Based on the MnERC Tariff Order for MSPDCL for FY 2026–27 (effective 1 May 2026), Tariff A (subsidised). Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your load and units. The calculator applies the official MnERC FY 2026–27 tariff (effective 1 May 2026): telescopic slabs, fixed charge per kW or kVA, Time-of-Day rates, power factor, meter rent, temporary supply and the rule that every bill item is rounded to the nearest rupee.
Based on the MnERC Tariff Order for MSPDCL for FY 2026–27 (effective 1 May 2026), Tariff A (subsidised). Free, no sign-up. An estimate, not your official bill.
Pick your connection category, then fill in the fields that appear. Each category shows only the inputs its tariff needs.
Homes use LT Domestic. Shops, offices, clinics and EV chargers use LT Commercial. Farm pumps, small workshops and 11 kV and above connections each have their own category. The tariff table below lists every rate.
Enter the contracted load from your bill and the units for the month. HT categories take contract demand in kVA and, if you have it, the recorded maximum demand.
Leave ToD blank for the normal tariff, or enter smart-meter units for morning peak, solar hours and evening peak. Pick your meter type so meter rent is included.
See every line from slab charge to meter rent, the total and a note on rounding. Print, save as PDF or share the result.
It follows the MnERC tariff schedule clause by clause and shows each step of the working.
Covers Kutir Jyoti, domestic, commercial, public lighting, water works, agriculture, irrigation, small industry and every HT category, including the new EV, 33 kV and railway traction classes.
Uses ₹65 per kW for domestic and ₹85 per kW for commercial, as the order says, and ₹105 per kVA of billing demand for HT.
Charges each slab only for the units inside it, with the exact FY 2026–27 rates for the first 100, next 100 and above 200 units.
Applies the published solar-hour and peak rates, the 95% and 90% power-factor rules, and the 1.5× temporary-supply rule.
Adds meter rent by meter type and applies the 1% prepaid rebate and the 5% or 10% supply-voltage rebate or surcharge.
Rounds every bill component to the nearest rupee, as clause 12.1.12 requires, and shows the ₹10 amount you may tender.
MSPDCL, the Manipur State Power Distribution Corporation Limited, bills almost every consumer in the state, and the Manipur Electricity Regulatory Commission (MnERC) sets the tariff. The bill is built from a few parts. The energy charge is your units billed in telescopic slabs. The fixed charge is a per-kW amount on contracted load, or a per-kVA amount on billing demand for HT. Time-of-Day, power factor and rebates adjust the charge, and meter rent is added.
Bill = energy charge + fixed (or demand) charge ± power factor, voltage and prepaid adjustments + meter rent + any duty or late-payment surcharge, each item rounded to the nearest rupee
The tariff is the subsidised Tariff A. It is stated without taxes or duty, which is why the calculator assumes 0% duty until you enter a rate from your own bill.
The table lists every category in the approved schedule, effective 1 May 2026. “LT” energy is in kWh and “HT” energy is in kVAh.
| Category | Supply | Rates and rules |
|---|---|---|
| Kutir Jyoti (lifeline, up to 45 kWh per 3 months) | LT | Kutir Jyoti: ₹25 per month fixed (per connection, not per kW) and ₹2.10 per kWh on all units, for consumption up to 45 kWh per 3 months. |
| LT Domestic | LT | Fixed charge ₹65 per kW of contracted load. Energy is telescopic: ₹5.36 for the first 100 units, ₹6.25 for the next 100 and ₹7.10 above 200 units. |
| LT Non-Domestic / Commercial | LT | Fixed charge ₹85 per kW of contracted load. Energy ₹7.07 for 0–100 units, ₹7.85 for 101–200 and ₹8.30 above 200. |
| LT EV Charging Station | LT | New FY 2026–27 category. Charged at the LT Commercial tariff: ₹85 per kW fixed and ₹7.07 / ₹7.85 / ₹8.30 per kWh by slab. Other facilities at the station (restaurant, shop) are also billed as commercial. |
