Based on the OERC Retail Supply Tariff Order for FY 2026–27 (Annexure-B), effective 1 April 2026, for TPCODL, TPNODL, TPWODL and TPSODL. Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your load and units. The calculator applies the OERC FY 2026–27 tariff for homes, Kutir Jyoti, shops, farms, industry, HT and EHT, with rebates, ToD and load-factor energy slabs.
Based on the OERC Retail Supply Tariff Order for FY 2026–27 (Annexure-B), effective 1 April 2026, for TPCODL, TPNODL, TPWODL and TPSODL. Free, no sign-up. An estimate, not your official bill.
Pick your connection, enter load and units, and the bill breaks down line by line.
Homes use Domestic – LT, or Kutir Jyoti if eligible. Shops and offices use General purpose. Farms, small factories, institutions and water works have their own LT rows. Users of 110 kVA and above pick an LT three-part, HT or EHT row.
Use the connected load from your bill and the units for the month. For HT and EHT enter contract demand in kVA and kVAh units, plus recorded demand if you have it.
Say whether you paid by the due date or digitally, and whether you are on a prepaid meter or e-bill. Add ToD units, rural domestic status or temporary supply if they apply.
See energy, fixed or demand charge, each rebate and the total. Add Electricity Duty and meter rent from your bill in Advanced mode to match the final amount.
The whole OERC FY 2026–27 tariff, not just homes.
Slabs of ₹2.90, ₹4.70, ₹5.70 and ₹6.10, the ₹20 per kW fixed charge, and the flat ₹70 Kutir Jyoti tariff.
The order does not say how slabs are applied. The calculator offers slab by slab and whole-consumption methods so you can match your bill.
General purpose, irrigation, allied agriculture, agro-industry, public lighting, small and medium industry, institutions, water works and EV charging.
Demand charge, customer service charge, load-factor energy slabs, overdrawl penalty and the railway, steel, EHT industry and mega lift rebates.
Prompt payment, rural domestic, digital 4%, prepaid 4% and e-bill, each applied the way the order sets out.
Solar-hour discount and peak surcharge of 10% for smart-meter consumers above 10 kW, effective 1 July 2026.
An Odisha bill has an energy charge for your units and a fixed element. For LT homes and small users the fixed element is a minimum fixed charge per kW. For users of 110 kVA and above it is a demand charge per kVA plus a monthly customer service charge. Rebates are then deducted, and Electricity Duty, meter rent and arrears are added.
Four companies distribute power in Odisha: TPCODL, TPNODL, TPWODL and TPSODL. All four apply the retail supply tariff approved by the Odisha Electricity Regulatory Commission (OERC) for FY 2026–27, effective from 1 April 2026. The tariff has stayed the same as the previous year.
| Monthly consumption | Energy charge |
|---|---|
| Up to 50 units | ₹2.90 per unit |
| 51 to 200 units | ₹4.70 per unit |
| 201 to 400 units | ₹5.70 per unit |
| Above 400 units | ₹6.10 per unit |
The fixed charge is ₹20 for the first kW or part of a kW and ₹20 for each additional kW or part. A 1.2 kW load is therefore charged as 2 kW, or ₹40 a month. Kutir Jyoti households using up to 30 units pay only ₹70.
The order and its Annexure-B list the domestic rate by consumption band but give no worked example. Most bill calculators apply the bands slab by slab, so each rate covers only the units inside its band. Some pages apply the band rate to every unit. The two methods give very different answers once you pass 200 units, so check which one your bill follows. This calculator defaults to slab by slab and lets you switch.
| Units | Slab by slab (2 kW home) | Total-units rate on all units (2 kW home) |
|---|---|---|
| 100 | ₹420 | ₹510 |
| 200 | ₹890 | ₹980 |
| 300 | ₹1,460 | ₹1,750 |
| 400 | ₹2,030 | ₹2,320 |
| 500 | ₹2,640 | ₹3,090 |
Estimated bill, slab by slab, before Electricity Duty and rebates, rounded to the nearest rupee.
