Lakshadweep · JERC tariff 2026–27

Lakshadweep Electricity Bill Calculator

Choose your connection and enter your load and units. The calculator follows the JERC tariff for FY 2026–27, with telescopic domestic slabs, lifeline LTDS-I, kVAh categories, billing demand, ToD, power factor and temporary connections.

FY 2026–27 rates18 LT and HT categoriesLifeline, ToD and PF
Your electricity bill
From your bill. Billing demand is the higher of this and 85% of contract demand. Above contract demand the excess is charged at double the rate. Leave blank to use contract demand.
Lifeline LTDS-I needs a load up to 250 W. Above that, regular domestic rates apply.
For bi-monthly billing the fixed charge and the slab limits are doubled.
Temporary connections pay 150% of the tariff for the category.

Time-of-Day units (optional)

Only if your smart meter records ToD. Leave at 0 to bill all units at the normal rate.
Applies to LT non-domestic kWh categories. Below 0.85 adds a surcharge and above 0.90 gives a rebate.
The 33 kV rebate applies to HT consumers above 100 kVA.
Demand and fixed charges are reduced pro rata if average supply is below 23 hours a day. Leave blank for full charge.

Meter readings and budget

If you fill both, units are worked out from the difference.Leave blank to skip.

Items from your own bill

The tariff excludes these, so they default to zero. Enter them as shown on your bill.

Based on the JERC Tariff Order for Lakshadweep Electricity Department (19 September 2025), FY 2026–27 rates. Free, no sign-up. An estimate, not your official bill.

How to calculate your Lakshadweep electricity bill

Pick your connection category, then fill in the fields that appear. Each category shows only the inputs its tariff needs.

1

Choose the category

Pick LTDS-II for a regular home, LTDS-I for a lifeline BPL home and LTDS-III if part of the home is a shop, clinic or homestay.

2

Enter load and units

Type the connected load in kW and the units for the month. Demand categories take contract demand in kVA and kVAh units.

3

Switch to Advanced if needed

Add ToD units, power factor, temporary connection, bi-monthly billing, and the duty, FPPCAS or meter rent from your bill.

4

Read the breakdown

See every slab and line, then print, save as PDF or share the result.

What this calculator does

It applies the JERC tariff category by category and shows each step of the working.

All 18 LT and HT categories

Covers lifeline, regular and mixed domestic, non-domestic, agriculture, industry, public utility, EV charging and HT 11/33 kV.

Lifeline LTDS-I handled correctly

Charges ₹1.90 up to 100 units and moves the bill to regular domestic rates if the load or use is above the limit.

Telescopic slabs and part-kW rounding

Charges each 100-unit block at its own rate and rounds the fixed charge up to the next kW or kVA.

kVAh, billing demand and excess demand

Uses kVAh for demand categories, 85% of contract demand as the floor, and double rate for demand above contract.

ToD, power factor, temporary supply

Applies 90% and 115% ToD, the PF surcharge and rebate, and 150% for temporary connections.

Bi-monthly, late payment, budget

Doubles slabs and fixed charge for two months, adds the 1.5% delayed-payment surcharge and turns an amount into units.

How is a Lakshadweep electricity bill calculated?

The Department of Electricity of the Union Territory of Lakshadweep bills a fixed charge plus an energy charge. The fixed charge depends on your sanctioned load in kW, or contract demand in kVA for demand categories. The energy charge depends on your category and, for homes and some commercial categories, on telescopic slabs.

Bill = fixed or demand charge + energy charge by slab ± ToD, power-factor and voltage adjustments + duty, FPPCAS and other items from your bill

The tariff is set by the Joint Electricity Regulatory Commission (JERC) for the State of Goa and Union Territories. It is exclusive of electricity duty and taxes, which are levied extra.