| LT Public Lighting | LT | Fixed charge ₹70 per kW of contracted load. Energy ₹9.85 per kWh on all units. |
| LT Public Water Works | LT | Fixed charge ₹105 per kW of contracted load. Energy ₹9.95 per kWh on all units. |
| LT Agriculture (individual farmer pump) | LT | Fixed charge ₹65 per kW of contracted load. Energy ₹4.91 per kWh. No ToD tariff for agriculture. |
| LT Irrigation (others) | LT | Fixed charge ₹65 per kW of contracted load. Energy ₹4.91 per kWh. The order says no ToD tariff applies to this category. |
| LT Cottage / Small / Micro Industry (up to 50 kW) | LT | Fixed charge ₹70 per kW of contracted load. Energy ₹6.15 per kWh on all units. |
| HT Commercial | HT | Demand charge ₹105 per kVA of billing demand. Energy ₹9.61 per kVAh on all units. |
| HT consumption at 33 kV (new category) | HT | New FY 2026–27 category. For the first year it pays the HT Commercial tariff: ₹105 per kVA and ₹9.61 per kVAh. |
| HT EV Charging Station (11 kV and above) | HT | New FY 2026–27 category. Charged at the HT Commercial tariff: ₹105 per kVA and ₹9.61 per kVAh. |
| HT Railway Traction (132 / 33 kV, new category) | HT | New FY 2026–27 category. For the first year it pays the HT Commercial tariff: ₹105 per kVA and ₹9.61 per kVAh. |
| HT Public Water Works | HT | Demand charge ₹105 per kVA of billing demand. Energy ₹9.90 per kVAh. |
| HT Agriculture (individual farmer) | HT | Demand charge ₹105 per kVA of billing demand. Energy ₹5.66 per kVAh. No ToD tariff. |
| HT Irrigation (others) | HT | Demand charge ₹105 per kVA of billing demand. Energy ₹5.66 per kVAh. The order says no ToD tariff applies. |
| HT Medium Industry (up to 125 kVA) | HT | Demand charge ₹105 per kVA of billing demand. Energy ₹8.80 per kVAh. For contract demand up to 125 kVA. |
| HT Large Industry (above 125 kVA) | HT | Demand charge ₹105 per kVA of billing demand. Energy ₹9.85 per kVAh. For contract demand above 125 kVA. |
| HT Bulk Supply | HT | Demand charge ₹105 per kVA of billing demand. Energy ₹9.90 per kVAh. Schools, hospitals, offices and campuses with their own distribution. |
MnERC approved an average hike of 5.05%, well below the 13.83% MSPDCL asked for. The table shows fixed charge and energy rate per unit (₹ per kW or kVA, then ₹ per kWh or kVAh).
| Category | FY 2025–26 | FY 2026–27 | Energy rate change |
|---|---|---|---|
| Kutir Jyoti (per connection) | ₹25 · ₹2.10 | ₹25 · ₹2.10 | No change |
| LT Domestic, 0–100 units | ₹65 · ₹5.10 | ₹65 · ₹5.36 | +5.1% |
| LT Domestic, 101–200 units | ₹65 · ₹5.95 | ₹65 · ₹6.25 | +5.0% |
| LT Domestic, above 200 units | ₹65 · ₹6.75 | ₹65 · ₹7.10 | +5.2% |
| LT Commercial, 0–100 units | ₹85 · ₹6.55 | ₹85 · ₹7.07 | +7.9% |
| LT Commercial, 101–200 units | ₹85 · ₹7.25 | ₹85 · ₹7.85 | +8.3% |
| LT Commercial, above 200 units | ₹85 · ₹7.65 | ₹85 · ₹8.30 | +8.5% |
| LT Public Lighting | ₹70 · ₹9.60 | ₹70 · ₹9.85 | +2.6% |
| LT Public Water Works | ₹105 · ₹9.80 | ₹105 · ₹9.95 | +1.5% |
| LT Agriculture / Irrigation | ₹65 · ₹4.55 | ₹65 · ₹4.91 | +7.9% |
| LT Cottage and Small Industry | ₹70 · ₹5.60 | ₹70 · ₹6.15 | +9.8% |
| HT Commercial | ₹105 · ₹8.90 | ₹105 · ₹9.61 | +8.0% |
| HT Public Water Works | ₹105 · ₹9.60 | ₹105 · ₹9.90 | +3.1% |
| HT Agriculture / Irrigation | ₹105 · ₹5.15 | ₹105 · ₹5.66 | +9.9% |
| HT Medium Industry | ₹105 · ₹8.00 | ₹105 · ₹8.80 | +10.0% |
| HT Large Industry | ₹105 · ₹9.10 | ₹105 · ₹9.85 | +8.2% |
| HT Bulk Supply | ₹105 · ₹9.25 | ₹105 · ₹9.90 | +7.0% |
| Units in the month | Rate per unit | Cumulative energy charge at the top of the slab |
|---|---|---|
| 0 – 100 | ₹5.36 | ₹536.00 |
| 101 – 200 | ₹6.25 | ₹1,161.00 |
| 201 and above | ₹7.10 | ₹1,161 + ₹7.10 per extra unit |
The slabs are telescopic. A month of 150 units pays the first 100 units at ₹5.36 and the remaining 50 at ₹6.25, not all 150 at one rate.