| Units | 1 kW home | 2 kW home | 3 kW home |
|---|---|---|---|
| 30 | ₹107 | ₹127 | ₹147 |
| 50 | ₹165 | ₹185 | ₹205 |
| 100 | ₹400 | ₹420 | ₹440 |
| 150 | ₹635 | ₹655 | ₹675 |
| 200 | ₹870 | ₹890 | ₹910 |
| 250 | ₹1,155 | ₹1,175 | ₹1,195 |
| 300 | ₹1,440 | ₹1,460 | ₹1,480 |
| 400 | ₹2,010 | ₹2,030 | ₹2,050 |
| 500 | ₹2,620 | ₹2,640 | ₹2,660 |
| 600 | ₹3,230 | ₹3,250 | ₹3,270 |
| 800 | ₹4,450 | ₹4,470 | ₹4,490 |
| Line | Amount |
|---|---|
| Energy charge (250 units, slab by slab) | ₹1,135.00 |
| Minimum fixed charge (2 kW: ₹20 + ₹20 × 1) | ₹40.00 |
Energy is 50 × ₹2.90 + 150 × ₹4.70 + 50 × ₹5.70 = ₹1,135. Fixed charge is ₹40, so the bill is ₹1,175 before duty.
| Rebate | Who gets it | Amount |
|---|---|---|
| Prompt payment | Domestic, general purpose below 110 kVA, irrigation, allied agriculture, LT industrial (S), water works; HT bulk domestic, irrigation, allied agriculture, general purpose 70–110 kVA, water works | ₹0.10 per unit if paid by the due date |
| Prompt payment, other categories | All other categories | 1% of the bill if paid within 3 working days |
| Rural domestic | LT domestic with a correct meter paying on time | Extra ₹0.10 per unit |
| Digital payment | LT domestic and single-phase general purpose | 4% of the bill, over other rebates |
| Prepaid meter | All prepaid consumers | 4% on the prepaid amount |
| E-bill | Anyone choosing e-bill | ₹10 per bill |
| LT industry load factor | LT industrial (S) and (M) paying on time with load factor above 30% | ₹0.10 per unit |
| Railway traction | Railway traction, HT and EHT | ₹0.25 per unit |
| EHT industry | EHT industry above 80% load factor | ₹0.30 per unit beyond 80% |
| Steel plants without CGP | CD 1 MVA and above | 8% to 20% of energy charge by load factor |
Example: a 2 kW rural home using 200 units that pays digitally by the due date and takes the e-bill. Energy is ₹850 and fixed ₹40. The prompt rebate takes off ₹20, the rural rebate ₹20 and the 4% digital rebate ₹34 (on ₹850), plus ₹10 for the e-bill. The bill falls from ₹890 to ₹806.
| Monthly consumption | Energy charge |
|---|---|
| Up to 100 units | ₹5.90 per unit |
| 101 to 300 units | ₹7.00 per unit |
| Above 300 units | ₹7.60 per unit |
The fixed charge is ₹30 for the first kW or part and ₹30 for each extra kW or part. A 3 kW shop is charged ₹90. Bills for a 3 kW shop on the slab-by-slab method:
| Units | 3 kW general purpose bill |
|---|---|
| 50 | ₹385 |
| 100 | ₹680 |
| 200 | ₹1,380 |
| 300 | ₹2,080 |
| 500 | ₹3,600 |
| 1000 | ₹7,400 |
Every row in the tariff schedule, with its main rates.
