- Regular domestic (LTDS-II) rates for 2026-27 are ₹2.90, ₹4.20, ₹6.20, ₹7.70 and ₹7.90 per unit, with ₹35 per kW fixed.
- A 10% regulatory surcharge is added on energy plus fixed charges. For 200 units and 2 kW the bill is ₹858.00, not just the ₹780 of energy and fixed.
- From 1 April 2027 the first 100 units rise to ₹3.10 (LTDS-II). The order already approves it.
Most Puducherry bill calculators stop at energy and fixed charge, or add duty and fuel charges that do not appear on a real PED bill. This one follows the JERC tariff order and a recent PED bill, so the lines match what you see on paper.
It covers regular domestic, Lifeline (BPL), domestic with a shop or common services, and commercial connections, and handles both monthly and bi-monthly cycles. It is free and needs no login.
In this guide
- Puducherry electricity bill calculator
- Budget planner: how many units can I use?
- Estimate your units from appliances
- Puducherry electricity tariff 2026-27
- The 10% regulatory surcharge
- How to calculate your bill by hand
- Monthly bill ladder
- Monthly and bi-monthly billing
- Lifeline (BPL) rules
- What changes from April 2027
- How to lower your bill
- Why other calculators show a different bill
- Frequently asked questions
- Sources and how we checked this
Budget planner: how many units can I use?
Enter the most you want to pay for a bill. It uses the connection, load and cycle you set above.
Estimate your units from appliances
Set how many of each appliance you run and for how many hours a day. The table adds up a 30-day total. Wattages are typical, so check your appliance label.
| Appliance | Watts | Qty | Hours/day | Units (30 days) |
|---|
Puducherry electricity tariff 2026-27
JERC approved the tariff for the Electricity Department, Puducherry (PED) in its order dated 24 September 2025. Table 9-2 of that order is the schedule for 2026-27. Domestic slabs are telescopic: each rate applies only to the units inside its slab.
Regular domestic (LTDS-II)
| Monthly units | Energy rate |
|---|---|
| 0 to 100 | ₹2.90 |
| 101 to 200 | ₹4.20 |
| 201 to 300 | ₹6.20 |
| 301 to 400 | ₹7.70 |
| Above 400 | ₹7.90 |
Fixed charge: ₹35 per kW or part thereof per month.
Lifeline (LTDS-I) and domestic with shop or common services (LTDS-III)
| Monthly units | LTDS-I Lifeline | LTDS-III |
|---|---|---|
| 0 to 100 | ₹2.65 (all units) | ₹2.95 |
| 101 to 200 | - | ₹4.25 |
| 201 to 300 | - | ₹6.25 |
| 301 to 400 | - | ₹7.75 |
| Above 400 | - | ₹7.95 |
| Fixed charge | ₹10 per connection | ₹35 per kW |
Commercial (NDS-I)
| Monthly units (kVAh) | Energy rate |
|---|---|
| 0 to 100 | ₹6.25 |
| 101 to 200 | ₹7.30 |
| Above 200 | ₹8.05 |
Fixed charge: ₹200 per kVA or part thereof per month.
The tariff is exclusive of electricity duty and taxes. FPPCA is charged extra if applicable. The 10% regulatory surcharge is added on energy and fixed charges.
The 10% regulatory surcharge
JERC levies a 10% regulatory surcharge to recover past revenue gaps of the department. The order sets these terms:
- It applies to all consumer categories.
- It is charged on the total energy and demand (fixed) charges in the bill.
- It applies to bills raised on or after 1 October 2025 and continues until further orders.
A recent PED bill confirms this: energy ₹1,280 plus fixed ₹149 gave a regulatory surcharge of ₹143, which is 10% of ₹1,429. A calculator without this line shows a bill about 9% too low.
For 200 units and 2 kW the energy and fixed charge add up to ₹780. The surcharge adds ₹78, so the bill is ₹858.00.
How to calculate your Puducherry bill by hand
- Energy charge. Multiply the units in each slab by that slab's rate and add them up.
- Fixed charge. ₹35 for each kW of sanctioned load, rounded up to a whole kW.
- Regulatory surcharge. 10% of energy plus fixed charge.
- Extras. Add FPPCA, duty or meter rent only if your bill shows them.
Example 1: 200 units, 2 kW, domestic (LTDS-II).
- First 100 units × ₹2.90 = ₹290.00
- Next 100 units × ₹4.20 = ₹420.00
- Energy = ₹710.00, Fixed = 2 kW × ₹35 = ₹70.00
- Surcharge = 10% × ₹780 = ₹78.00
- Total: ₹858.00
Example 2: 300 units, 3 kW, domestic (LTDS-II).