| Contracted load | Rate | Monthly fixed charge |
|---|---|---|
| 0.5 kW | ₹65 per kW | ₹32.50 |
| 1 kW | ₹65 per kW | ₹65 |
| 2 kW | ₹65 per kW | ₹130 |
| 3 kW | ₹65 per kW | ₹195 |
| 5 kW | ₹65 per kW | ₹325 |
| 8 kW | ₹65 per kW | ₹520 |
The fixed charge is contracted load × ₹65, payable even if you use no units. A load below 500 W is treated as 0.5 kW, and above that the actual load is used, not rounded.
The table shows a 1 kW and a 3 kW home on a postpaid meter. “Tariff only” is energy plus fixed charge. “With meter rent” adds ₹10 for a single-phase postpaid meter. Duty is not included.
| Units | 1 kW tariff only | 1 kW with meter rent | 3 kW tariff only | 3 kW with meter rent |
|---|---|---|---|---|
| 50 | ₹333 | ₹343 | ₹463 | ₹473 |
| 100 | ₹601 | ₹611 | ₹731 | ₹741 |
| 150 | ₹914 | ₹924 | ₹1,044 | ₹1,054 |
| 200 | ₹1,226 | ₹1,236 | ₹1,356 | ₹1,366 |
| 250 | ₹1,581 | ₹1,591 | ₹1,711 | ₹1,721 |
| 300 | ₹1,936 | ₹1,946 | ₹2,066 | ₹2,076 |
| 400 | ₹2,646 | ₹2,656 | ₹2,776 | ₹2,786 |
| 500 | ₹3,356 | ₹3,366 | ₹3,486 | ₹3,496 |
| 750 | ₹5,131 | ₹5,141 | ₹5,261 | ₹5,271 |
| 1000 | ₹6,906 | ₹6,916 | ₹7,036 | ₹7,046 |
These examples use a 2 kW domestic connection with a single-phase postpaid meter (₹10 rent).
A 2 kW home using 50 units pays 50 units × ₹5.36 = ₹268.00, so the energy charge is ₹268. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹408, about ₹8.16 per unit.
A 2 kW home using 100 units pays 100 units × ₹5.36 = ₹536.00, so the energy charge is ₹536. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹676, about ₹6.76 per unit.
A 2 kW home using 150 units pays 100 units × ₹5.36 = ₹536.00; 50 units × ₹6.25 = ₹312.50, so the energy charge is ₹849. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹989, about ₹6.59 per unit.
A 2 kW home using 200 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00, so the energy charge is ₹1,161. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹1,301, about ₹6.51 per unit.
A 2 kW home using 250 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 50 units × ₹7.10 = ₹355.00, so the energy charge is ₹1,516. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹1,656, about ₹6.62 per unit.
A 2 kW home using 300 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 100 units × ₹7.10 = ₹710.00, so the energy charge is ₹1,871. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹2,011, about ₹6.70 per unit.
A 2 kW home using 400 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 200 units × ₹7.10 = ₹1,420.00, so the energy charge is ₹2,581. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹2,721, about ₹6.80 per unit.
A 2 kW home using 500 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 300 units × ₹7.10 = ₹2,130.00, so the energy charge is ₹3,291. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹3,431, about ₹6.86 per unit.
A 2 kW home using 750 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 550 units × ₹7.10 = ₹3,905.00, so the energy charge is ₹5,066. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹5,206, about ₹6.94 per unit.
A 2 kW home using 1000 units pays 100 units × ₹5.36 = ₹536.00; 100 units × ₹6.25 = ₹625.00; 800 units × ₹7.10 = ₹5,680.00, so the energy charge is ₹6,841. Add the fixed charge of ₹130 (2 kW × ₹65) and ₹10 single-phase meter rent, and the monthly bill is ₹6,981, about ₹6.98 per unit.
