Based on the SSERC Tariff Order, Case No. P-01/PDS/2026, for the Power Department, Government of Sikkim, FY 2026–27. Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your units. The calculator follows the SSERC tariff order for FY 2026–27, with five domestic slabs, the monthly minimum charge, meter rent, the prepaid meter rebate and HT Time-of-Day billing.
Based on the SSERC Tariff Order, Case No. P-01/PDS/2026, for the Power Department, Government of Sikkim, FY 2026–27. Free, no sign-up. An estimate, not your official bill.
Pick your connection category, then fill in the fields that appear.
Pick Domestic (DS) for a home, Commercial (CS) for a shop, or the industrial, bulk or public lighting category on your bill.
Type the units for the month and choose single or three phase. Commercial, industrial and bulk connections also need the sanctioned load in kVA.
Choose postpaid, prepaid or smart prepaid so the meter rent and rebate are right.
See every slab and line, then print, save as PDF or share the result. Use Advanced for readings, budget and bill items.
It applies the SSERC tariff schedule category by category and shows each step of the working.
Domestic, commercial, LT industrial, HT industrial, bulk supply, public lighting and the army pensioner, blind and place-of-worship schemes.
Shows each block of units at its own rate, so you can see exactly where the money goes.
Tops the bill up to ₹100, ₹200, ₹300 or ₹500 only when the energy charge falls below it, as the order describes.
Adds the ₹40 or ₹80 meter rent from the order, or the 1% prepaid rebate and ₹17 vending charge.
Applies the contract-demand tier, excess demand at twice the rate, the 4% LT-side loss and peak and off-peak units.
Duty, fuel adjustment and the annual surcharge are not in the schedule, so they are optional inputs and not guessed.
The Power Department, Government of Sikkim, supplies and bills electricity in the state. Your bill is the energy charge by slab, topped up to the monthly minimum charge if it is lower, plus meter rent and any items from your own bill.
Bill = energy charge by slab (at least the monthly minimum) + meter rent − prepaid rebate + duty, fuel adjustment and other items from your bill
The Sikkim State Electricity Regulatory Commission (SSERC) approves the tariff. Its order in Case No. P-01/PDS/2026, dated 30 June 2026, sets the FY 2026–27 rates and says the order comes into force on 1 July 2026.
| Domestic (DS) slab | Rate per unit |
|---|---|
| Up to 50 units | ₹2.40 |
| 51 to 100 units | ₹3.40 |
| 101 to 200 units | ₹4.40 |
| 201 to 400 units | ₹4.90 |
| 401 units and above | ₹5.40 |
| Monthly minimum charge | ₹100 single phase, ₹200 three phase |
Domestic supply covers private houses, residential flats, government residential buildings, government schools and rural homestays. If a domestic connection is used for commercial purposes, the whole supply is charged at commercial rates.
| Commercial (CS) slab | Rate per unit |
|---|---|
| Up to 50 units | ₹5.05 |
| 51 to 100 units | ₹6.05 |
| 101 to 200 units | ₹7.05 |
| 201 to 400 units | ₹8.05 |
| 401 units and above | ₹8.35 |
| Monthly minimum, below 25 kVA | ₹300 single phase, ₹500 three phase |
| Demand charge, 25 kVA and above on a shared transformer | ₹60 per kVA (rural), ₹100 per kVA (urban) |
| Category | Energy charge | Demand or minimum charge |
|---|---|---|
| LTIS, up to 500 kVAh | ₹6.91 | Minimum ₹500 up to 50 kVA; ₹200 per kVA above 50 kVA |
| LTIS, 501 to 1000 kVAh | ₹7.91 | Shared transformer, 25 to 100 kVA: ₹100 per kVA extra |
| LTIS, 1001 kVAh and above | ₹8.91 | As above |
| HTIS, contract demand up to 250 kVA | ₹7.86 per kVAh | ₹250 per kVA per month |
| HTIS, above 250 to 500 kVA | ₹8.36 per kVAh | ₹290 per kVA per month |
| HTIS, above 500 kVA | ₹8.86 per kVAh | ₹560 per kVA per month |
| Bulk supply (all voltages) | ₹7.95 per kWh | Minimum ₹500 up to 50 kVA; ₹150 per kVA above 50 kVA |
| Public lighting | ₹7.46 per kWh | None |
Domestic energy charges rise by ₹0.80 per unit in every slab, and commercial charges by ₹0.95. The annual surcharge falls from 10% to 5%. Demand charges and the HT Time-of-Day adjustments are unchanged.
