Based on the MPERC Retail Supply Tariff Order for FY 2026–27 (Annexure 2, LT tariff schedules LV-1 to LV-6). Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your units. The calculator applies the MPERC FY 2026–27 LT tariff, including the slab-wise fixed charge, billing-days proration, Time-of-Day rates, rebates, Electricity Duty and Atal Griha Jyoti.
Based on the MPERC Retail Supply Tariff Order for FY 2026–27 (Annexure 2, LT tariff schedules LV-1 to LV-6). Free, no sign-up. An estimate, not your official bill.
Pick your category, then fill in the fields that appear. Each category shows only the inputs its tariff needs.
Homes use LV-1.2. Shops, offices and clinics use LV-2.2. Then pick urban or rural.
Enter the units for the period and the days between meter readings. The slabs are prorated if the period is not 30 days.
Choose how you pay. Open Advanced to set Electricity Duty, FPPAS or to use meter readings and a budget.
See each charge, the Atal Griha Jyoti estimate for eligible homes, and the rounded total. Print or share the result.
It follows the tariff order line by line, including the parts that simple slab calculators leave out.
Uses the ₹81 / ₹134 per-connection charge and the ₹30 per 0.1 kW rule that depend on your total units.
Scales the slab limits when your meter reading period is not 30 days, as the order’s own example does.
Shows what an eligible home may pay under the ₹1 per unit scheme, next to the tariff bill.
Domestic, shops, schools, water works, LT industry, agriculture, EV charging and temporary supply.
Applies the 10% and 20% peak and 20% solar-hour rates, the 25–40% load-factor slabs and the PF table.
The order charges no metering fee, so none is added. Rounding to the nearest rupee is applied.
The bill has an energy charge and a fixed charge. For homes the energy charge is telescopic, so each slab of units is billed at its own rate. The fixed charge is not telescopic: it is set by the slab your total units fall in. Adjustments for Time-of-Day, power factor, load factor and rebates follow, then Electricity Duty and any FPPAS are added and the total is rounded.
Bill = energy charge + fixed charge ± ToD and PF adjustments − incentives and rebates + Electricity Duty + FPPAS, rounded to the nearest rupee
The table lists the LT categories in the MPERC order. It applies to all three DISCOMs.
| Category | Group | Rates and rules |
|---|
The fixed charge for homes is the part most online calculators get wrong. It is not one number. It changes with your total monthly units.
| Units in the month | Urban fixed charge | Rural fixed charge |
|---|---|---|
| Up to 50 | ₹81 per connection | ₹67 per connection |
| 51 to 150 | ₹134 per connection | ₹111 per connection |
| 151 to 300 | ₹30 for each 0.1 kW | ₹28 for each 0.1 kW |
| Above 300 | ₹30 for each 0.1 kW | ₹28 for each 0.1 kW |
For the last two rows, every 15 units or part of 15 units counts as 0.1 kW. Consumption of 155 units counts as 1.1 kW, and 350 units counts as 2.4 kW, as the order explains.
The table uses LV-1.2 with 9% Electricity Duty, no subsidy and a postpaid meter, over 30 days.
| Units | Urban fixed | Urban bill | Rural fixed | Rural bill |
|---|
| Line | Working | Amount |
|---|---|---|
| Energy, first 50 units | 50 × ₹4.71 | ₹235.50 |
| Energy, 51 to 150 | 100 × ₹5.67 | ₹567.00 |
| Energy, 151 to 200 | 50 × ₹7.05 | ₹352.50 |
| Fixed charge | 200 ÷ 15 = 14 blocks, 1.4 kW × ₹30 per 0.1 kW | ₹420.00 |
| Electricity Duty | 9% of ₹1,155.00 energy charge | ₹103.95 |
| Total | Rounded to the nearest rupee | ₹1,679 |
State government statements describe the scheme as giving domestic consumers who use up to 150 units a month the first 100 units at ₹1 per unit, with the state paying the rest. Units above 100 and up to 150 are billed at the normal rate, and above 150 units the subsidy does not apply. Because it comes from the state, not MPERC, the calculator keeps the tariff bill and shows the scheme as a separate estimate.
