Based on JERC Tariff Order No. 05 of 2026 (18 August 2026) for the Ladakh Power Development Department, effective 1 September 2026. Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your load and units. The calculator applies the JERC FY 2026–27 order for the Ladakh Power Development Department from 1 September 2026, with subsidised or full-cost rates, BPL and unmetered homes, hotels, ToD and rebates.
Based on JERC Tariff Order No. 05 of 2026 (18 August 2026) for the Ladakh Power Development Department, effective 1 September 2026. Free, no sign-up. An estimate, not your official bill.
Pick your connection, then fill in the fields that appear. Each category shows only the inputs its tariff needs.
Homes with a meter use Domestic – metered, BPL families use the BPL option and homes without a meter use the unmetered flat rate. Shops use Commercial, registered hotels and homestays have their own entry, and farm, street light, water works, industry, bulk and EV supply are listed too.
Keep the subsidised tariff, which is what LPDD bills from 1 September 2026. Enter your sanctioned load and the units for the month. Demand-based categories take contract demand in kVA.
Enter peak and solar-hour units if your smart meter records them and your load is above 10 kW. Choose prepaid, solar water heater, green tariff or temporary supply if they apply.
See energy charge, fixed charge and each adjustment separately, with the exact total. Enter your duty and FPPCA in Advanced mode to match your bill.
It applies the JERC order category by category and shows each step of the working.
LPDD bills on the subsidised tariff. You can switch to the full-cost tariff to see what the same bill would be without the UT Government's grant-in-aid.
Handles the 30-unit BPL rate, telescopic metered slabs and the flat quarter-kW charges for unmetered connections.
Scales slabs by the number of houses and rounds load up to the next half kW, as the order says.
Includes the new registered-tourism tariff effective 1 September 2026, next to ordinary commercial rates.
Applies peak and solar-hour ToD, the 2% prepaid rebate, the 5% HT and LT metering adjustments, voltage rebates and the ₹150 solar water heater rebate.
Uses billing demand at 75% of contract demand, doubles excess demand, and applies the 1.5 and 2 times rules for temporary connections.
The bill has a few parts. The energy charge is your units billed in telescopic slabs or at a flat rate per kWh or kVAh. The fixed or demand charge depends on your sanctioned load or billing demand. Time-of-Day, prepaid, voltage and temporary-supply rules then change those charges. Electricity Duty, FPPCA and any other levy are added on top.
Bill = energy charge ± ToD and rebates + fixed or demand charge ± temporary supply + Electricity Duty + FPPCA
The Joint Electricity Regulatory Commission (JERC) approved two tariffs for the Ladakh Power Development Department (LPDD). The full-cost tariff shows what supply really costs. The subsidised tariff is lower, because the UT Government of Ladakh gives a grant-in-aid, and LPDD is directed to bill consumers on it from 1 September 2026. Many pages mix the two. This calculator uses the subsidised tariff unless you switch.
| Domestic metered | Subsidised (you pay) | Full cost |
|---|---|---|
| Up to 200 units | ₹2.35 | ₹4.10 |
| 201 – 400 units | ₹4.10 | ₹6.10 |
| Above 400 units | ₹4.50 | ₹7.60 |
| Fixed charge per kW | ₹13 | ₹13 |
For a 3 kW home using 600 units, the subsidised bill before duty is ₹2,229.00 and the full-cost figure is ₹3,599.00.
The table lists every category in the order, on the subsidised tariff effective from 1 September 2026.