- ₹290.00 + ₹420.00 + 100 units × ₹6.20 = ₹620.00, so energy = ₹1,330.00
- Fixed = 3 kW × ₹35 = ₹105.00
- Surcharge = 10% × ₹1,435 = ₹143.50, rounded to ₹144.00
- Total: ₹1,579.00
Monthly bill ladder: 50 to 600 units
A quick lookup for a regular domestic home (LTDS-II) with a 2 kW load, including the 10% surcharge.
| Units | Energy | Fixed | Surcharge | Total bill | Per unit |
|---|---|---|---|---|---|
| 50 | ₹145.00 | ₹70.00 | ₹22.00 | ₹237.00 | ₹4.74 |
| 100 | ₹290.00 | ₹70.00 | ₹36.00 | ₹396.00 | ₹3.96 |
| 150 | ₹500.00 | ₹70.00 | ₹57.00 | ₹627.00 | ₹4.18 |
| 200 | ₹710.00 | ₹70.00 | ₹78.00 | ₹858.00 | ₹4.29 |
| 250 | ₹1,020.00 | ₹70.00 | ₹109.00 | ₹1,199.00 | ₹4.80 |
| 300 | ₹1,330.00 | ₹70.00 | ₹140.00 | ₹1,540.00 | ₹5.13 |
| 350 | ₹1,715.00 | ₹70.00 | ₹179.00 | ₹1,964.00 | ₹5.61 |
| 400 | ₹2,100.00 | ₹70.00 | ₹217.00 | ₹2,387.00 | ₹5.97 |
| 500 | ₹2,890.00 | ₹70.00 | ₹296.00 | ₹3,256.00 | ₹6.51 |
| 600 | ₹3,680.00 | ₹70.00 | ₹375.00 | ₹4,125.00 | ₹6.88 |
Monthly and bi-monthly billing
PED bills are issued every month. The JERC order says that when bi-monthly billing is carried out, fixed charges double and the slabs double (0 to 200, 201 to 400 and so on). Pick Bi-Monthly in the calculator and enter the units for two months.
- Never apply the monthly slabs to two months of units. That pushes units into higher slabs and overstates the bill.
- Fixed charge for a 2 kW load: ₹70 monthly, ₹140 for a two-month bill.
Lifeline (BPL) rules
LTDS-I is for dwelling houses below the poverty line with a connected load of up to 250 watts and consumption of up to 100 units a month. The rate is ₹2.65 for every unit, plus ₹10 per connection. If the load or consumption is higher, the bill for that period is charged at regular domestic rates and demand charges. The calculator applies this rule for you.
What changes from April 2027
The same JERC order approves the 2027-28 schedule in Table 9-3. The changes affect only the lowest slabs:
| Category | 2026-27 | From 1 April 2027 |
|---|---|---|
| LTDS-I Lifeline, all units | ₹2.65 | ₹3.00 |
| LTDS-II, first 100 units | ₹2.90 | ₹3.10 |
| LTDS-III, first 100 units | ₹2.95 | ₹3.20 |
All other domestic slabs stay the same. The regulatory surcharge is set until further orders, so check JERC notices for any change.
How to lower your Puducherry electricity bill
Stay under 200 unitsThe slabs jump from ₹4.20 to ₹6.20 after 200 units, and from ₹6.20 to ₹7.70 after 300 units.
Match your sanctioned loadFixed charge is ₹35 for every kW or part of a kW. An over-declared load costs you every month.
Use the AC wiselySet a split AC near 24 to 26 °C. It is often the biggest load in the coastal summer.
Switch to LED and BLDC fansA 28 W BLDC fan uses far less than a 75 W fan running all day.
Check the fridgeKeep door seals tight and coils clean. A fridge runs all day, so small losses add up.
Read the meter mid-monthNote the reading about 15 days in and use the calculator to see which slab you are heading for.
Why other calculators show a different bill
- No regulatory surcharge. Leaving out the 10% line makes the bill about 9% too low.
- Added duty and fuel charge. A recent PED bill shows no duty line and FPPCA at ₹0. Adding 5% duty and ₹0.25 per unit fuel charge by default overstates the bill.
- Wrong fixed charge unit. Domestic fixed charge is ₹35 per kW. Commercial is ₹200 per kVA, not per kW.
- Missing categories. Lifeline (LTDS-I) and LTDS-III have their own rates and rules.