| Category | Group | Rates and charges |
|---|---|---|
| Domestic – LT (other than Kutir Jyoti) | LT domestic and general purpose | Up to 50 units ₹2.90; 51–200 ₹4.70; 201–400 ₹5.70; above 400 ₹6.10 per kWh. Minimum fixed charge ₹20 for the first kW or part and ₹20 for each additional kW or part. |
| General purpose – LT below 110 kVA | LT domestic and general purpose | Up to 100 units ₹5.90; 101–300 ₹7.00; above 300 ₹7.60 per kWh. Minimum fixed charge ₹30 for the first kW or part and ₹30 for each additional kW or part. |
| EV charging station (general purpose, single part) | LT domestic and general purpose | ₹5.00 per unit single part tariff, no fixed charge. |
| Irrigation pumping and agriculture – LT | LT agriculture and allied | ₹1.50 per kWh on all units. Minimum fixed charge ₹20 for the first kW or part and ₹10 for each extra kW or part. |
| Allied agricultural activities – LT | LT agriculture and allied | ₹1.60 per kWh on all units. Minimum fixed charge ₹20 for the first kW or part and ₹10 for each extra kW or part. |
| Allied agro-industrial activities – LT | LT agriculture and allied | ₹3.10 per kWh on all units. Minimum fixed charge ₹80 for the first kW or part and ₹50 for each extra kW or part. |
| Public lighting – LT | LT industry and others | ₹6.20 per kWh on all units. Minimum fixed charge ₹20 for the first kW or part and ₹15 for each extra kW or part. |
| LT industrial (S) supply below 22 kVA | LT industry and others | ₹6.20 per kWh on all units. Minimum fixed charge ₹80 for the first kW or part and ₹35 for each extra kW or part. |
| LT industrial (M) supply 22 kVA to below 110 kVA | LT industry and others | ₹6.20 per kWh on all units. Minimum fixed charge ₹100 for the first kW or part and ₹80 for each extra kW or part. |
| Specified public purpose – LT | LT industry and others | ₹6.20 per kWh on all units. Minimum fixed charge ₹50 for the first kW or part and ₹50 for each extra kW or part. |
| Public water works and sewerage pumping – LT below 110 kVA | LT industry and others | ₹6.20 per kWh on all units. Minimum fixed charge ₹50 for the first kW or part and ₹50 for each extra kW or part. |
| Public water works and sewerage pumping – LT 110 kVA and above | LT three-part (110 kVA and above) | ₹6.20 per kWh, demand charge ₹200 per kVA of billing demand, customer service charge ₹30 a month. |
| General purpose – LT 110 kVA and above | LT three-part (110 kVA and above) | ₹6.20 per kWh, demand charge ₹200 per kVA of billing demand, customer service charge ₹30 a month. |
| Large industry – LT 110 kVA and above | LT three-part (110 kVA and above) | ₹6.20 per kWh, demand charge ₹200 per kVA of billing demand, customer service charge ₹30 a month. |
| Bulk supply domestic – HT | HT bulk supply | ₹4.90 per kVAh, demand charge ₹20 per kVA, customer service charge ₹250. |
| Irrigation pumping and agriculture – HT | HT agriculture and allied | ₹1.40 per kVAh, demand charge ₹30 per kVA, customer service charge ₹250. |
| Allied agricultural activities – HT | HT agriculture and allied | ₹1.50 per kVAh, demand charge ₹30 per kVA, customer service charge ₹250. |
| Allied agro-industrial activities – HT | HT agriculture and allied | ₹3.00 per kVAh, demand charge ₹50 per kVA, customer service charge ₹250. |
| Specified public purpose – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. |
| General purpose above 70 kVA, below 110 kVA – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. |
| HT industrial (M) supply | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹150 per kVA. Customer service charge ₹250. |
| General purpose 110 kVA and above – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. |
| Public water works and sewerage pumping – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. |
| Large industry – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. |
| Power intensive industry – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. |
| Mini steel plant – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. |