| Category | Group | Rates and rules |
|---|---|---|
| Domestic – BPL (up to 30 units a month) | Domestic | BPL certificate holders pay ₹1.50 per unit for the first 30 units and ₹5 per kW fixed charge. Units above 30 are billed at the metered domestic slab rates (₹2.35 up to 200 units, ₹4.10 for 201–400, ₹4.50 above 400). |
| Domestic – metered (including group housing societies) | Domestic | Telescopic slabs: ₹2.35 for the first 200 units, ₹4.10 for 201–400 and ₹4.50 above 400. Fixed charge ₹13 per kW, with load rounded up to the next ½ kW. Group housing slabs are multiplied by the number of houses. |
| Domestic – unmetered (flat rate) | Domestic | Flat monthly charge of ₹377 for every ¼ kW up to 2 kW. Above 2 kW it is ₹3,016 plus ₹863 for every additional ¼ kW or part of it. |
| Commercial – single phase metered (up to 5 kW) | Commercial (non-domestic) | Slabs: ₹3.75 up to 200 units, ₹5.60 for 201–500 and ₹6.10 above 500. Fixed charge ₹66 per kW, with load rounded up to the next ½ kW. |
| Commercial – three phase metered (above 5 kW up to 100 kW) | Commercial (non-domestic) | ₹6.10 per kVAh on all units. Demand charge ₹159 per kVA of billing demand. Billing demand is the higher of recorded demand and 75% of contract demand. |
| Commercial – unmetered (flat rate) | Commercial (non-domestic) | ₹1,079 for every ¼ kW up to 1 kW. Above 1 kW it is ₹4,313 plus ₹863 for every additional ¼ kW or part of it. |
| Hotel / guest house / resort – single phase (up to 5 kW) | Hotels, guest houses, homestays | Registered hotels, guest houses, resorts and homestays pay ₹4.30 per kWh on all units. Fixed charge ₹66 per kW, with load rounded up to the next ½ kW. |
| Hotel / guest house / resort – three phase (above 5 kW up to 100 kW) | Hotels, guest houses, homestays | ₹4.50 per kVAh on all units. Demand charge ₹159 per kVA of billing demand. Needs registration with the Ladakh Tourism Department. |
| State / Central Government – LT supply | Government departments | ₹8.95 per kVAh. Demand charge ₹58 per kVA of billing demand. |
| State / Central Government – 11 kV supply | Government departments | ₹8.85 per kVAh. Demand charge ₹58 per kVA of billing demand. |
| State / Central Government – 33 kV and above | Government departments | ₹8.75 per kVAh. Demand charge ₹58 per kVA of billing demand. |
| Agriculture – metered | Agriculture | Energy ₹1.00 per kWh for 0–10 HP, ₹1.50 for 11–20 HP and ₹5.50 above 20 HP. Fixed charge ₹40 per HP, with load rounded up to the next ½ HP. Rebate of 10 paise per unit at 11 kV and 20 paise at 33 kV and above. |
| Agriculture – unmetered (flat rate) | Agriculture | ₹375 per HP per month for 0–10 HP, ₹413 for 11–20 HP and ₹2,250 above 20 HP, with load rounded up to the next ½ HP. |
| Public street lighting – metered | Public services | ₹8.95 per kWh. Fixed charge ₹84 per kW, with load rounded up to the next whole kW. |
| Public street lighting – unmetered | Public services | ₹5,250 per kW per month or part of a kW. |
| Public water works – LT | Public services | ₹9.15 per kWh on all units. Fixed charge ₹84 per kW, with load rounded up to the next whole kW. |
| Public water works – 11 kV | Public services | ₹9.05 per kVAh. Demand charge ₹310 per kVA of billing demand. |
| Public water works – 33 kV and above | Public services | ₹8.95 per kVAh. Demand charge ₹310 per kVA of billing demand. |
| LT industry (LTIS-I, up to 100 kW) | Industry | ₹4.30 per kVAh. Demand charge ₹71 per kVA of billing demand. Covers registered units, atta chakkis, rice hullers, oil expellers and cotton ginning. |
| HT industry I – 11 kV | Industry | ₹4.25 per kVAh. Demand charge ₹215 per kVA of billing demand. |
| HT industry I – 33 kV | Industry | ₹4.20 per kVAh. Demand charge ₹215 per kVA of billing demand. |
| HT industry I – 66 kV | Industry | ₹4.10 per kVAh (10 paise below the 33 kV rate). Demand charge ₹215 per kVA of billing demand. |
| HT industry II (power intensive) – 11 kV | Industry | ₹4.90 per kVAh. Demand charge ₹268 per kVA of billing demand. For ferro alloys, calcium carbide, caustic soda, induction or arc furnaces and similar units. |
| HT industry II (power intensive) – 33 kV | Industry | ₹4.80 per kVAh. Demand charge ₹268 per kVA of billing demand. |
| HT industry II (power intensive) – 66 kV | Industry | ₹4.70 per kVAh (10 paise below the 33 kV rate). Demand charge ₹268 per kVA of billing demand. |
| General purpose bulk supply – 11 kV | Bulk supply | ₹5.60 per kVAh. Demand charge ₹252 per kVA of billing demand. For mixed loads above 100 kW such as colonies, institutions and offices. |
| General purpose bulk supply – 33 kV | Bulk supply | ₹5.50 per kVAh. Demand charge ₹252 per kVA of billing demand. |
| General purpose bulk supply – 66 kV | Bulk supply | ₹5.40 per kVAh (10 paise below the 33 kV rate). Demand charge ₹252 per kVA of billing demand. |
| EV charging station – LT | EV charging | ₹7.50 per kVAh. No demand charge. |
| EV charging station – 11 kV | EV charging | ₹7.40 per kVAh. No demand charge. |
| EV charging station – 33 kV and above | EV charging | ₹7.30 per kVAh. No demand charge. |
| Units in the month | Rate per unit | Energy charge at the top of the slab |
|---|---|---|
| 0 – 200 | ₹2.35 | ₹470.00 |
| 201 – 400 | ₹4.10 | ₹1,290.00 |
| 401 and above | ₹4.50 | ₹1,290 + ₹4.50 per extra unit |
The slabs are telescopic: each rate applies only to the units inside that slab. A month of 250 units pays 200 units at ₹2.35 and the remaining 50 at ₹4.10.