Lakshadweep domestic electricity rates per unit, 2026–27

Monthly unitsLTDS-I lifelineLTDS-II regularLTDS-III mixed use
First 100₹1.90₹3.55₹3.60
101 to 200–₹5.30₹5.45
201 to 300–₹7.70₹7.85
301 to 400–₹10.05₹10.20
Above 400–₹13.05₹13.30
Fixed charge₹10 per connection₹25 per kW or part₹25 per kW or part

These slabs are telescopic. Each block of units pays only its own rate. LTDS-I applies to dwellings below the poverty line with a load up to 250 W and use up to 100 units a month.

Lakshadweep electricity tariff by category, FY 2026–27

Every category in the approved schedule that has a tariff is listed below. NDS, agriculture, industrial, public utility and EV categories are billed on kVAh where the unit column says so.

CodeCategoryFixed charge per monthEnergy rate, FY 2026–27
LTDS-ILifeline domestic, BPL (load up to 250 W, up to 100 units)₹10 per connection₹1.90 per kWh
LTDS-IIRegular domestic₹25 per kW or part₹3.55 up to 100; ₹5.30 101–200; ₹7.70 201–300; ₹10.05 301–400; ₹13.05 above 400 (per kWh)
LTDS-IIIMixed domestic and non-domestic use₹25 per kW or part₹3.60 up to 100; ₹5.45 101–200; ₹7.85 201–300; ₹10.20 301–400; ₹13.30 above 400 (per kWh)
NDS-INon-domestic: shops, offices, clinics, banks and similar₹35 per kVA or part₹11.85 up to 100; ₹13.60 101–200; ₹17.75 above 200 (per kVAh)
NDS-IINon-domestic: hotels, restaurants, guest houses and homestays₹35 per kVA or part₹11.85 up to 100; ₹13.60 101–200; ₹17.75 above 200 (per kVAh)
NDS-IIINon-domestic: hoardings, sign boards and advertising boards₹35 per kVA or part₹14.55 per kVAh
NDS-IVNon-domestic: government educational and health institutions₹35 per kVA or part₹17.85 per kVAh
NDS-VNon-domestic: places of worship₹35 per kW or part₹5.35 per kWh
LTAS-IAgriculture, connected load up to 10 kW₹10 per kW or part₹3.25 per kWh
LTAS-IIAgriculture, demand based, above 10 kW₹10 per kVA or part₹3.25 per kVAh
LTAS-IIIAllied agricultural services (poultry, fisheries, animal husbandry)₹10 per kVA or part₹3.25 per kVAh
LTIS-IIndustrial, demand based₹65 per kVA or part₹11.85 up to 500; ₹13.60 501–1000; ₹17.75 above 1000 (per kVAh)
LTPS-IPublic water works and sewerage₹90 per kVA or part₹17.85 per kVAh
LTPS-IIStreet lights and mast lights₹90 per kW or part₹12.80 per kWh
LTPS-IIIDefence establishments, railways and other public utility₹90 per kW or part₹17.85 per kWh
LTEV-IElectric vehicle charging stations (public and captive)₹25 per kVA or part₹9.25 per kVAh
HTS-IHT domestic, 11/33 kV₹200 per kVA or part₹15.55 per kVAh
HTS-IIHT non-domestic, 11/33 kV₹200 per kVA or part₹15.55 per kVAh

HTS-III to HTS-VI and the EHT categories appear in the order but have no tariff fixed yet, so they are not in the calculator.

Domestic bill at different units

Bills for a 2 kW load, without duty, FPPCAS or meter rent.