| Railway traction – HT | HT general, industry and others | Energy by load factor: ₹5.85 per kVAh up to 60%, ₹4.75 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹250. Rebate of 25 paise per kVAh. |
| Emergency supply to CGP – HT | HT general, industry and others | ₹7.80 per kVAh flat, no demand charge, customer service charge ₹250. |
| Colony consumption – HT | HT general, industry and others | ₹4.90 per kVAh, no demand charge and no customer service charge. |
| Mega lift irrigation points – HT (general purpose, no demand charge) | HT general, industry and others | Treated as general purpose, no demand charge. Rebate ₹2.00 per kVAh in solar hours and ₹1.00 in other hours. |
| General purpose – EHT | EHT supply | Energy by load factor: ₹5.80 per kVAh up to 60%, ₹4.70 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹700. |
| Large industry – EHT | EHT supply | Energy by load factor: ₹5.80 per kVAh up to 60%, ₹4.70 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹700. |
| Heavy industry – EHT | EHT supply | Energy by load factor: ₹5.80 per kVAh up to 60%, ₹4.70 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹700. |
| Power intensive industry – EHT | EHT supply | Energy by load factor: ₹5.80 per kVAh up to 60%, ₹4.70 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹700. |
| Mini steel plant – EHT | EHT supply | Energy by load factor: ₹5.80 per kVAh up to 60%, ₹4.70 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹700. |
| Railway traction – EHT | EHT supply | Energy by load factor: ₹5.80 per kVAh up to 60%, ₹4.70 above 60%, on all units. Demand charge ₹250 per kVA. Customer service charge ₹700. Rebate of 25 paise per kVAh. |
| Emergency supply to CGP – EHT | EHT supply | ₹7.70 per kVAh flat, no demand charge, customer service charge ₹700. |
| Colony consumption – EHT | EHT supply | ₹4.85 per kVAh, no demand charge and no customer service charge. |
| Mega lift irrigation points – EHT (general purpose, no demand charge) | EHT supply | Treated as general purpose, no demand charge. Rebate ₹2.00 per kVAh in solar hours and ₹1.00 in other hours. |
| Category | Energy charge | Fixed charge (first kW, each extra kW) |
|---|---|---|
| Irrigation pumping and agriculture | ₹1.50 | ₹20, ₹10 |
| Allied agricultural activities | ₹1.60 | ₹20, ₹10 |
| Allied agro-industrial | ₹3.10 | ₹80, ₹50 |
| Public lighting | ₹6.20 | ₹20, ₹15 |
| LT industrial (S), below 22 kVA | ₹6.20 | ₹80, ₹35 |
| LT industrial (M), 22 to below 110 kVA | ₹6.20 | ₹100, ₹80 |
| Specified public purpose | ₹6.20 | ₹50, ₹50 |
| Public water works, below 110 kVA | ₹6.20 | ₹50, ₹50 |
| LT 110 kVA and above (water works, general purpose, large industry) | ₹6.20 | Demand ₹200 per kVA, customer charge ₹30 |
For general purpose, specified public purpose, industrial, large industry, power intensive, mini steel, railway and water works at HT and EHT, the energy rate depends on load factor. The rate applies to all units in the month.
| Load factor | HT (per kVAh) | EHT (per kVAh) |
|---|---|---|
| 60% or below | ₹5.85 | ₹5.80 |
| Above 60% | ₹4.75 | ₹4.70 |
Load factor is units divided by contract demand times hours in the billing period, with power interruption above 60 hours deducted from the hours. Fixed-rate HT categories are bulk domestic ₹4.90, irrigation ₹1.40, allied agriculture ₹1.50, agro-industry ₹3.00, colony consumption ₹4.90 and emergency supply to CGP ₹7.80 per kVAh.
| Supply | Demand charge per kVA | Customer service charge |
|---|---|---|
| LT, 110 kVA and above | ₹200 | ₹30 |
| HT general, industrial, public purpose, railway | ₹250 | ₹250 |
| HT industrial (M) | ₹150 | ₹250 |
| HT bulk domestic | ₹20 | ₹250 |
| HT irrigation and allied agriculture | ₹30 | ₹250 |
| HT agro-industry | ₹50 | ₹250 |
| EHT | ₹250 | ₹700 |
Billing demand is the higher of recorded maximum demand and 80% of contract demand. Example: a large industry at HT with 500 kVA contract demand, 450 kVA recorded demand and 2,00,000 kVAh in a 30-day month has a load factor of 55.56%.