| Sanctioned load | Load charged | Fixed charge at ₹13 per kW |
|---|---|---|
| 0.25 kW | 0.5 kW | ₹6.50 |
| 1 kW | 1 kW | ₹13.00 |
| 1.2 kW | 1.5 kW | ₹19.50 |
| 3 kW | 3 kW | ₹39.00 |
| 5 kW | 5 kW | ₹65.00 |
The fixed charge applies to all units, even a month with very little use. Load is rounded up to the next ½ kW first. For domestic users with both cooling and heating loads, only the higher of the two counts towards the load, and cooking equipment is left out.
| Item | Rate |
|---|---|
| First 30 units a month | ₹1.50 per unit |
| Units above 30 | Metered domestic slab rates (₹2.35 up to 200 units, then ₹4.10 and ₹4.50) |
| Fixed charge | ₹5 per kW per month |
The BPL category needs a certificate from the competent authority of the State Government. Example: a BPL home with 1 kW using 100 units pays 30 × ₹1.50 + 70 × ₹2.35 = ₹209.50, plus ₹5 fixed, for ₹214.50.
| Connected load | Monthly flat charge |
|---|---|
| Up to 0.25 kW | ₹377 |
| Above 0.25 and up to 0.5 kW | ₹754 |
| Above 0.5 and up to 0.75 kW | ₹1,131 |
| Above 0.75 and up to 1 kW | ₹1,508 |
| Above 1 kW and up to 2 kW | ₹377 for every ¼ kW or part |
| Above 2 kW | ₹3,016 + ₹863 for every additional ¼ kW or part above 2 kW |
Example: a 3 kW unmetered home pays ₹3,016 + ₹863 × 4 = ₹6,468 a month, which is the order’s own illustration. Because the charge is flat, a meter is almost always cheaper for a home that uses a normal amount of power.
The table shows the subsidised bill for a 1 kW, 3 kW and 5 kW home with a postpaid meter, before Electricity Duty, FPPCA and arrears.
| Units | 1 kW home | 3 kW home | 5 kW home |
|---|---|---|---|
| 50 | ₹131 | ₹157 | ₹183 |
| 100 | ₹248 | ₹274 | ₹300 |
| 150 | ₹366 | ₹392 | ₹418 |
| 200 | ₹483 | ₹509 | ₹535 |
| 250 | ₹688 | ₹714 | ₹740 |
| 300 | ₹893 | ₹919 | ₹945 |
| 400 | ₹1,303 | ₹1,329 | ₹1,355 |
| 500 | ₹1,753 | ₹1,779 | ₹1,805 |
| 600 | ₹2,203 | ₹2,229 | ₹2,255 |
| 800 | ₹3,103 | ₹3,129 | ₹3,155 |
| 1000 | ₹4,003 | ₹4,029 | ₹4,055 |
| Line | Working | Amount |
|---|---|---|
| Energy, first 200 units | 200 × ₹2.35 | ₹470.00 |
| Energy, 201–400 units | 200 × ₹4.10 | ₹820.00 |
| Energy, above 400 units | 200 × ₹4.50 | ₹900.00 |
| Fixed charge | 3 kW × ₹13 | ₹39.00 |
| Total | Before duty and other levies | ₹2,229.00 |
The order itself shows ₹2,190 for energy and ₹39 for fixed charges, which makes ₹2,229, and says this excludes electricity duty and any other cess levied by the state government.