UnitsLTDS-IILTDS-IIILTDS-II average per unit
50₹227.50₹230.00₹4.55
100₹405.00₹410.00₹4.05
150₹670.00₹682.50₹4.47
200₹935.00₹955.00₹4.67
250₹1,320.00₹1,347.50₹5.28
300₹1,705.00₹1,740.00₹5.68
400₹2,710.00₹2,760.00₹6.78
500₹4,015.00₹4,090.00₹8.03
750₹7,277.50₹7,415.00₹9.70
1000₹10,540.00₹10,740.00₹10.54

Worked example: LTDS-II, 2 kW, 250 units

SlabUnitsRate (₹)Amount
First 100 units1003.55₹355.00
101 to 200 units1005.30₹530.00
201 to 300 units507.70₹385.00
LineAmount
Energy charge (250 kWh)₹1,270.00
Fixed charge (₹25 × 2 kW)₹50.00
Total payable₹1,320.00

Worked example: LTDS-II, 3 kW, 500 units

SlabUnitsRate (₹)Amount
First 100 units1003.55₹355.00
101 to 200 units1005.30₹530.00
201 to 300 units1007.70₹770.00
301 to 400 units10010.05₹1,005.00
Above 400 units10013.05₹1,305.00
LineAmount
Energy charge (500 kWh)₹3,965.00
Fixed charge (₹25 × 3 kW)₹75.00
Total payable₹4,040.00

Worked example: lifeline LTDS-I, 80 units

LineAmount
Energy charge (80 kWh)₹152.00
Fixed charge (₹10 per connection)₹10.00
Total payable₹162.00

Worked example: NDS-I shop, 5 kVA, 150 kVAh

SlabUnitsRate (₹)Amount
First 100 units10011.85₹1,185.00
101 to 200 units5013.60₹680.00
LineAmount
Energy charge (150 kVAh)₹1,865.00
Demand charge (₹35 × 5 kVA billing demand)₹175.00
Total payable₹2,040.00

Worked example: the same shop on a temporary connection

LineAmount
Energy charge (150 kVAh, temporary connection at 150%)₹2,797.50
Demand charge (₹35 × 5 kVA billing demand × 150%)₹262.50
Total payable₹3,060.00

Worked example: NDS-V place of worship, 3 kW, 200 units, power factor 0.80

LineAmount
Energy charge (200 kWh)₹1,070.00
Fixed charge (₹35 × 3 kW)₹105.00
Power-factor surcharge 10% (PF 0.8)₹117.50
Total payable₹1,292.50

Worked example: HTS-I, 200 kVA at 33 kV, 30,000 kVAh

LineAmount
Energy charge (30,000 kVAh)₹4,66,500.00
Demand charge (₹200 × 200 kVA billing demand)₹40,000.00
Voltage rebate at 33 kV (3% of energy charges)−₹13,995.00
Total payable₹4,92,505.00

Tariff for the next years, FY 2025–26 to FY 2029–30

The Commission approved the tariff for the whole control period. The public notice says energy charges rise by 10%, 7.5%, 7%, 6.5% and 6% over the existing rates in the five years. The tariff came into force from 1 October 2025.

Domestic

Category and slabFY 2025–26FY 2026–27FY 2027–28FY 2028–29FY 2029–30
LTDS-I lifeline, up to 100₹1.75₹1.90₹2.05₹2.20₹2.35
LTDS-II, first 100₹3.30₹3.55₹3.80₹4.05₹4.30
LTDS-II, 101 to 200₹4.95₹5.30₹5.65₹6.00₹6.35
LTDS-II, 201 to 300₹7.15₹7.70₹8.25₹8.80₹9.35
LTDS-II, 301 to 400₹9.35₹10.05₹10.75₹11.45₹12.15
LTDS-II, above 400₹12.15₹13.05₹13.95₹14.85₹15.75
LTDS-III, first 100₹3.35₹3.60₹3.85₹4.10₹4.35
LTDS-III, 101 to 200₹5.05₹5.45₹5.85₹6.25₹6.65
LTDS-III, 201 to 300₹7.30₹7.85₹8.40₹8.95₹9.50
LTDS-III, 301 to 400₹9.50₹10.20₹10.90₹11.60₹12.30
LTDS-III, above 400₹12.35₹13.30₹14.25₹15.15₹16.05