- Bi-monthly done wrong. The order doubles both the slabs and the fixed charge for a two-month bill.
What this calculator covers
- Covers: LTDS-I, LTDS-II, LTDS-III and commercial NDS-I, monthly and bi-monthly, the 10% surcharge, and editable FPPCA, duty, meter rent and subsidy.
- Does not cover: agricultural, industrial, public utility and high-tension connections.
Frequently asked questions
What is the electricity rate per unit in Puducherry in 2026-27?
For regular domestic connections (LTDS-II) the rate is ₹2.90 for the first 100 units, ₹4.20 for 101 to 200, ₹6.20 for 201 to 300, ₹7.70 for 301 to 400 and ₹7.90 above 400 units a month. Fixed charge is ₹35 per kW, and a 10% regulatory surcharge is added on energy plus fixed charges.
What is the 10% regulatory surcharge on the Puducherry bill?
JERC levies a 10% regulatory surcharge on the total energy and demand (fixed) charges for all consumer categories. It applies to bills raised on or after 1 October 2025 and continues until further orders. It is a separate line on your PED bill.
Is electricity duty or FPPCA added to the Puducherry bill?
A recent PED bill shows FPPCA at ₹0 and no separate electricity duty line, so both default to zero in this calculator. The tariff order says duty and taxes are extra if the government levies them, so both are editable if your bill shows them.
Is the Puducherry bill monthly or bi-monthly?
PED bills are issued monthly. The JERC order says that when bi-monthly billing is carried out, the fixed charge and the slabs are doubled. The billing cycle option in the calculator applies this rule.
How is the fixed charge calculated?
Regular domestic consumers pay ₹35 per kW or part thereof per month. A 2.5 kW load is charged as 3 kW, so the fixed charge is ₹105. Lifeline consumers pay ₹10 per connection. Commercial (NDS-I) consumers pay ₹200 per kVA or part thereof.
Who gets the Lifeline (LTDS-I) rate?
LTDS-I is for dwelling houses below the poverty line with a connected load of up to 250 watts and consumption of up to 100 units a month. The rate is ₹2.65 for all units, with ₹10 fixed per connection. If the load or consumption is over the limit, the bill for that period is charged at the regular domestic rates.
What is LTDS-III in Puducherry?
LTDS-III is for homes where part of the premises is used for a small shop, clinic, office or homestay, and for common facilities in mixed apartment buildings. The slab rates are 5 paise higher than LTDS-II in every slab.
Will the Puducherry tariff change from April 2027?
Yes. The JERC order already approves the 2027-28 schedule. The first 100 units of LTDS-II rise from ₹2.90 to ₹3.10, LTDS-III from ₹2.95 to ₹3.20, and Lifeline from ₹2.65 to ₹3.00. Other slabs stay the same.
Does this calculator cover commercial connections?
Yes, for commercial (NDS-I). The rates are ₹6.25, ₹7.30 and ₹8.05 per unit for 0 to 100, 101 to 200 and above 200 units, with ₹200 per kVA fixed. Commercial energy is billed in kVAh, so use the kVAh figure from your bill. We apply the slabs the same way as domestic, so compare the result with your bill.
Why is my actual bill different from this estimate?
Your bill can include arrears, late payment surcharge, subsidies, a different sanctioned load, or charges added after this page was checked. PED also rounds each line to the nearest rupee. Match each line with the breakdown here and use Edit Slabs & Surcharges to adjust.
Sources and how we checked this
How we checked these numbers
All rates and fixed charges are from Table 9-2 of the JERC tariff order for PED dated 24 September 2025 (Petition No. 139 of 2025), and the 10% surcharge terms, the bi-monthly rule, Lifeline eligibility and the 2027-28 rates are from the same order. We also compared the energy, fixed and surcharge lines with a sample PED bill for February 2026, where 292 units gave an energy charge of ₹1,280 and a surcharge of 10% on energy plus fixed. We tested every example on this page with the same code the calculator runs. If you spot an error, contact us.
- JERC: Tariff Order for PED, FY 2025-26 to FY 2029-30 (24 September 2025), Table 9-2 and Table 9-3
- Electricity Department, Puducherry: Official tariff orders
- Electricity Department, Puducherry: Sample PED bill, February 2026
- JERC: Official website
Disclaimer. Kalikolom is an independent site and is not affiliated with JERC, the Electricity Department of Puducherry or the Government of Puducherry. This is an estimate for information only. Tariffs and surcharges can change, so check your official bill for the amount payable.