| Units | Tariff bill | With Atal Griha Jyoti (estimate) |
|---|
If your meter readings are not 30 days apart, MPERC prorates the slab limits. In the order’s example, 450 units over 36 days is billed as 60 units in the first slab, 120 in the second, 180 in the third and 90 above. The calculator does the same when you change the billing days.
| Consumer | Peak (6–9 am, 5–10 pm) | Solar hours (9 am–5 pm) | Other hours |
|---|---|---|---|
| LV-1 and LV-3, load above 10 kW | +10% | −20% | Normal |
| LV-2 and LV-4, load above 10 kW | +20% | −20% | Normal |
| Smart meter, load up to 10 kW | Normal | −20% | Normal |
| LV-6 EV charging | +20% (all hours outside 9 am–5 pm) | −20% | +20% |
| LV-5 agriculture | ToD does not apply | ||
| Item | Who | Amount |
|---|---|---|
| Prepaid meter | All LT | ₹0.25 per unit off the energy charge |
| Online payment | All LT | 0.5% of the bill; ₹5 to ₹20 for non-domestic, no cap for domestic |
| Prompt payment | Bills of ₹10,000 or more | 0.5% if paid at least 7 days before the due date, no arrears |
| Load-factor incentive | Demand-based | 12 paise above 25% load factor, a further 24 paise above 30% and 36 paise above 40%, on units over each threshold |
| Power-factor incentive | Not domestic | 0.5% at 86% rising to 5% at 95% and 10% at 100% |
| Power-factor surcharge | Not domestic | 1% at 79% rising to 5% at 75%, 10% at 71% or below |
| Energy-saving devices | LV-3 and LV-5 | 5% of energy charge for LV-3; 15, 30 or 45 paise per unit for pumps |
| Delayed payment | All | 1.25% per month on the outstanding amount (not in the estimate) |
Billing demand is the recorded maximum demand or 90% of contract demand, whichever is higher, rounded to the nearest whole number. If the recorded demand goes above 120% of contract demand, the extra up to 130% pays 1.3 times the fixed rate and anything above 130% pays 2 times. Energy charges are not increased. Loads of 10 kW or less normally use the load-based rows, and demand-based billing is mandatory above 10 kW for LV-2 and for all LV-4 industry.
₹81 applies only up to 50 units. At 100 units it is ₹134, and at 200 units it is ₹420 in urban areas.
The tariff order says no metering charges are levied, so ₹10 meter rent does not belong on the bill.
Above 150 units the fixed charge follows each 15 units as 0.1 kW, not a single connection charge.
Shops with up to 50 units pay ₹6.80 on all units, but above 50 units ₹8.30 applies to every unit.
Rural fixed charges are lower, and the rural flat rate for unmetered homes is a different calculation.
Bills are rounded to the nearest rupee, and eligible homes may pay far less under Atal Griha Jyoti.
Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company (MPPKVVCL, Indore) serves the west, Madhya Kshetra (MPMKVVCL, Bhopal) serves the centre and Poorv Kshetra (MPPoKVVCL, Jabalpur) serves the east. MPERC sets one retail tariff, so all three charge the same rates.
The duty is a state levy outside the tariff order. The calculator assumes 9% of the energy charge and lets you change it.
The scheme is announced by the state. The treatment of units 101 to 150 is an estimate and can change.
The 120% and 130% excess-demand rule is applied as written. Check your bill if you exceed contract demand.
Load factor uses units ÷ (hours × the higher of recorded and contract demand), rounded down, as in the order.
HT and EHT tariffs, open access, net metering, standby charges, delayed-payment surcharge and security deposit.
Temporary rates are included for construction, events and non-domestic use. Check the order for other cases.
Crossing 150 units switches the fixed charge to the per-0.1 kW rule and removes Atal Griha Jyoti eligibility.
Units from 9 am to 5 pm cost 20% less with ToD or a smart meter.
Online payment earns 0.5% and prepaid meters give ₹0.25 per unit off.
Non-domestic and industrial connections earn up to 10% back on energy charges.
For demand-based billing you pay on at least 90% of contract demand every month.
MP has strong sunshine, and net metering can cut the units you buy.