Other categories

Category and slabFY 2025–26FY 2026–27FY 2027–28FY 2028–29FY 2029–30
NDS-I and NDS-II, first 100 kVAh₹11.00₹11.85₹12.65₹13.50₹14.30
NDS-I and NDS-II, 101 to 200₹12.65₹13.60₹14.55₹15.50₹16.45
NDS-I and NDS-II, above 200₹16.50₹17.75₹19.00₹20.25₹21.45
NDS-III advertising boards₹13.55₹14.55₹15.55₹16.55₹17.55
NDS-IV government institutions₹16.60₹17.85₹19.10₹20.35₹21.55
NDS-V places of worship (kWh)₹5.00₹5.35₹5.75₹6.10₹6.45
LTAS-I, II and III agriculture₹3.00₹3.25₹3.45₹3.70₹3.90
LTIS-I, first 500 kVAh₹11.00₹11.85₹12.65₹13.50₹14.30
LTIS-I, 501 to 1000₹12.65₹13.60₹14.55₹15.50₹16.45
LTIS-I, above 1000₹16.50₹17.75₹19.00₹20.25₹21.45
LTPS-I water works₹16.60₹17.85₹19.10₹20.35₹21.55
LTPS-II street lights (kWh)₹11.90₹12.80₹13.70₹14.60₹15.50
LTPS-III defence and railways (kWh)₹16.60₹17.85₹19.10₹20.35₹21.55
LTEV-I EV charging₹8.60₹9.25₹9.90₹10.55₹11.20
HTS-I and HTS-II₹14.45₹15.55₹16.65₹17.75₹18.80

The Commission also approved the Aggregate Revenue Requirement. For FY 2026–27 it is ₹269.58 crore against revenue of ₹57.75 crore from retail sales at the approved tariff, with the gap to be met through budgetary support. The average cost of supply is ₹40.42 per unit, while the approved average billing rate is ₹8.66 per unit.

How fixed charge and billing demand work

  • Fixed charges are per kW or kVA "or part thereof", so 2.3 kW is charged as 3 kW.
  • LTDS-I pays ₹10 per connection per month. The Commission approved it per connection because the load is limited to 250 W.
  • For demand categories, billing demand is the higher of recorded maximum demand and 85% of contract demand.
  • If recorded demand is above contract demand, the excess demand is billed at double the normal rate, and energy corresponding to the excess demand is also billed at double.
  • Fixed or demand charges are recovered in full only if average supply is at least 23 hours a day. Below that they are reduced pro rata.
  • For bi-monthly billing, fixed charges and the energy slabs are doubled.

Time-of-Day tariff

Time slotNameEnergy chargeDemand charge
9 am to 5 pmSolar hours90% of normalNormal
5 pm to 6 pm and midnight to 9 amNormal hours100% of normalNormal
6 pm to midnightPeak hours115% of normalNormal

For LT consumers other than agriculture, ToD billing is mandatory from the date a smart meter is installed. For HT and EHT consumers, ToD is mandatory except for agriculture and those with captive plants or wheeling. The calculator applies the multipliers to the average energy rate you pay.

Power factor surcharge and rebate

This applies to LT consumers other than domestic who are billed on kW and kWh. In the calculator it covers NDS-V, LTAS-I, LTPS-II and LTPS-III.

Monthly average power factorAdjustment on demand and energy charges
0.85 down to 0.80Surcharge 2% for each 0.01 fall
Below 0.80 down to 0.75Surcharge 2.5% for each 0.01 fall
Below 0.75Surcharge 3% for each 0.01 fall
Below 0.70Installation liable to disconnection after notice
Above 0.90 up to 0.95Rebate 0.5% for each 0.01 rise
Above 0.95Rebate 1% for each 0.01 rise

Temporary connections, voltage rebate and other rules

  • Temporary connections pay 150% of the fixed and energy charges of the respective category.
  • HT consumers above 100 kVA taking supply at 33 kV get a 3% rebate on energy charges.
  • Fuel and Power Purchase Cost Adjustment Surcharge (FPPCAS) is charged extra if applicable.
  • Delayed payment surcharge is 1.5% per month on the outstanding principal amount.
  • Advance payments earn interest of 1% per month on the balance, adjusted in later bills.
  • Conversion factors: for LT, 1 kW is 1.176 kVA and 1 kVA is 0.85 kW. For HT, 1 kW is 1.11 kVA and 1 kVA is 0.90 kW.