A group housing society can take single-point supply. The society’s bill is divided by the number of houses, so the slab limits are multiplied by the number of houses. The fixed charge is on the entire load.
Example: a society with 10 houses, a 20 kW load and 4,000 units. The first 2,000 units (200 × 10) cost ₹2.35, the next 2,000 units cost ₹4.10, and nothing falls in the top slab. Energy is ₹4,700 + ₹8,200 = ₹12,900, fixed charge is 20 × ₹13 = ₹260, and the total is ₹13,160.00.
Shops, offices, clinics, restaurants, petrol pumps and similar users fall in this category. Single-phase supply runs up to 5 kW, and three-phase supply above 5 kW up to 100 kW (110 kVA).
| Item | Single phase | Three phase |
|---|---|---|
| Energy charge | ₹3.75 up to 200 units, ₹5.60 for 201–500, ₹6.10 above 500 | ₹6.10 per kVAh on all units |
| Fixed charge | ₹66 per kW, load rounded up to next ½ kW | ₹159 per kVA of billing demand |
Three-phase commercial users are billed on kVAh, not kWh, as a demand-side management measure. Example: a three-phase shop with a 20 kVA contract demand, a recorded demand of 24 kVA and 2,000 kVAh. The 4 kVA of excess demand is charged at 2 times, and so are the units that belong to it. Demand charges are ₹3,180 + ₹1,272, energy is ₹14,233.33, and the total is ₹18,685.34.
From 1 September 2026, hotels, guest houses, resorts and homestays registered with the Tourism Department of the UT of Ladakh have their own sub-category. JERC did not reclassify them as industry, but approved a separate tariff after the UT Administration asked for support.
| Item | Single phase | Three phase |
|---|---|---|
| Energy charge | ₹4.30 per kWh on all units | ₹4.50 per kVAh on all units |
| Fixed charge | ₹66 per kW | ₹159 per kVA |
The bill for a 2 kW single-phase connection compares like this:
| Units | Ordinary commercial | Registered hotel / homestay |
|---|---|---|
| 50 | ₹320 | ₹347 |
| 100 | ₹507 | ₹562 |
| 200 | ₹882 | ₹992 |
| 300 | ₹1,442 | ₹1,422 |
| 500 | ₹2,562 | ₹2,282 |
| 800 | ₹4,392 | ₹3,572 |
| Category | Energy charge | Fixed or demand charge |
|---|---|---|
| Agriculture, metered, 0–10 HP | ₹1.00 per kWh | ₹40 per HP |
| Agriculture, metered, 11–20 HP | ₹1.50 per kWh | ₹40 per HP |
| Agriculture, metered, above 20 HP | ₹5.50 per kWh | ₹40 per HP |
| Agriculture, unmetered | — | ₹375, ₹413 or ₹2,250 per HP by band |
| Street light, metered | ₹8.95 per kWh | ₹84 per kW |
| Street light, unmetered | — | ₹5,250 per kW or part |
| Public water works, LT | ₹9.15 per kWh | ₹84 per kW |
| Public water works, 11 kV / 33 kV+ | ₹9.05 / ₹8.95 per kVAh | ₹310 per kVA |
| LT industry (LTIS-I) | ₹4.30 per kVAh | ₹71 per kVA |
| HT industry I, 11 kV / 33 kV | ₹4.25 / ₹4.20 per kVAh | ₹215 per kVA |
| HT industry II (power intensive), 11 kV / 33 kV | ₹4.90 / ₹4.80 per kVAh | ₹268 per kVA |
| General purpose bulk supply, 11 kV / 33 kV | ₹5.60 / ₹5.50 per kVAh | ₹252 per kVA |
| State / Central Government, LT / 11 kV / 33 kV+ | ₹8.95 / ₹8.85 / ₹8.75 per kVAh | ₹58 per kVA |
| EV charging, LT / 11 kV / 33 kV | ₹7.50 / ₹7.40 / ₹7.30 per kVAh | Nil |
At 66 kV, HT industry, power intensive industry, bulk supply and EV charging get 10 paise per unit off the 33 kV rate. Agriculture gets 10 paise off at 11 kV and 20 paise off at 33 kV and above.
| Window | Hours | Effect on energy charges |
|---|---|---|
| Peak, commercial and industrial | 6–8 am and 6–10 pm | +20% (LT commercial, LT industry, HT industry, bulk supply) |
| Peak, all other consumers | 6–8 am and 6–10 pm | +10% |
| Solar hours, all consumers | 9 am–5 pm | −20% |
ToD applies to consumers with a load above 10 kW, except agriculture. LT consumers are put on ToD once a smart meter is installed to measure it. The calculator applies the percentage to the average energy rate for those units.
