Based on the KERC Tariff Order dated 27 March 2025 (BESCOM Electricity Tariff 2026 to 2028). Free, no sign-up. An estimate, not your official bill.
Estimate your BESCOM bill for a home, shop, workshop or pump set. Includes the 9% electricity tax, quarter-kW load rounding, rebates and Gruha Jyothi free units.
Based on the KERC Tariff Order dated 27 March 2025 (BESCOM Electricity Tariff 2026 to 2028). Free, no sign-up. An estimate, not your official bill.
Karnataka charges one flat rate for every unit. Three inputs are enough for most homes and shops.
Homes are LT-1. Shops, offices, clinics and hotels are LT-3(a). Workshops are LT-5, and irrigation pumps are LT-4. Sanctioned load is on your bill.
Use the sanctioned load and the units for the month. Pump sets and LT-5 are billed per HP, everything else per kW.
Add Gruha Jyothi free units, solar, rebates, FPPCA or power factor to match your real bill.
Energy is one rate for all units. Fixed charge is per kW or HP of sanctioned load per month. The last column is the PDF page in the tariff booklet.
| Category | Fixed charge FY 2026–27 | Energy FY 2025–26 | Energy FY 2026–27 | Energy FY 2027–28 | Page |
|---|---|---|---|---|---|
| LT-1 Residential / domestic | ₹150 / kW | ₹5.80 | ₹5.80 | ₹5.75 | 16 |
| LT-2 Private professional / educational institutions, nursing homes | ₹195 / kW | ₹6.75 | ₹6.55 | ₹6.25 | 17 |
| LT-3(a) Commercial (shops, offices, hotels, clinics, banks) | ₹215 / kW | ₹7.00 | ₹6.80 | ₹6.60 | 18 |
| LT-3(a) Commercial, demand based (above 5 kW, below 150 kW) | ₹235 / kW | ₹7.00 | ₹6.80 | ₹6.60 | 18 |
| LT-3(b) Hoardings and advertisement boards | ₹200 / kW | ₹9.50 | ₹9.50 | ₹9.50 | 19 |
| LT-5 Industrial (MSME, workshops, poultry), per HP | ₹150 / HP | ₹4.50 | ₹4.40 | ₹4.30 | 22 |
| LT-5 Industrial, demand based (above 5 kW, below 150 kW) | ₹200 / kW | ₹4.50 | ₹4.40 | ₹4.30 | 23 |
| LT-4(b) Irrigation pump sets above 10 HP | ₹145 / HP | ₹4.10 | ₹4.00 | ₹4.00 | 20 |
| LT-4(c) Horticulture nurseries, coffee, tea, rubber | ₹145 / HP | ₹3.65 | ₹3.45 | ₹3.25 | 21 |
| LT-6(a) Water supply and sewerage pumping | ₹180 / HP | ₹5.50 | ₹5.50 | ₹5.50 | 25 |
| LT-6(c) EV charging / battery swapping (LT) | ₹70 / kW | ₹4.50 | ₹4.50 | ₹4.50 | 25 |
| LT-7 Temporary supply | ₹200 / kW | ₹10.50 | ₹10.50 | ₹10.50 | 26 |
These examples use the FY 2026–27 tariff, including 9% electricity tax, before FPPCA and any rebate.