What the tariff does not include

The tariff is exclusive of electricity duty, taxes and other charges, and the order does not fix a duty rate, a meter rent or an FPPCAS amount. Some third-party calculators apply a flat ₹25 fixed charge to every home. The order charges ₹25 per kW or part thereof. If your printed bill is higher than this estimate, the difference is usually duty, FPPCAS, meter rent, arrears or a delayed-payment surcharge. Enter them in Advanced mode to compare line by line.

Ways to lower a Lakshadweep electricity bill

Stay inside each 100-unit block

The rate steps up at 100, 200, 300 and 400 units. Going from 400 to 401 units moves the rate from ₹10.05 to ₹13.05 for regular domestic homes.

Use solar hours if you have a ToD meter

Units between 9 am and 5 pm cost 90% of the normal rate. Peak units between 6 pm and midnight cost 115%.

Do not over-declare load

Domestic fixed charge is ₹25 per kW or part thereof, so a load larger than you need adds to every bill.

Keep the power factor above 0.90

Non-domestic kWh consumers get a rebate above 0.90 and pay a surcharge below 0.85. A capacitor can help.

Pay by the due date

The delayed payment surcharge is 1.5% per month on the outstanding amount.

Switch to LED and efficient cooling

Fans, air conditioners and lighting make up most home use in the islands. Efficient appliances move you down a slab.

Official tariff source

Joint Electricity Regulatory Commission, Tariff Order for Lakshadweep Electricity Department, Petition No. 143/2025, dated 19 September 2025 (Annual Performance Review for FY 2024–25, ARR and tariff for FY 2025–26 to FY 2029–30). The Department of Electricity public notice F.No. 67/2/2/2024-Ele dated 23 October 2025 publishes the approved tariff in Annexure-A. See the JERC order (PDF) and the Lakshadweep Electricity Department tariff page. Kalikolom Tools is not affiliated with the Lakshadweep Administration.

Frequently asked questions

How is a Lakshadweep electricity bill calculated?

A Lakshadweep bill is a fixed charge plus an energy charge. Domestic LTDS-II and LTDS-III use telescopic slabs, so each block of 100 units is charged at its own rate. The fixed charge is ₹25 per kW or part thereof. Non-domestic and some other categories are billed in kVAh with a demand charge per kVA. Electricity duty, FPPCAS and other levies are charged extra and are not part of the tariff.

What is the electricity rate per unit in Lakshadweep in 2026–27?

For regular domestic LTDS-II the rate is ₹3.55 for the first 100 units, ₹5.30 for 101 to 200, ₹7.70 for 201 to 300, ₹10.05 for 301 to 400 and ₹13.05 above 400 units. Lifeline LTDS-I pays ₹1.90 per unit up to 100 units. LTDS-III (mixed use) pays ₹3.60, ₹5.45, ₹7.85, ₹10.20 and ₹13.30 for the same slabs.

What is the fixed charge for a home in Lakshadweep?

Regular domestic LTDS-II and mixed LTDS-III pay ₹25 per kW or part thereof per month, so a 2.3 kW load is charged as 3 kW (₹75). Lifeline LTDS-I pays ₹10 per connection per month. The fixed charge is not a flat ₹25 for every home.

Who can get the lifeline LTDS-I tariff?

