹9.00, ₹9.50 and ₹10.00 across five slabs. Commercial LT-II(B) runs from ₹8.50 to ₹11.00 per unit.
Telangana picks the domestic category from your total units. At 100 units or less you are in LT-I(A) and the lowest rates apply. At 101 to 200 you move to LT-I(B)(i), and above 200 to LT-I(B)(ii). The jump is real, and the customer charge also rises with each band. A home at 200 units pays about ₹930 with a 2 kW load, while 201 units costs about ₹1,148.
Gruha Jyothi is a State scheme that gives eligible domestic consumers, those with a white ration card, free electricity up to 200 units a month. If you use 200 units or less the bill is zero. If you cross 200 units the scheme does not apply and the whole bill is payable, not just the extra units. The calculator has a Gruha Jyothi switch for LT-I. The scheme comes from State government orders, not from the TGERC tariff table.
It is a fixed monthly charge that does not depend on your load. Domestic customers pay ₹40 up to 50 units, ₹70 for 51–100, ₹90 for 101–200, ₹100 for 201–300, ₹120 for 301–400, ₹140 for 401–800 and ₹160 above 800. Commercial LT-II pays ₹50 to ₹160 by units, and HT pays ₹2,000 at 11 kV, ₹3,500 at 33 kV and ₹5,000 at 132 kV and above.
₹10 per kW of contracted load per month. For consumption above 800 units it is ₹50 per kW. Commercial LT-II(A) pays ₹30 per kW, LT-II(B) pays ₹70 per kW up to 300 units and ₹100 per kW above that.
Shops and offices using up to 50 units are in LT-II(A) at ₹7.00 per unit. Above 50 units they are in LT-II(B), with ₹8.50 for 0–100, ₹9.90 for 101–300, ₹10.40 for 301–500 and ₹11.00 above 500. A fixed charge, a customer charge and a minimum charge of ₹50 (single phase) or ₹100 (three phase) also apply.
HT consumers pay per kVAh plus a demand charge per kVA of billing demand, which is the higher of recorded demand and 80% of contract demand. A minimum energy charge applies, for example 50 kVAh per kVA for HT-I(A). Time-of-Day adds ₹1.50 per unit in peak hours and takes off ₹0.50 per unit in day hours for the categories that carry ToD.
For HT-I(A) industry general and poultry, HT-II(A), HT-II(B), HT-III and HT-IX, units used from 6 am to 10 am and 6 pm to 10 pm cost ₹1.50 more, and units from 10 am to 6 pm cost ₹0.50 less. Night units from 10 pm to 6 am are at the normal rate. Enter your peak and day-hour units from the bill and the calculator applies the adjustment.
The demand charge on the excess is billed at 2 times. When recorded demand is more than 120% of contract demand, the energy charge on all units rises by 15%, and above 200% by 20%. For railway traction and Hyderabad Metro the energy charge rises 5% above 120%. The calculator shows each of these lines.
It is a voluntary option. Consumers who choose it pay ₹0.66 per unit extra on all units. It is off by default in the calculator.
No. The tariff order states that the rates exclude Electricity Duty under the Telangana Electricity Duty Act, and that FSA/FCA is charged separately. The orders give no fixed figure for either, so enter the per-unit amount from your own bill in Advanced mode.
The tariff order covers TGSPDCL (Southern Power Distribution Company), TGNPDCL (Northern Power Distribution Company) and CESS Sircilla. These were earlier known as TSSPDCL and TSNPDCL. The same retail tariff applies in all three areas.
A 25% surcharge on the billed amount applies to certain LT consumers whose capacitors are defunct: LT-II and LT-VII(A) with loads under 10 kW, and LT-III and LT-VI(B) under 13 HP. Domestic consumers are exempt. Switch it on in the calculator if your bill carries it.
It follows the TGERC FY 2026–27 tariff schedule line by line. Your real bill can differ by a few rupees because of Electricity Duty, FSA, arrears, rounding of load and meter details. Use it as an estimate and check against your bill.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.