| Item | Who gets it | Amount |
|---|---|---|
| Smart prepaid meter | Prepaid smart-metered consumers | 2% rebate on the energy charge |
| Metered on HT, load below 100 kW | Commercial and LT industry | 5% rebate on energy charges |
| Metered on LT, load above 100 kW | 11 kV categories (water works, HT industry, bulk, EV) | 5% surcharge on demand and energy charges |
| Voltage rebate | Agriculture; 66 kV supply of HT categories | 10 or 20 paise per unit; 10 paise off the 33 kV rate |
| Solar water heater | Metered consumers with a 100-litre or larger system | ₹150 a month |
| Green tariff | Any consumer who opts in | ₹0.50 per kWh extra |
For kVA-based categories the billing demand is the higher of the recorded maximum demand and 75% of contract demand. If a meter with a maximum demand indicator records more than the contract demand, the excess demand is charged at 2 times the normal rate, and so are the units belonging to it. The excess units equal total units × (1 − contract demand ÷ maximum demand). Contract demand cannot be reduced below 60% of the sanctioned connected demand.
Exhibitions, fairs, circuses, marriages, construction and temporary agriculture loads are billed at 1.5 times the normal fixed or demand charge and energy charge. Temporary supply is given for up to 3 months at a time. If it is extended beyond that, the charges double to 2 times.
JERC approved an average tariff increase of 2.34% on the subsidised tariff. Compared with the tariff in force before, the main changes are below.
| Category | Before 1 Sep 2026 | From 1 Sep 2026 |
|---|---|---|
| Domestic, up to 200 units | ₹2.20 | ₹2.35 |
| Domestic, 201–400 units | ₹3.80 | ₹4.10 |
| Domestic, above 400 units | ₹4.20 | ₹4.50 |
| Domestic fixed charge per kW | ₹12 | ₹13 |
| Commercial single phase, up to 200 units | ₹3.57 | ₹3.75 |
| Commercial single phase, 201–500 units | ₹5.30 | ₹5.60 |
| Commercial single phase, above 500 units | ₹5.78 | ₹6.10 |
| Commercial three phase, per kVAh | ₹5.78 | ₹6.10 |
| Commercial single phase fixed charge per kW | ₹63 | ₹66 |
| LT industry, per kVAh | ₹4.10 | ₹4.30 |
Hotels, guest houses and homestays moved to a flat ₹4.30 per kWh on single phase and ₹4.50 per kVAh on three phase. A bill that covers days before and after 1 September can mix the two tariffs, so check the dates on your bill.
| Service | Charge |
|---|---|
| Reconnection or disconnection, LT | ₹50 |
| Reconnection or disconnection, HT | ₹250 |
| Special meter reading, LT | ₹30 |
| Meter testing, single-phase LT meter | ₹60 |
| Meter testing, three-phase meter without CT | ₹100 |
| Transfer of name, LT | ₹120 |
| Temporary connection / disconnection, LT | ₹150 |
| Replacement of missing meter card | ₹15 |
The order says duty is extra but gives no rate. The calculator leaves it at 0 until you enter the percentage from your bill in Advanced mode.
JERC told LPDD to apply the fuel and power purchase cost adjustment formula, but gave no figure. Enter the per-unit amount from your bill.
The default is the subsidised tariff in Chapter 11 of the order, which is what LPDD bills. The full-cost figures are for comparison only.
The order prints ₹377 per ¼ kW, so 1 kW is ₹1,508. Some summaries show ₹1,509. For unmetered commercial above 1 kW, Table 11-2 prints ₹4,313 and the full-cost table ₹4,316.
The peak surcharge and solar-hour rebate are applied to the average energy rate of the units in each window.
Arrears, late payment surcharge, meter charges, GST-type levies and any state subsidy beyond the order are not part of the estimate.
The order notes that morning demand peaks in winter because of geysers and immersion rods. Heating can push a home from the ₹2.35 slab into ₹4.10 or ₹4.50.
A 100-litre system from JAKEDA or a registered dealer earns a ₹150 monthly rebate and cuts geyser use.
Above 10 kW, units used from 9 am to 5 pm get 20% off the energy charge, while peaks add 10% or 20%.