| Line | Amount |
|---|---|
| Energy charge (200000 kVAh, load factor 55.56%) | ₹1,170,000.00 |
| Demand charge (₹250 × 450 kVA billing demand) | ₹112,500.00 |
| Customer service charge (monthly) | ₹250.00 |
Consumers of 110 kVA and above may draw up to 120% of contract demand in solar and normal hours with no penalty, as long as peak-hour demand stays within contract demand. Demand above 120% in those hours is penalised at ₹250 per kVA on the excess. If peak-hour demand goes above contract demand, the penalty applies on all demand above contract, at any hour. Railway traction may draw up to 140%. If the same consumer records 600 kVA, the bill rises to ₹13,45,250 because of a ₹25,000 penalty and a higher demand charge.
| Period | Hours | Effect on energy charge |
|---|---|---|
| Solar hours | 8 am to 4 pm | 10% discount |
| Normal hours | 4 pm to 6 pm and midnight to 8 am | Normal tariff |
| Peak hours | 6 pm to midnight | 10% surcharge (1.1 times) |
ToD applies from 1 July 2026 to consumers with a smart or AMR-compliant meter and contract demand above 10 kW. Irrigation, pumping and agriculture are exempt. The calculator applies the adjustment at your average energy rate for the units you enter.
| Item | Charge |
|---|---|
| Meter rent: single-phase static | ₹40 a month |
| Meter rent: single-phase smart | ₹60 a month |
| Meter rent: three-phase whole current | ₹150 a month |
| Meter rent: LT CT meter | ₹500 a month |
| Meter rent: HT 11 kV / 33 kV CT meter | ₹1,000 / ₹2,000 a month |
| Reconnection: LT single-phase domestic / other | ₹300 / ₹800 |
| Reconnection: LT three-phase | ₹1,200 |
| Reconnection: HT / EHT | ₹6,000 / ₹10,000 |
| Temporary connection | Energy charge 10% higher |
| Green energy premium | ₹0.20 per unit extra |
Late payment surcharge applies to larger categories at 1.25% a month, and at 1% a month for LT general purpose of 5 kW and above and HT bulk domestic. The calculator does not add late payment surcharge or arrears.
The order excludes duty and sets no figure. The calculator leaves it at 0 until you enter your percentage or per-unit amount from your bill.
The order lists bands without a worked example. The default is slab by slab, with a switch for whole consumption.
Where the order is brief, billing demand follows the higher of recorded and 80% of contract demand, with the overdrawl rules above.
The peak surcharge and solar discount are applied to the average energy rate of the bill.
The 4% digital and prepaid rebates are taken on the bill after the per-unit rebates, before duty.
Arrears, late payment surcharge, security deposit and any state subsidy outside the order are not part of the estimate.
Each band raises the rate. Small cuts near a band edge save the most.
Prompt payment earns ₹0.10 per unit and digital payment adds 4% on LT domestic bills.
It takes ₹10 off every bill.
The fixed charge follows each kW or part of a kW. A sanctioned load that is too high adds to every bill.
Above 10 kW with a smart meter, units from 8 am to 4 pm get 10% off while evenings cost 10% more.
Peak-hour demand above contract demand attracts a ₹250 per kVA penalty.
Odisha Electricity Regulatory Commission, Retail Supply Tariff Order for FY 2026–27 for TPCODL, TPNODL, TPWODL and TPSODL, with Annexure-B (Retail Supply Tariff effective from 1 April 2026), dated 24 March 2026.
