Manipur · MnERC tariff 2026–27 · MSPDCL

Manipur Electricity Bill Calculator

Choose your connection and enter your load and units. The calculator applies the official MnERC FY 2026–27 tariff (effective 1 May 2026): telescopic slabs, fixed charge per kW or kVA, Time-of-Day rates, power factor, meter rent, temporary supply and the rule that every bill item is rounded to the nearest rupee.

FY 2026–27 official ratesAll LT and HT categoriesToD, PF, meter rent, rounding
Your electricity bill
The same MSPDCL tariff applies in Imphal and in the hills. Pick the category printed on your bill.
Your contracted load from the bill. Part of a kW counts as it is; a load below 0.5 kW is billed as 0.5 kW.
From your bill. Billing demand is the higher of contract demand and recorded demand. Leave blank to bill at the contract demand.
Total units for the billing month (kWh for LT, kVAh for HT).
ToD Option-2 only. Billed at 110% of the normal rate (120% for commercial and industrial).
Billed at 80% of the normal rate.
Billed at 110% of the normal rate (120% for commercial and industrial). Leave all three ToD fields at 0 for the normal Option-1 tariff.
Above 0.95 earns an incentive of 1% of the energy charge per point; below 0.90 adds a surcharge.
Applies to the energy and fixed (demand) charge together.
Temporary supply pays 1.5 times the fixed charge and 1.5 times the highest-slab energy rate on every unit.
The 1% rebate is applied to the energy and fixed charge for prepaid meters.
Meter rent is charged per month by meter type. Pick “No meter rent” if you own the meter.

Meter readings and budget (LT)

LT only. From your last bill.
LT only. The meter reading now.
LT only. Leave blank to skip.

Duty, delay and other bill items

The MnERC tariff excludes taxes and duty, so the defaults are 0. Enter the figures shown on your own bill.
The tariff order does not include duty or GST. Enter a rate only if your bill shows one.
Surcharge is 2% per month, or part of a month, as simple interest on the outstanding bill.
Arrears or any other item from your bill.

Based on the MnERC Tariff Order for MSPDCL for FY 2026–27 (effective 1 May 2026), Tariff A (subsidised). Free, no sign-up. An estimate, not your official bill.

How to calculate your Manipur electricity bill

Pick your connection category, then fill in the fields that appear. Each category shows only the inputs its tariff needs.

1

Choose the category

Homes use LT Domestic. Shops, offices, clinics and EV chargers use LT Commercial. Farm pumps, small workshops and 11 kV and above connections each have their own category. The tariff table below lists every rate.

2

Enter load and units

Enter the contracted load from your bill and the units for the month. HT categories take contract demand in kVA and, if you have it, the recorded maximum demand.

3

Add ToD, power factor and meter type

Leave ToD blank for the normal tariff, or enter smart-meter units for morning peak, solar hours and evening peak. Pick your meter type so meter rent is included.

4

Read the breakdown

See every line from slab charge to meter rent, the total and a note on rounding. Print, save as PDF or share the result.

What this calculator does

It follows the MnERC tariff schedule clause by clause and shows each step of the working.

All Manipur LT and HT categories

Covers Kutir Jyoti, domestic, commercial, public lighting, water works, agriculture, irrigation, small industry and every HT category, including the new EV, 33 kV and railway traction classes.

Fixed charge per kW, not a flat fee

Uses ₹65 per kW for domestic and ₹85 per kW for commercial, as the order says, and ₹105 per kVA of billing demand for HT.

Telescopic slabs

Charges each slab only for the units inside it, with the exact FY 2026–27 rates for the first 100, next 100 and above 200 units.

ToD, power factor and temporary supply

Applies the published solar-hour and peak rates, the 95% and 90% power-factor rules, and the 1.5× temporary-supply rule.

Meter rent and rebates

Adds meter rent by meter type and applies the 1% prepaid rebate and the 5% or 10% supply-voltage rebate or surcharge.

Rupee-by-rupee rounding

Rounds every bill component to the nearest rupee, as clause 12.1.12 requires, and shows the ₹10 amount you may tender.

How is a Manipur electricity bill calculated?