The rate jumps from ₹2.35 to ₹4.10 after 200 units. Small cuts near a slab edge save the most.
The fixed charge follows sanctioned load in half-kW steps, so a lower sanction cuts the monthly fixed charge.
A prepaid smart meter earns a 2% rebate on the energy charge.
Joint Electricity Regulatory Commission for the UT of Jammu and Kashmir and the UT of Ladakh, Tariff Order No. 05 of 2026 dated 18 August 2026 in Petition No. 12 of 2025, for the Ladakh Power Development Department, Chapter 11 (Tariff Schedule, including the subsidised Tables 11-1 to 11-13), Chapter 12 (Terms and Conditions) and Chapter 13 (Miscellaneous Charges). The tariff comes into effect from 1 September 2026. The Electricity Duty and FPPCA rates are not stated in the order.
A Ladakh (LPDD) bill is the energy charge for your units plus a fixed or demand charge, adjusted for Time-of-Day, prepaid or temporary-supply rules, with Electricity Duty and any other levy added. Domestic metered units are billed in three telescopic slabs, and the fixed charge is ₹13 per kW of sanctioned load.
For domestic metered consumers the subsidised rates are ₹2.35 for the first 200 units, ₹4.10 for 201–400 units and ₹4.50 above 400 units. BPL consumers pay ₹1.50 for the first 30 units. Commercial single phase pays ₹3.75, ₹5.60 and ₹6.10 by slab, and three-phase commercial pays ₹6.10 per kVAh.
The JERC order lists two tariffs. The full-cost tariff is what supplying power really costs, and domestic metered users would pay ₹4.10, ₹6.10 and ₹7.60 on it. The subsidised tariff is what consumers pay after the UT Government's grant-in-aid, and LPDD is allowed to bill on it. This calculator uses the subsidised tariff by default.
The fixed charge is ₹13 per kW per month for all units. Your load is rounded up to the next half kW before the charge is applied, so 0.25 kW is charged as 0.5 kW and 1.2 kW as 1.5 kW. A 3 kW home pays ₹39 a month.
BPL consumers with a certificate from the competent State Government authority pay ₹1.50 per unit for up to 30 units a month and ₹5 per kW fixed charge. Units above 30 are billed at the metered domestic rates for the slab they fall in.
Unmetered homes pay a flat monthly charge by load: ₹377 for every ¼ kW up to 2 kW. Above 2 kW it is ₹3,016 plus ₹863 for every additional ¼ kW or part of it, so a 3 kW load pays ₹6,468 a month.
A society takes single-point supply and its consumption is divided by the number of houses. The slab limits are multiplied by the number of houses, so 10 houses get 2,000 units at the first rate, the next 2,000 at the second and the rest at the third. The fixed charge is on the entire load.
Registered hotels, guest houses, resorts and homestays pay ₹4.30 per kWh on all units on single phase and ₹4.50 per kVAh on three phase, with the same fixed charge as other commercial users. They must be registered with the Ladakh Tourism Department. The rate is lower than ordinary commercial slabs above about 300 units a month.
ToD applies to consumers with a load above 10 kW, except agriculture. Energy charges rise 20% for commercial and industrial users and 10% for others during peak hours of 6–8 am and 6–10 pm. All consumers get 20% off energy charges in solar hours from 9 am to 5 pm. LT users get it after a smart meter is installed.
Yes. Consumers on prepaid smart meters get a 2% rebate on the energy charge of their category. The calculator applies it when you choose the prepaid option.
Metered consumers with a solar water heater of at least 100 litres from JAKEDA or a registered dealer can get a rebate of ₹150 a month. They need to give proof of purchase and an affidavit, and the meter reader verifies the system.
No. The tariff order says the tariffs exclude Electricity Duty and any other levy, which are charged extra. FPPCA, the fuel and power purchase cost adjustment, follows the JERC regulations and changes over time. The calculator lets you enter your own duty percentage and FPPCA per unit from your bill.
The Licensee charges 1.5% a month on the unpaid principal amount after the due date. For example, ₹1,000 unpaid by 30 June becomes ₹1,015, and ₹1,030 by 31 July. Arrears and surcharge are not part of this estimate.
It follows JERC Order No. 05 of 2026 line by line and reproduces the order's own worked examples. Your real bill can differ because of the meter reading, duty, FPPCA, arrears and bills that straddle the 1 September 2026 change. Treat the result as an estimate.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.