An Odisha bill adds the energy charge for your units and a monthly fixed charge. LT homes and small shops pay a minimum fixed charge per kW (₹20 for domestic, ₹30 for general purpose). Larger users pay a demand charge per kVA and a customer service charge. Rebates are taken off, and Electricity Duty and other levies come on top.
For domestic homes it is ₹2.90 up to 50 units, ₹4.70 for 51–200, ₹5.70 for 201–400 and ₹6.10 above 400 units. General purpose LT is ₹5.90 up to 100 units, ₹7.00 for 101–300 and ₹7.60 above 300. Public lighting, small industry, institutions and water works pay ₹6.20 per unit. Irrigation is ₹1.50 per unit.
The order lists the domestic rate by consumption band: up to 50 units, 51–200, 201–400 and above 400. It gives no worked example, so utilities and bill calculators usually apply the bands slab by slab. Some pages apply the band rate to all units. This calculator uses slab by slab by default and has a switch for the whole-consumption method, so you can match your own bill. The difference grows with higher use. At 300 units for a 2 kW home it is ₹1,460 against ₹1,750.
₹20 for the first kW or part of a kW and ₹20 for each additional kW or part. A 1.2 kW load is charged as 2 kW, which is ₹40 a month. General purpose LT pays ₹30 per kW or part.
Kutir Jyoti is a single-part tariff for eligible low-income households using up to 30 units a month. They pay only a fixed ₹70 for the month. If consumption goes above 30 units, the regular domestic tariff applies.
Paying by the due date earns ₹0.10 per unit for domestic, general purpose below 110 kVA, irrigation, allied agriculture, LT small industry and water works consumers. Rural domestic consumers with a correct meter get another ₹0.10 per unit. A 4% rebate applies on the bill for LT domestic and single-phase general purpose consumers who pay digitally. Prepaid consumers get 4%, and choosing the e-bill gives ₹10 a month off.
For most HT and EHT categories the energy rate depends on load factor. At HT it is ₹5.85 per kVAh when load factor is 60% or less, and ₹4.75 above 60%, on all units. At EHT it is ₹5.80 and ₹4.70. Load factor is your units divided by contract demand times the hours in the billing period.
Consumers with contract demand of 110 kVA and above pay ₹250 per kVA (₹200 at LT, ₹150 for HT industrial (M)) on billing demand. Billing demand is the higher of the recorded maximum demand and 80% of contract demand. Bulk domestic HT pays ₹20, irrigation ₹30, allied agriculture ₹30 and agro-industry ₹50.
From 1 July 2026, consumers with a smart or AMR-compliant meter and contract demand above 10 kW (except irrigation and agriculture) get 10% off the energy charge from 8 am to 4 pm and pay 10% extra from 6 pm to midnight. Other hours are normal. Enter your solar-hour and peak-hour units and the calculator applies the adjustment.
Three-part consumers can draw up to 120% of contract demand in solar and normal hours without penalty, as long as peak-hour demand stays within contract demand. Demand above 120% in those hours, or any demand above contract in peak hours, attracts ₹250 per kVA on the excess. Railway traction is allowed up to 140%.
No. The tariff order states that duty and cess are extra, and it sets no single rate. Meter rent is also charged separately: ₹40 for a single-phase static meter, ₹60 for a single-phase smart meter, ₹150 for a three-phase whole-current meter, with higher amounts for CT meters. Enter duty from your bill in Advanced mode and pick your meter rent.
The OERC tariff applies across Odisha's four distribution companies: TPCODL (central), TPNODL (north), TPWODL (west and south-west) and TPSODL (south). The retail tariff is the same in all four areas.
Public EV charging stations fall under general purpose with a single-part tariff of ₹5.00 per unit. A group housing society charging unit on a separate connection is treated the same way.
It follows OERC Annexure-B and the tariff order line by line. Your actual bill can differ by a few rupees because of Electricity Duty, arrears, rounding, and billing details such as the domestic slab method. Use it as an estimate and compare with your bill.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.