LT Commercial pays ₹85 per kW fixed and ₹7.07, ₹7.85 and ₹8.30 per kWh by slab.
| Units | 1 kW tariff only | 1 kW with meter rent | 3 kW tariff only | 3 kW with meter rent |
|---|---|---|---|---|
| 50 | ₹439 | ₹449 | ₹609 | ₹619 |
| 100 | ₹792 | ₹802 | ₹962 | ₹972 |
| 150 | ₹1,185 | ₹1,195 | ₹1,355 | ₹1,365 |
| 200 | ₹1,577 | ₹1,587 | ₹1,747 | ₹1,757 |
| 250 | ₹1,992 | ₹2,002 | ₹2,162 | ₹2,172 |
| 300 | ₹2,407 | ₹2,417 | ₹2,577 | ₹2,587 |
| 400 | ₹3,237 | ₹3,247 | ₹3,407 | ₹3,417 |
| 500 | ₹4,067 | ₹4,077 | ₹4,237 | ₹4,247 |
| 750 | ₹6,142 | ₹6,152 | ₹6,312 | ₹6,322 |
| 1000 | ₹8,217 | ₹8,227 | ₹8,387 | ₹8,397 |
| Line | Working | Amount |
|---|---|---|
| Energy charge | 100 × ₹5.36 + 100 × ₹6.25 + 50 × ₹7.10 | ₹1,516 |
| Fixed charge | 2 kW × ₹65 | ₹130 |
| Meter rent | Single-phase postpaid | ₹10 |
| Total | ₹1,656 |
| Line | Working | Amount |
|---|---|---|
| Energy charge | 100 × ₹7.07 + 100 × ₹7.85 + 400 × ₹8.30 | ₹4,812 |
| Fixed charge | 5 kW × ₹85 | ₹425 |
| Power-factor incentive | 2 points above 95% = 2% of ₹4,812 | −₹96 |
| Meter rent | Single-phase postpaid | ₹10 |
| Total | ₹5,151 |
| Line | Working | Amount |
|---|---|---|
| Energy charge | 40,000 kVAh × ₹9.85 | ₹3,94,000 |
| Demand charge | 210 kVA billing demand × ₹105 (higher of contract and recorded) | ₹22,050 |
| Power-factor incentive | 1 point above 95% = 1% of energy charge | −₹3,940 |
| Meter rent | CT and PT operated | ₹500 |
| Total | ₹4,12,610 |
Kutir Jyoti connections pay ₹25 a month and ₹2.10 per kWh on every unit, for use up to 45 kWh per 3 months. The Commission kept this tariff unchanged for FY 2026–27 and noted that it gives special treatment to Kutir Jyoti and agriculture. At 15 units a month the energy charge is ₹32 (₹31.50 rounded) and the total is ₹57.
MnERC replaced the old 4 am–6 am and 10 am–4 pm blocks with a solar-hours structure for FY 2026–27.
| Period | Time | Rate |
|---|---|---|
| Normal | 10 pm – 6 am | 100% of the normal rate |
| Morning peak | 6 am – 9 am | 110% (120% for commercial and industrial) |
| Solar hours | 9 am – 5 pm | 80% of the normal rate |
| Evening peak | 5 pm – 10 pm | 110% (120% for commercial and industrial) |
| Category | Normal rate | Peak rate (6–9 am, 5–10 pm) | Solar-hour rate (9 am–5 pm) |
|---|---|---|---|
| LT Domestic | ₹5.36 / 6.25 / 7.10 | 110% (₹5.89 / 6.87 / 7.81) | 80% (₹4.28 / 5.00 / 5.68) |
| LT Commercial and EV charging | ₹7.07 / 7.85 / 8.30 | 120% (₹8.49 / 9.42 / 9.96) | 80% (₹5.66 / 6.28 / 6.64) |
| LT Public Lighting | ₹9.85 | 110% (₹10.84) | 80% (₹7.88) |
| LT Public Water Works | ₹9.95 | 110% (₹10.95) | 80% (₹7.96) |
| LT Small Industry | ₹6.15 | 120% (₹7.38) | 80% (₹4.92) |
| HT Commercial (and 33 kV, EV, railway) | ₹9.61 | 120% (₹11.53) | 80% (₹7.69) |
| HT Public Water Works | ₹9.90 | 110% (₹10.89) | 80% (₹7.92) |
| HT Medium Industry | ₹8.80 | 120% (₹10.56) | 80% (₹7.04) |
| HT Large Industry | ₹9.85 | 120% (₹11.82) | 80% (₹7.88) |
| HT Bulk Supply | ₹9.90 | 110% (₹10.89) | 80% (₹7.92) |
ToD is Option-2. The fixed charge stays the same, and agriculture and irrigation have no ToD tariff. The order allows consumers to take ToD only once MSPDCL has the metering, data and billing systems ready. The example below shows a 3 kW home using 300 units, 60 in the morning peak, 120 in solar hours and 60 in the evening peak: ToD gives ₹2,000 against ₹2,076 on the normal tariff.