MSPDCL, the Manipur State Power Distribution Corporation Limited, bills almost every consumer in the state, and the Manipur Electricity Regulatory Commission (MnERC) sets the tariff. The bill is built from a few parts. The energy charge is your units billed in telescopic slabs. The fixed charge is a per-kW amount on contracted load, or a per-kVA amount on billing demand for HT. Time-of-Day, power factor and rebates adjust the charge, and meter rent is added.

Bill = energy charge + fixed (or demand) charge ± power factor, voltage and prepaid adjustments + meter rent + any duty or late-payment surcharge, each item rounded to the nearest rupee

The tariff is the subsidised Tariff A. It is stated without taxes or duty, which is why the calculator assumes 0% duty until you enter a rate from your own bill.

Manipur electricity tariff by category, FY 2026–27

The table lists every category in the approved schedule, effective 1 May 2026. “LT” energy is in kWh and “HT” energy is in kVAh.

CategorySupplyRates and rules
Kutir Jyoti (lifeline, up to 45 kWh per 3 months)LTKutir Jyoti: ₹25 per month fixed (per connection, not per kW) and ₹2.10 per kWh on all units, for consumption up to 45 kWh per 3 months.
LT DomesticLTFixed charge ₹65 per kW of contracted load. Energy is telescopic: ₹5.36 for the first 100 units, ₹6.25 for the next 100 and ₹7.10 above 200 units.
LT Non-Domestic / CommercialLTFixed charge ₹85 per kW of contracted load. Energy ₹7.07 for 0–100 units, ₹7.85 for 101–200 and ₹8.30 above 200.
LT EV Charging StationLTNew FY 2026–27 category. Charged at the LT Commercial tariff: ₹85 per kW fixed and ₹7.07 / ₹7.85 / ₹8.30 per kWh by slab. Other facilities at the station (restaurant, shop) are also billed as commercial.
LT Public LightingLTFixed charge ₹70 per kW of contracted load. Energy ₹9.85 per kWh on all units.
LT Public Water WorksLTFixed charge ₹105 per kW of contracted load. Energy ₹9.95 per kWh on all units.
LT Agriculture (individual farmer pump)LTFixed charge ₹65 per kW of contracted load. Energy ₹4.91 per kWh. No ToD tariff for agriculture.
LT Irrigation (others)LTFixed charge ₹65 per kW of contracted load. Energy ₹4.91 per kWh. The order says no ToD tariff applies to this category.
LT Cottage / Small / Micro Industry (up to 50 kW)LTFixed charge ₹70 per kW of contracted load. Energy ₹6.15 per kWh on all units.
HT CommercialHTDemand charge ₹105 per kVA of billing demand. Energy ₹9.61 per kVAh on all units.
HT consumption at 33 kV (new category)HTNew FY 2026–27 category. For the first year it pays the HT Commercial tariff: ₹105 per kVA and ₹9.61 per kVAh.
HT EV Charging Station (11 kV and above)HTNew FY 2026–27 category. Charged at the HT Commercial tariff: ₹105 per kVA and ₹9.61 per kVAh.
HT Railway Traction (132 / 33 kV, new category)HTNew FY 2026–27 category. For the first year it pays the HT Commercial tariff: ₹105 per kVA and ₹9.61 per kVAh.
HT Public Water WorksHTDemand charge ₹105 per kVA of billing demand. Energy ₹9.90 per kVAh.
HT Agriculture (individual farmer)HTDemand charge ₹105 per kVA of billing demand. Energy ₹5.66 per kVAh. No ToD tariff.
HT Irrigation (others)HTDemand charge ₹105 per kVA of billing demand. Energy ₹5.66 per kVAh. The order says no ToD tariff applies.
HT Medium Industry (up to 125 kVA)HTDemand charge ₹105 per kVA of billing demand. Energy ₹8.80 per kVAh. For contract demand up to 125 kVA.
HT Large Industry (above 125 kVA)HTDemand charge ₹105 per kVA of billing demand. Energy ₹9.85 per kVAh. For contract demand above 125 kVA.
HT Bulk SupplyHTDemand charge ₹105 per kVA of billing demand. Energy ₹9.90 per kVAh. Schools, hospitals, offices and campuses with their own distribution.