| Units | Energy | Fixed | Tax (9%) | Bill |
|---|---|---|---|---|
| 50 | ₹290.00 | ₹450.00 | ₹66.60 | ₹807 |
| 100 | ₹580.00 | ₹450.00 | ₹92.70 | ₹1,123 |
| 150 | ₹870.00 | ₹450.00 | ₹118.80 | ₹1,439 |
| 200 | ₹1,160.00 | ₹450.00 | ₹144.90 | ₹1,755 |
| 300 | ₹1,740.00 | ₹450.00 | ₹197.10 | ₹2,387 |
| 400 | ₹2,320.00 | ₹450.00 | ₹249.30 | ₹3,019 |
| 500 | ₹2,900.00 | ₹450.00 | ₹301.50 | ₹3,652 |
| 750 | ₹4,350.00 | ₹450.00 | ₹432.00 | ₹5,232 |
| 1000 | ₹5,800.00 | ₹450.00 | ₹562.50 | ₹6,813 |
| Units | Energy | Fixed | Tax (9%) | Bill |
|---|---|---|---|---|
| 50 | ₹340.00 | ₹1,075.00 | ₹127.35 | ₹1,542 |
| 100 | ₹680.00 | ₹1,075.00 | ₹157.95 | ₹1,913 |
| 150 | ₹1,020.00 | ₹1,075.00 | ₹188.55 | ₹2,284 |
| 200 | ₹1,360.00 | ₹1,075.00 | ₹219.15 | ₹2,654 |
| 300 | ₹2,040.00 | ₹1,075.00 | ₹280.35 | ₹3,395 |
| 400 | ₹2,720.00 | ₹1,075.00 | ₹341.55 | ₹4,137 |
| 500 | ₹3,400.00 | ₹1,075.00 | ₹402.75 | ₹4,878 |
| 750 | ₹5,100.00 | ₹1,075.00 | ₹555.75 | ₹6,731 |
| 1000 | ₹6,800.00 | ₹1,075.00 | ₹708.75 | ₹8,584 |
Gruha Jyothi is a state scheme, not part of the KERC tariff booklet. Reports describe free units up to 200 a month, with the entitlement tied to past average use, and the rules have been revised since launch. The calculator therefore asks for the free-unit limit printed on your bill: units inside it are free, units above it up to 200 pay energy charges only, and above 200 the full bill applies.
HT supply (150 kW and above), LT-4(a) subsidised pump sets, LT-6(b) street lights (the energy rate is unclear in the booklet), discounted energy schemes, interest on late payment, and arrears are not calculated. Time-of-day billing is optional for LT-5 only and is not modelled.
Source: Karnataka Electricity Regulatory Commission (KERC) Tariff Order dated 27 March 2025, as published in BESCOM's Electricity Tariff 2026 to 2028 booklet. Electricity tax: Government of Karnataka notification of 19 July 2018.
For domestic LT-1 the KERC tariff for FY 2026–27 is a flat ₹5.80 per unit with a fixed charge of ₹150 per kW per month. For commercial LT-3(a) it is ₹6.80 per unit and ₹215 per kW per month. Electricity tax of 9% is added on top.
Bill = (units × energy rate + fixed charge per kW × sanctioned load, after any rebate and FPPCA) plus 9% electricity tax, rounded to the nearest rupee. The calculator shows each line.
No. For LT consumers KERC uses a single energy rate for all units, so 50 units and 500 units cost the same per unit. Only the fixed charge and tax change the effective rate.
A fraction of a kW or HP is rounded to the nearest quarter, with a minimum billing of 1 kW or 1 HP (tariff booklet, LT condition 22). A sanctioned load of 2.1 kW is billed as 2 kW, and 0.5 kW is billed as 1 kW.
Eligible households get a monthly free-unit limit shown on their bill. Units within the limit cost ₹0. If you go over the limit but stay within 200 units, you pay energy charges only for the extra units. Above 200 units the full bill is payable. These rules come from government announcements, not the KERC tariff, and they have been revised, so enter the limit from your own bill.
Yes. Karnataka levies electricity tax of 9% on the charges payable, excluding arrears. Irrigation pump sets up to 10 HP and Bhagya Jyothi / Kutir Jyothi connections are exempt. Choose "Exempt" in Advanced if that applies.
Common reasons are the monthly FPPCA, interest of 1% a month on late payment, arrears, a rated load higher than the sanctioned load, a recorded maximum demand, or a power factor below 0.85.
The booklet lists three years. For LT-1 the energy rate stays at 580 paise in FY 2025–26 and FY 2026–27, and the fixed charge rises from ₹145 to ₹150 per kW. In FY 2027–28 the energy rate falls to 575 paise and the fixed charge rises to ₹160.
The rates come from the BESCOM tariff booklet, which reproduces the KERC order dated 27 March 2025. We checked them against that document only. Confirm with your own ESCOM bill if you are outside Bengaluru.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.