Madhya Pradesh Electricity Regulatory Commission, ARR for FY 2026–27 and Retail Supply Tariff Order for FY 2026–27, Annexure 2 (Tariff Schedules for Low Tension Consumers, LV-1 to LV-6, with the General Terms and Conditions). Atal Griha Jyoti details are from state government and DISCOM statements.
An MP bill adds a telescopic energy charge and a fixed charge, then applies Time-of-Day, power-factor, load-factor and rebate adjustments, adds Electricity Duty and any FPPAS, and rounds the total to the nearest rupee. For homes (LV-1.2) the energy rates are ₹4.71, ₹5.67, ₹7.05 and ₹7.24 per unit for 0–50, 51–150, 151–300 and above 300 units.
For LV-1.2 domestic the MPERC rates are ₹4.71 up to 50 units, ₹5.67 for 51–150, ₹7.05 for 151–300 and ₹7.24 above 300 units, each charged only for the units in that slab. LV-1.1 (up to 100 W and 30 units) is ₹3.72 per unit. Non-domestic shops pay ₹6.80 or ₹8.30 per unit on all units depending on whether they use more than 50 units.
It depends on your total units. Up to 50 units the fixed charge is ₹81 (urban) or ₹67 (rural) per connection. For 51 to 150 units it is ₹134 or ₹111. Above 150 units it is ₹30 (urban) or ₹28 (rural) for each 0.1 kW, counting every 15 units or part of 15 as 0.1 kW. So 200 units means 1.4 kW and a fixed charge of ₹420 in urban areas.
With 9% Electricity Duty and no subsidy, an urban home pays about ₹700 for 100 units, ₹1,679 for 200 units and ₹2,627 for 300 units. A rural home pays about ₹677, ₹1,651 and ₹2,587. The calculator shows every line so you can check them.
Under Atal Griha Jyoti, state government statements say domestic consumers using up to 150 units a month pay ₹1 per unit for the first 100 units, with the rest up to 150 units at the normal rate. The scheme is run by the state, not MPERC, so the calculator shows it as a separate estimate under your result instead of changing the tariff bill.
No. The MPERC tariff order for FY 2026–27 says no metering charges are levied. Calculators that add ₹10 meter rent to the bill overstate it.
Electricity Duty is a state levy under the Madhya Pradesh Electricity Duty Act and is not part of the MPERC tariff. The calculator assumes 9% of the energy charge, which is the rate most sources use, and lets you change it in Advanced mode to match your bill.
FPPAS is the fuel and power purchase price adjustment surcharge. It is announced separately by the DISCOMs, can change month to month and is a percentage of the energy charge. Enter the percentage from your bill in Advanced mode.
Consumers with a load above 10 kW pay a surcharge on units used during peak hours (6–9 am and 5–10 pm), 10% for homes and water works and 20% for non-domestic and industry, and get a 20% rebate for 9 am to 5 pm. Consumers up to 10 kW with a smart meter get only the 20% rebate for 9 am to 5 pm. Agriculture is exempt.
Prepaid consumers get ₹0.25 per unit off the energy charge. Paying online earns 0.5% of the bill, with no cap for homes and ₹5 to ₹20 for others. Consumers with bills of ₹10,000 or more who pay 7 days before the due date and have no arrears get 0.5%. Demand-based consumers can earn a load-factor incentive and a power-factor incentive.
Rural areas are those notified by the Government of Madhya Pradesh in March 2006, and all other areas are urban. Rural homes have lower fixed charges but the same energy rates.
No. MPERC issues one retail tariff for all three distribution companies: Paschim Kshetra (Indore), Madhya Kshetra (Bhopal) and Poorv Kshetra (Jabalpur). The same calculator works for all of them.
The tariff order says every bill is rounded to the nearest rupee: up to 49 paise is dropped and 50 paise or more goes up. The calculator shows the rounding as its own line.
This version covers LV (low tension) categories LV-1 to LV-6 from the MPERC LT tariff schedules. HT and EHT tariffs are in a separate annexure and are not included yet.
No. It is an estimate. Your bill can differ because of billing days, FPPAS, arrears, subsidy changes announced by the state and the exact duty rate on your connection.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.