Manipur tariff: FY 2025–26 versus FY 2026–27

MnERC approved an average hike of 5.05%, well below the 13.83% MSPDCL asked for. The table shows fixed charge and energy rate per unit (₹ per kW or kVA, then ₹ per kWh or kVAh).

CategoryFY 2025–26FY 2026–27Energy rate change
Kutir Jyoti (per connection)₹25 · ₹2.10₹25 · ₹2.10No change
LT Domestic, 0–100 units₹65 · ₹5.10₹65 · ₹5.36+5.1%
LT Domestic, 101–200 units₹65 · ₹5.95₹65 · ₹6.25+5.0%
LT Domestic, above 200 units₹65 · ₹6.75₹65 · ₹7.10+5.2%
LT Commercial, 0–100 units₹85 · ₹6.55₹85 · ₹7.07+7.9%
LT Commercial, 101–200 units₹85 · ₹7.25₹85 · ₹7.85+8.3%
LT Commercial, above 200 units₹85 · ₹7.65₹85 · ₹8.30+8.5%
LT Public Lighting₹70 · ₹9.60₹70 · ₹9.85+2.6%
LT Public Water Works₹105 · ₹9.80₹105 · ₹9.95+1.5%
LT Agriculture / Irrigation₹65 · ₹4.55₹65 · ₹4.91+7.9%
LT Cottage and Small Industry₹70 · ₹5.60₹70 · ₹6.15+9.8%
HT Commercial₹105 · ₹8.90₹105 · ₹9.61+8.0%
HT Public Water Works₹105 · ₹9.60₹105 · ₹9.90+3.1%
HT Agriculture / Irrigation₹105 · ₹5.15₹105 · ₹5.66+9.9%
HT Medium Industry₹105 · ₹8.00₹105 · ₹8.80+10.0%
HT Large Industry₹105 · ₹9.10₹105 · ₹9.85+8.2%
HT Bulk Supply₹105 · ₹9.25₹105 · ₹9.90+7.0%

LT Domestic energy slabs

Units in the monthRate per unitCumulative energy charge at the top of the slab
0 – 100₹5.36₹536.00
101 – 200₹6.25₹1,161.00
201 and above₹7.10₹1,161 + ₹7.10 per extra unit

The slabs are telescopic. A month of 150 units pays the first 100 units at ₹5.36 and the remaining 50 at ₹6.25, not all 150 at one rate.

Domestic fixed charge by contracted load

Contracted loadRateMonthly fixed charge
0.5 kW₹65 per kW₹32.50
1 kW₹65 per kW₹65
2 kW₹65 per kW₹130
3 kW₹65 per kW₹195
5 kW₹65 per kW₹325
8 kW₹65 per kW₹520

The fixed charge is contracted load × ₹65, payable even if you use no units. A load below 500 W is treated as 0.5 kW, and above that the actual load is used, not rounded.

Domestic bills for common monthly units

The table shows a 1 kW and a 3 kW home on a postpaid meter. “Tariff only” is energy plus fixed charge. “With meter rent” adds ₹10 for a single-phase postpaid meter. Duty is not included.

Units1 kW tariff only1 kW with meter rent3 kW tariff only3 kW with meter rent
50₹333₹343₹463₹473
100₹601₹611₹731₹741
150₹914₹924₹1,044₹1,054
200₹1,226₹1,236₹1,356₹1,366
250₹1,581₹1,591₹1,711₹1,721
300₹1,936₹1,946₹2,066₹2,076
400₹2,646₹2,656₹2,776₹2,786
500₹3,356₹3,366₹3,486₹3,496
750₹5,131₹5,141₹5,261₹5,271
1000₹6,906₹6,916₹7,036₹7,046

Manipur electricity bill by units: worked examples

These examples use a 2 kW domestic connection with a single-phase postpaid meter (₹10 rent).

Electricity bill for 50 units in Manipur: ₹408

A 2 kW home using 50 units pays 50 units × ₹5.36 = ₹268.00, so the energy charge is ₹268. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹408, about ₹8.16 per unit.

Electricity bill for 100 units in Manipur: ₹676

A 2 kW home using 100 units pays 100 units × ₹5.36 = ₹536.00, so the energy charge is ₹536. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹676, about ₹6.76 per unit.