| Average monthly power factor | Effect on the energy charge |
|---|---|
| Above 95% up to unity | Incentive of 1% for each point above 95% (up to 5%) |
| 90% to 95% | No incentive or surcharge |
| 89% down to 85% | Surcharge of 1% for each point below 90% |
| Below 85% | Surcharge of 2% for each point below 85%, on top of the 5% above |
| Below 70% | The utility may disconnect after a 15-day notice |
Power factor is kWh divided by kVAh for the month, rounded to two decimals, with the third decimal of 5 or more rounding up. A new consumer under 90% in the first 6 months can have the surcharge withdrawn after 3 months at 90% or more.
Temporary supply is billed at 1.5 times the fixed or demand charge of the category and 1.5 times the energy rate of the highest slab on all units. For a 2 kW domestic connection that is ₹97.50 per kW-month × 2 plus ₹10.65 per unit.
| Meter | Rent per month |
|---|---|
| AC single phase, whole current, postpaid | ₹10 |
| AC three phase, whole current, postpaid | ₹20 |
| AC three phase, CT operated, postpaid | ₹50 |
| AC three phase, CT and PT operated, postpaid | ₹500 |
| Single phase prepaid | ₹20 |
| Three phase prepaid | ₹40 |
| Single phase smart meter | ₹40 |
| Three phase smart meter | ₹60 |
| Item | Rule |
|---|---|
| Prepaid advance payment | 1% rebate on the applicable tariff for consumers with prepaid meters |
| HV/EHV supply, load up to 50 kW | 5% rebate on both energy and fixed charge |
| Supply below base voltage, load above 50 kW | 10% extra on the energy plus fixed charge |
| Late payment | 2% per month, simple interest on the outstanding principal, for each month or part |
| Rounding | Each bill item rounded to the nearest rupee; ₹10 tender allowed, with the extra carried forward |
| Mixed use | A home used partly for business is billed in full at the higher-rate category |
| Single point supply | Supply at other points is a separate connection with its own bill |
The tariff stays below the cost of serving consumers. MSPDCL reported an average cost of supply of ₹12.46 per kWh against an average realisation of ₹8.50 per kWh even after subsidy, and the State Government committed ₹360 crore of subsidy for FY 2026–27.
| Supply voltage | Power purchase cost (₹/unit) | Network cost (₹/unit) | Cost of supply (₹/unit) |
|---|---|---|---|
| 33 kV | 8.10 | 1.45 | 9.55 |
| 11 kV | 8.51 | 1.53 | 10.04 |
| 400 V (LT) | 11.01 | 1.98 | 12.99 |
The order gives only the subsidised Tariff A. If MSPDCL ever bills the full-cost Tariff B because subsidy is not paid, this calculator cannot reproduce it.
The tariff excludes taxes and duty, so duty defaults to 0%. Enter the rate from your bill in Advanced mode if you have one.
The calculator adds ₹10 for a single-phase postpaid meter on LT and ₹500 for a CT and PT meter on HT. Change the meter type to match your bill.
The order does not say how slabs combine with ToD. The calculator spreads each slab’s units across the time periods in proportion to your ToD readings.
The 1% advance-payment rebate is applied to the energy plus fixed charge. Your bill may apply it to the energy charge only.
Arrears, transformer-loss addition for LT-metered HT supply, theft assessment, one-time connection charges and pole-usage charges are not included.
The rate rises from ₹5.36 to ₹6.25 after 100 units and to ₹7.10 after 200, so trimming use near a slab edge saves the most.
Fixed charge is ₹65 for every kW you have contracted, so a larger load costs more every month even if you use no units.
On ToD, 9 am–5 pm units cost 80% of the normal rate, while morning and evening peaks cost 10% to 20% more.
Keep the average above 0.90 to avoid the surcharge, and above 0.95 to earn a 1% incentive per point.
Prepaid consumers get a 1% rebate for advance payment, and you can watch usage day by day.
Temporary supply costs 1.5 times the fixed charge and the highest-slab rate on every unit, so apply for a permanent connection if you can.
The Manipur State Power Distribution Corporation Limited (MSPDCL) supplies and bills consumers across Manipur. The Manipur Electricity Regulatory Commission (MnERC), which became functional on 23 July 2024, determines the tariff.