Dwelling houses below the poverty line with a total connected load up to 250 watts and use up to 100 units a month. If the load or the use is above these limits, the demand charge and the units for that bill are charged at regular domestic rates. The calculator does this automatically.

What is the difference between LTDS-II and LTDS-III?

LTDS-II is for domestic premises, government residential quarters and common facilities in residential apartment buildings. LTDS-III is for a home where part of the premises is used for small shops, clinics, offices or homestays. LTDS-III slabs are slightly higher, for example ₹3.60 against ₹3.55 for the first 100 units.

Are Lakshadweep domestic slabs telescopic?

Yes. Each block of units is charged at its own rate. For 250 units on LTDS-II you pay 100 units at ₹3.55, 100 at ₹5.30 and 50 at ₹7.70. The whole consumption is not billed at the top rate.

Why do some categories use kVAh instead of kWh?

Non-domestic NDS-I to NDS-IV, LTAS-II and III, LTIS-I, LTPS-I, LTEV-I and HT consumers are billed on kVAh, which includes the effect of power factor. Use the kVAh reading from your bill. kVAh is roughly kWh divided by the power factor.

When did the new Lakshadweep tariff start and when does the FY 2026–27 rate apply?

The Joint Electricity Regulatory Commission (JERC) approved the tariff for FY 2025–26 to FY 2029–30 in its order dated 19 September 2025, and the approved tariff came into force from 1 October 2025. The FY 2026–27 column of the schedule applies for that financial year.

How much will the tariff rise in later years?

The public notice says the Commission approved increases of 10%, 7.5%, 7%, 6.5% and 6% in energy charges over FY 2025–26 to FY 2029–30. For LTDS-II the first 100 units rise from ₹3.30 in FY 2025–26 to ₹3.55 in FY 2026–27, ₹3.80 in FY 2027–28, ₹4.05 in FY 2028–29 and ₹4.30 in FY 2029–30.

Is there a Time-of-Day tariff in Lakshadweep?

Yes. The order sets solar hours (9 am to 5 pm) at 90% of the normal energy charge, normal hours (5 pm to 6 pm and midnight to 9 am) at 100%, and peak hours (6 pm to midnight) at 115%. It is mandatory for LT consumers other than agriculture from the date a smart meter is installed, and for HT consumers other than agriculture. The calculator takes your ToD units as an optional input.

How are temporary connections billed?

Temporary connections are billed at 150% of the fixed charge and the energy charge of the respective tariff category. Switch on the temporary connection option in Advanced mode.

What are the power factor surcharge and rebate?

LT consumers other than domestic who are billed on kW and kWh pay a surcharge if the monthly average power factor falls below 0.85 and get a rebate above 0.90. The surcharge is 2% per 0.01 fall down to 0.80, 2.5% per 0.01 from 0.80 to 0.75 and 3% per 0.01 below 0.75. The rebate is 0.5% per 0.01 from 0.90 to 0.95 and 1% per 0.01 above 0.95.

Does the calculator include electricity duty, FPPCAS and meter rent?

No, because the tariff is exclusive of electricity duty, taxes and other charges, and the order does not fix them. In Advanced mode you can enter the duty percentage, FPPCAS per unit, meter rent, other items and the number of days a payment is overdue, exactly as they appear on your bill.

What is the delayed payment surcharge?

If a bill is not paid in full by the due date, the order allows a delayed payment surcharge of 1.5% per month on the outstanding principal amount, charged on a proportionate basis for part of a month. Enter the overdue days in Advanced mode to see it.

Which official documents does this calculator follow?

JERC Tariff Order for Lakshadweep Electricity Department, Petition No. 143/2025, dated 19 September 2025, and the Department of Electricity public notice F.No. 67/2/2/2024-Ele dated 23 October 2025 with its Annexure-A. This tool is not an official service of the Lakshadweep Administration.

Explore Electricity Bill Calculators by State & Union Territory

Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.

Electricity Board Wise Calculators