Electricity bill for 150 units in Manipur: ₹989

A 2 kW home using 150 units pays 100 units × ₹5.36 = ₹536.00; 50 units × ₹6.25 = ₹312.50, so the energy charge is ₹849. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹989, about ₹6.59 per unit.

Electricity bill for 200 units in Manipur: ₹1,301

A 2 kW home using 200 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00, so the energy charge is ₹1,161. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹1,301, about ₹6.51 per unit.

Electricity bill for 250 units in Manipur: ₹1,656

A 2 kW home using 250 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 50 units × ₹7.10 = ₹355.00, so the energy charge is ₹1,516. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹1,656, about ₹6.62 per unit.

Electricity bill for 300 units in Manipur: ₹2,011

A 2 kW home using 300 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 100 units × ₹7.10 = ₹710.00, so the energy charge is ₹1,871. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹2,011, about ₹6.70 per unit.

Electricity bill for 400 units in Manipur: ₹2,721

A 2 kW home using 400 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 200 units × ₹7.10 = ₹1,420.00, so the energy charge is ₹2,581. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹2,721, about ₹6.80 per unit.

Electricity bill for 500 units in Manipur: ₹3,431

A 2 kW home using 500 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 300 units × ₹7.10 = ₹2,130.00, so the energy charge is ₹3,291. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹3,431, about ₹6.86 per unit.

Electricity bill for 750 units in Manipur: ₹5,206

A 2 kW home using 750 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 550 units × ₹7.10 = ₹3,905.00, so the energy charge is ₹5,066. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹5,206, about ₹6.94 per unit.

Electricity bill for 1000 units in Manipur: ₹6,981

A 2 kW home using 1000 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 800 units × ₹7.10 = ₹5,680.00, so the energy charge is ₹6,841. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹6,981, about ₹6.98 per unit.

Commercial bills for common monthly units

LT Commercial pays ₹85 per kW fixed and ₹7.07, ₹7.85 and ₹8.30 per kWh by slab.

Units1 kW tariff only1 kW with meter rent3 kW tariff only3 kW with meter rent
50₹439₹449₹609₹619
100₹792₹802₹962₹972
150₹1,185₹1,195₹1,355₹1,365
200₹1,577₹1,587₹1,747₹1,757
250₹1,992₹2,002₹2,162₹2,172
300₹2,407₹2,417₹2,577₹2,587
400₹3,237₹3,247₹3,407₹3,417
500₹4,067₹4,077₹4,237₹4,247
750₹6,142₹6,152₹6,312₹6,322
1000₹8,217₹8,227₹8,387₹8,397

Worked example 1: home with 250 units and 2 kW

LineWorkingAmount
Energy charge100 × ₹5.36 + 100 × ₹6.25 + 50 × ₹7.10₹1,516
Fixed charge2 kW × ₹65₹130
Meter rentSingle-phase postpaid₹10
Total₹1,656

Worked example 2: shop with 5 kW, 600 units and power factor 0.97

LineWorkingAmount
Energy charge100 × ₹7.07 + 100 × ₹7.85 + 400 × ₹8.30₹4,812
Fixed charge5 kW × ₹85₹425
Power-factor incentive2 points above 95% = 2% of ₹4,812−₹96
Meter rentSingle-phase postpaid₹10
Total₹5,151

Worked example 3: large HT industry, 200 kVA contract, 210 kVA recorded, 40,000 kVAh, PF 0.96

LineWorkingAmount
Energy charge40,000 kVAh × ₹9.85₹3,94,000
Demand charge210 kVA billing demand × ₹105 (higher of contract and recorded)₹22,050
Power-factor incentive1 point above 95% = 1% of energy charge−₹3,940
Meter rentCT and PT operated₹500
Total₹4,12,610

Kutir Jyoti: the lifeline tariff

Kutir Jyoti connections pay ₹25 a month and ₹2.10 per kWh on every unit, for use up to 45 kWh per 3 months. The Commission kept this tariff unchanged for FY 2026–27 and noted that it gives special treatment to Kutir Jyoti and agriculture. At 15 units a month the energy charge is ₹32 (₹31.50 rounded) and the total is ₹57.