Manipur Electricity Regulatory Commission, Tariff Order for MSPDCL for FY 2026–27 (Chapters 8, 9, 10 and 12, Tariff Schedule), effective 1 May 2026. Rebates, surcharges and meter rent come from the General Conditions of Supply and Miscellaneous Charges in the same order.
A Manipur electricity bill from MSPDCL is the energy charge (units in telescopic slabs) plus a fixed charge of ₹65 per kW of contracted load for domestic use, plus monthly meter rent. Power factor, ToD, rebates and any late-payment surcharge then adjust it, and each item is rounded to the nearest rupee. The tariff itself does not include taxes or duty.
For LT Domestic the MnERC rates effective 1 May 2026 are ₹5.36 for the first 100 units, ₹6.25 for the next 100 and ₹7.10 above 200 units. LT Commercial pays ₹7.07, ₹7.85 and ₹8.30 by slab, Kutir Jyoti pays ₹2.10, and HT categories pay ₹5.66 to ₹9.90 per kVAh.
For a 1 kW home with a single-phase postpaid meter, 100 units cost ₹536 in energy charges, ₹65 fixed charge and ₹10 meter rent, a total of ₹611. A 2 kW home pays ₹65 more because the fixed charge is per kW.
It is per kW. The tariff order says the fixed charge is ₹65 per month per kW of contracted load for domestic, and the bill is contracted load × rate. A 3 kW home pays ₹195 and a 5 kW home pays ₹325 a month, before meter rent. HT consumers pay ₹105 per kVA of billing demand.
Kutir Jyoti is the lifeline category for very low consumption of up to 45 kWh per 3 months. The order lists ₹25 fixed per month and ₹2.10 per kWh on all units, the same as last year. At 15 units a month that is ₹57 with no meter rent.
No. Clause 12.1.16 of the tariff schedule says the tariff does not include taxes or duties, which are payable on top if any law applies. The calculator therefore shows 0% duty by default. If your bill shows a duty or tax line, enter its rate in Advanced mode.
MSPDCL charges ₹10 a month for a single-phase postpaid meter, ₹20 for three phase, ₹50 for a CT-operated meter and ₹500 for a CT and PT operated meter. Prepaid meters are ₹20 (single phase) and ₹40 (three phase), and smart meters are ₹40 and ₹60.
ToD is an optional Option-2 tariff. From 10 pm to 6 am the normal rate applies, 6–9 am and 5–10 pm are peak hours at 110% (120% for commercial and industrial), and 9 am–5 pm are solar hours at 80% of the normal rate. It starts only after the licensee has the ToD metering and billing system in place.
If the average monthly power factor is above 95%, you get an incentive of 1% of the energy charge for each point up to unity. Below 90% down to 85% the surcharge is 1% per point, and below 85% it is 2% per point. Below 70% MSPDCL may disconnect supply after a 15-day notice.
Temporary supply is billed at 1.5 times the fixed or demand charge of the category and 1.5 times the energy rate of its highest slab on all units. A 2 kW domestic temporary connection using 150 units pays ₹1,803 including meter rent.
Yes. Clause 12.1.1 gives a 1% rebate on the applicable tariff for payment in advance, and it applies only to consumers with prepaid meters. The calculator applies 1% to the energy and fixed charge when you pick the prepaid option.
A surcharge of 2% per month at simple interest applies on the outstanding principal for the period of delay, counting a part of a month as a full month. Add the months of delay in Advanced mode to see the effect on your bill.
Each item, such as the energy charge, fixed charge, meter rent, surcharge and rebate, is rounded to the nearest rupee, with 50 paise and above going up. If small change is short, the consumer may pay the next amount divisible by 10 and the extra is carried forward as credit with no interest.
MnERC approved an average tariff hike of 5.05% for FY 2026–27 in its order for MSPDCL, effective 1 May 2026. MSPDCL had asked for 13.83%. The Commission also created new categories for railway traction, EV charging and 33 kV supply.
Tariff A is the subsidised tariff in force while the State Government pays the subsidy on time. If the subsidy is not received, MSPDCL may bill the full-cost Tariff B, and any excess collected must be refunded later. The order gives only Tariff A rates, so this calculator uses Tariff A.
No, it is an estimate from the tariff rules. Your bill can differ because of meter readings, arrears, tax lines, the meter type, ToD readings and whether MSPDCL is billing at Tariff A.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.