Time-of-Day windows and rates

MnERC replaced the old 4 am–6 am and 10 am–4 pm blocks with a solar-hours structure for FY 2026–27.

PeriodTimeRate
Normal10 pm – 6 am100% of the normal rate
Morning peak6 am – 9 am110% (120% for commercial and industrial)
Solar hours9 am – 5 pm80% of the normal rate
Evening peak5 pm – 10 pm110% (120% for commercial and industrial)

ToD energy rates by category

CategoryNormal ratePeak rate (6–9 am, 5–10 pm)Solar-hour rate (9 am–5 pm)
LT Domestic₹5.36 / 6.25 / 7.10110% (₹5.89 / 6.87 / 7.81)80% (₹4.28 / 5.00 / 5.68)
LT Commercial and EV charging₹7.07 / 7.85 / 8.30120% (₹8.49 / 9.42 / 9.96)80% (₹5.66 / 6.28 / 6.64)
LT Public Lighting₹9.85110% (₹10.84)80% (₹7.88)
LT Public Water Works₹9.95110% (₹10.95)80% (₹7.96)
LT Small Industry₹6.15120% (₹7.38)80% (₹4.92)
HT Commercial (and 33 kV, EV, railway)₹9.61120% (₹11.53)80% (₹7.69)
HT Public Water Works₹9.90110% (₹10.89)80% (₹7.92)
HT Medium Industry₹8.80120% (₹10.56)80% (₹7.04)
HT Large Industry₹9.85120% (₹11.82)80% (₹7.88)
HT Bulk Supply₹9.90110% (₹10.89)80% (₹7.92)

ToD is Option-2. The fixed charge stays the same, and agriculture and irrigation have no ToD tariff. The order allows consumers to take ToD only once MSPDCL has the metering, data and billing systems ready. The example below shows a 3 kW home using 300 units, 60 in the morning peak, 120 in solar hours and 60 in the evening peak: ToD gives ₹2,000 against ₹2,076 on the normal tariff.

Power factor surcharge and incentive

Average monthly power factorEffect on the energy charge
Above 95% up to unityIncentive of 1% for each point above 95% (up to 5%)
90% to 95%No incentive or surcharge
89% down to 85%Surcharge of 1% for each point below 90%
Below 85%Surcharge of 2% for each point below 85%, on top of the 5% above
Below 70%The utility may disconnect after a 15-day notice

Power factor is kWh divided by kVAh for the month, rounded to two decimals, with the third decimal of 5 or more rounding up. A new consumer under 90% in the first 6 months can have the surcharge withdrawn after 3 months at 90% or more.

Temporary power supply

Temporary supply is billed at 1.5 times the fixed or demand charge of the category and 1.5 times the energy rate of the highest slab on all units. For a 2 kW domestic connection that is ₹97.50 per kW-month × 2 plus ₹10.65 per unit.

Meter rent by meter type

MeterRent per month
AC single phase, whole current, postpaid₹10
AC three phase, whole current, postpaid₹20
AC three phase, CT operated, postpaid₹50
AC three phase, CT and PT operated, postpaid₹500
Single phase prepaid₹20
Three phase prepaid₹40
Single phase smart meter₹40
Three phase smart meter₹60

Rebates, surcharges and other rules

ItemRule
Prepaid advance payment1% rebate on the applicable tariff for consumers with prepaid meters
HV/EHV supply, load up to 50 kW5% rebate on both energy and fixed charge
Supply below base voltage, load above 50 kW10% extra on the energy plus fixed charge
Late payment2% per month, simple interest on the outstanding principal, for each month or part
RoundingEach bill item rounded to the nearest rupee; ₹10 tender allowed, with the extra carried forward
Mixed useA home used partly for business is billed in full at the higher-rate category
Single point supplySupply at other points is a separate connection with its own bill

What changed in the FY 2026–27 order

  • The new tariff is effective 1 May 2026 and applies an average hike of 5.05% after MSPDCL asked for 13.83%.
  • Domestic energy rates rose from ₹5.10 / ₹5.95 / ₹6.75 to ₹5.36 / ₹6.25 / ₹7.10 per unit, while the fixed charge stayed ₹65 per kW.
  • ToD moved to a solar-hours design: 80% from 9 am to 5 pm and 110% or 120% in the morning and evening peaks.
  • New categories were created for LT and HT EV charging stations, railway traction (132/33 kV) and HT supply at 33 kV, all billed at the HT Commercial tariff for the first year (EV at LT is billed as LT Commercial).
  • HT consumers are billed on kVAh for energy, not kWh, and MnERC said no new connection should be released without a meter.
  • Wheeling charge was set at ₹1.35 per kWh, against ₹2.04 proposed.

Cost of supply and why the tariff is subsidised

The tariff stays below the cost of serving consumers. MSPDCL reported an average cost of supply of ₹12.46 per kWh against an average realisation of ₹8.50 per kWh even after subsidy, and the State Government committed ₹360 crore of subsidy for FY 2026–27.

Supply voltagePower purchase cost (₹/unit)Network cost (₹/unit)Cost of supply (₹/unit)
33 kV8.101.459.55
11 kV8.511.5310.04
400 V (LT)11.011.9812.99

Limits and assumptions

Tariff A only

The order gives only the subsidised Tariff A. If MSPDCL ever bills the full-cost Tariff B because subsidy is not paid, this calculator cannot reproduce it.

Duty and taxes

The tariff excludes taxes and duty, so duty defaults to 0%. Enter the rate from your bill in Advanced mode if you have one.

Meter rent default

The calculator adds ₹10 for a single-phase postpaid meter on LT and ₹500 for a CT and PT meter on HT. Change the meter type to match your bill.

ToD estimate

The order does not say how slabs combine with ToD. The calculator spreads each slab’s units across the time periods in proportion to your ToD readings.

Prepaid rebate

The 1% advance-payment rebate is applied to the energy plus fixed charge. Your bill may apply it to the energy charge only.

Not modelled

Arrears, transformer-loss addition for LT-metered HT supply, theft assessment, one-time connection charges and pole-usage charges are not included.

Ways to lower a Manipur electricity bill

Watch the 100 and 200 unit marks

The rate rises from ₹5.36 to ₹6.25 after 100 units and to ₹7.10 after 200, so trimming use near a slab edge saves the most.

Right-size your load

Fixed charge is ₹65 for every kW you have contracted, so a larger load costs more every month even if you use no units.

Use solar hours if you have ToD

On ToD, 9 am–5 pm units cost 80% of the normal rate, while morning and evening peaks cost 10% to 20% more.

Fix your power factor

Keep the average above 0.90 to avoid the surcharge, and above 0.95 to earn a 1% incentive per point.

Consider a prepaid meter

Prepaid consumers get a 1% rebate for advance payment, and you can watch usage day by day.

Avoid temporary connections

Temporary supply costs 1.5 times the fixed charge and the highest-slab rate on every unit, so apply for a permanent connection if you can.

MSPDCL and MnERC

The Manipur State Power Distribution Corporation Limited (MSPDCL) supplies and bills consumers across Manipur. The Manipur Electricity Regulatory Commission (MnERC), which became functional on 23 July 2024, determines the tariff.

Official tariff source

Manipur Electricity Regulatory Commission, Tariff Order for MSPDCL for FY 2026–27 (Chapters 8, 9, 10 and 12, Tariff Schedule), effective 1 May 2026. Rebates, surcharges and meter rent come from the General Conditions of Supply and Miscellaneous Charges in the same order.

Frequently asked questions

How is a Manipur electricity bill calculated?

A Manipur electricity bill from MSPDCL is the energy charge (units in telescopic slabs) plus a fixed charge of ₹65 per kW of contracted load for domestic use, plus monthly meter rent. Power factor, ToD, rebates and any late-payment surcharge then adjust it, and each item is rounded to the nearest rupee. The tariff itself does not include taxes or duty.

What is the electricity rate per unit in Manipur in 2026–27?

For LT Domestic the MnERC rates effective 1 May 2026 are ₹5.36 for the first 100 units, ₹6.25 for the next 100 and ₹7.10 above 200 units. LT Commercial pays ₹7.07, ₹7.85 and ₹8.30 by slab, Kutir Jyoti pays ₹2.10, and HT categories pay ₹5.66 to ₹9.90 per kVAh.

What is the electricity bill for 100 units in Manipur?

For a 1 kW home with a single-phase postpaid meter, 100 units cost ₹536 in energy charges, ₹65 fixed charge and ₹10 meter rent, a total of ₹611. A 2 kW home pays ₹65 more because the fixed charge is per kW.

Is the fixed charge in Manipur per kW or a flat amount?

It is per kW. The tariff order says the fixed charge is ₹65 per month per kW of contracted load for domestic, and the bill is contracted load × rate. A 3 kW home pays ₹195 and a 5 kW home pays ₹325 a month, before meter rent. HT consumers pay ₹105 per kVA of billing demand.

What is the Kutir Jyoti tariff in Manipur?

Kutir Jyoti is the lifeline category for very low consumption of up to 45 kWh per 3 months. The order lists ₹25 fixed per month and ₹2.10 per kWh on all units, the same as last year. At 15 units a month that is ₹57 with no meter rent.

Does the Manipur tariff include electricity duty or GST?

No. Clause 12.1.16 of the tariff schedule says the tariff does not include taxes or duties, which are payable on top if any law applies. The calculator therefore shows 0% duty by default. If your bill shows a duty or tax line, enter its rate in Advanced mode.

What is the meter rent in Manipur?

MSPDCL charges ₹10 a month for a single-phase postpaid meter, ₹20 for three phase, ₹50 for a CT-operated meter and ₹500 for a CT and PT operated meter. Prepaid meters are ₹20 (single phase) and ₹40 (three phase), and smart meters are ₹40 and ₹60.

What is the Time-of-Day (ToD) tariff in Manipur?

ToD is an optional Option-2 tariff. From 10 pm to 6 am the normal rate applies, 6–9 am and 5–10 pm are peak hours at 110% (120% for commercial and industrial), and 9 am–5 pm are solar hours at 80% of the normal rate. It starts only after the licensee has the ToD metering and billing system in place.

How do power factor incentive and surcharge work?

If the average monthly power factor is above 95%, you get an incentive of 1% of the energy charge for each point up to unity. Below 90% down to 85% the surcharge is 1% per point, and below 85% it is 2% per point. Below 70% MSPDCL may disconnect supply after a 15-day notice.

How are temporary connections billed in Manipur?

Temporary supply is billed at 1.5 times the fixed or demand charge of the category and 1.5 times the energy rate of its highest slab on all units. A 2 kW domestic temporary connection using 150 units pays ₹1,803 including meter rent.

Is there a rebate for prepaid meters?

Yes. Clause 12.1.1 gives a 1% rebate on the applicable tariff for payment in advance, and it applies only to consumers with prepaid meters. The calculator applies 1% to the energy and fixed charge when you pick the prepaid option.

How much is the late payment surcharge?

A surcharge of 2% per month at simple interest applies on the outstanding principal for the period of delay, counting a part of a month as a full month. Add the months of delay in Advanced mode to see the effect on your bill.

How is the Manipur electricity bill rounded?

Each item, such as the energy charge, fixed charge, meter rent, surcharge and rebate, is rounded to the nearest rupee, with 50 paise and above going up. If small change is short, the consumer may pay the next amount divisible by 10 and the extra is carried forward as credit with no interest.

Which tariff did MnERC approve for FY 2026–27 and from when?

MnERC approved an average tariff hike of 5.05% for FY 2026–27 in its order for MSPDCL, effective 1 May 2026. MSPDCL had asked for 13.83%. The Commission also created new categories for railway traction, EV charging and 33 kV supply.

What are Tariff A and Tariff B in the Manipur tariff order?

Tariff A is the subsidised tariff in force while the State Government pays the subsidy on time. If the subsidy is not received, MSPDCL may bill the full-cost Tariff B, and any excess collected must be refunded later. The order gives only Tariff A rates, so this calculator uses Tariff A.

Is this the same as my official MSPDCL bill?

No, it is an estimate from the tariff rules. Your bill can differ because of meter readings, arrears, tax lines, the meter type, ToD readings and whether MSPDCL is billing at Tariff A.

Explore Electricity Bill Calculators by State & Union Territory

Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.

Electricity Board Wise Calculators