| Category and slab | FY 2025–26 rate | FY 2026–27 rate | Change |
|---|---|---|---|
| Domestic, up to 50 units | ₹1.60 | ₹2.40 | +₹0.80 |
| Domestic, 51 to 100 units | ₹2.60 | ₹3.40 | +₹0.80 |
| Domestic, 101 to 200 units | ₹3.60 | ₹4.40 | +₹0.80 |
| Domestic, 201 to 400 units | ₹4.10 | ₹4.90 | +₹0.80 |
| Domestic, 401 units and above | ₹4.60 | ₹5.40 | +₹0.80 |
| Commercial, up to 50 units | ₹4.10 | ₹5.05 | +₹0.95 |
| Commercial, 51 to 100 units | ₹5.10 | ₹6.05 | +₹0.95 |
| Commercial, 101 to 200 units | ₹6.10 | ₹7.05 | +₹0.95 |
| Commercial, 201 to 400 units | ₹7.10 | ₹8.05 | +₹0.95 |
| Commercial, 401 units and above | ₹7.40 | ₹8.35 | +₹0.95 |
| Bulk supply (LT and HT) | ₹6.50 | ₹7.95 | +₹1.45 |
| Public lighting, rural | ₹5.00 | ₹7.46 | +₹2.46 |
| Public lighting, urban | ₹6.00 | ₹7.46 | +₹1.46 |
| LTIS, up to 500 units (urban) | ₹6.30 | ₹6.91 | +₹0.61 |
| LTIS, 501 to 1000 units (urban) | ₹7.20 | ₹7.91 | +₹0.71 |
| LTIS, 1001 units and above (urban) | ₹8.15 | ₹8.91 | +₹0.76 |
| HT industrial, up to 250 kVA | ₹6.90 | ₹7.86 | +₹0.96 |
| HT industrial, 250 to 500 kVA | ₹7.40 | ₹8.36 | +₹0.96 |
| HT industrial, above 500 kVA | ₹7.90 | ₹8.86 | +₹0.96 |
Bills without duty or fuel adjustment. The domestic columns assume a single-phase connection. The commercial column assumes a 10 kVA single-phase connection with no meter rent.
| Units | Domestic, no meter rent | Domestic with ₹40 meter rent | Commercial (10 kVA) |
|---|---|---|---|
| 30 | ₹100.00 | ₹140.00 | ₹300.00 |
| 50 | ₹120.00 | ₹160.00 | ₹300.00 |
| 100 | ₹290.00 | ₹330.00 | ₹555.00 |
| 150 | ₹510.00 | ₹550.00 | ₹907.50 |
| 200 | ₹730.00 | ₹770.00 | ₹1,260.00 |
| 250 | ₹975.00 | ₹1,015.00 | ₹1,662.50 |
| 300 | ₹1,220.00 | ₹1,260.00 | ₹2,065.00 |
| 400 | ₹1,710.00 | ₹1,750.00 | ₹2,870.00 |
| 500 | ₹2,250.00 | ₹2,290.00 | ₹3,705.00 |
| 750 | ₹3,600.00 | ₹3,640.00 | ₹5,792.50 |
| 1000 | ₹4,950.00 | ₹4,990.00 | ₹7,880.00 |
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 50 units | 50 | 2.40 | ₹120.00 |
| 51 to 100 units | 50 | 3.40 | ₹170.00 |
| Line | Amount |
|---|---|
| Energy charge (100 kWh) | ₹290.00 |
| Meter rent (postpaid single-phase meter) | ₹40.00 |
| Total payable | ₹330.00 |
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 50 units | 50 | 2.40 | ₹120.00 |
| 51 to 100 units | 50 | 3.40 | ₹170.00 |
| 101 to 200 units | 100 | 4.40 | ₹440.00 |
| 201 to 400 units | 50 | 4.90 | ₹245.00 |
| Line | Amount |
|---|---|
| Energy charge (250 kWh) | ₹975.00 |
| Meter rent (postpaid single-phase meter) | ₹40.00 |
| Total payable | ₹1,015.00 |
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 50 units | 20 | 2.40 | ₹48.00 |
| Line | Amount |
|---|---|
| Energy charge (20 kWh) | ₹48.00 |
| Top-up to monthly minimum charge (₹100) | ₹52.00 |
| Meter rent (postpaid single-phase meter) | ₹40.00 |
| Total payable | ₹140.00 |
The 20 units cost ₹48.00, which is below the ₹100 minimum, so the bill is topped up to ₹100 and the ₹40 meter rent is added.
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 50 units | 50 | 2.40 | ₹120.00 |
| 51 to 100 units | 50 | 3.40 | ₹170.00 |
| 101 to 200 units | 100 | 4.40 | ₹440.00 |
| 201 to 400 units | 100 | 4.90 | ₹490.00 |
| Line | Amount |
|---|---|
| Energy charge (300 kWh) | ₹1,220.00 |
| Meter rent (postpaid three-phase meter) | ₹80.00 |
| Total payable | ₹1,300.00 |
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 50 units | 50 | 5.05 | ₹252.50 |
| 51 to 100 units | 50 | 6.05 | ₹302.50 |
| 101 to 200 units | 100 | 7.05 | ₹705.00 |
| Line | Amount |
|---|---|
| Energy charge (200 kWh) | ₹1,260.00 |
| Meter rent (postpaid single-phase meter) | ₹40.00 |
| Total payable | ₹1,300.00 |
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 50 units | 50 | 2.40 | ₹120.00 |
| 51 to 100 units | 50 | 3.40 | ₹170.00 |
| 101 to 200 units | 50 | 4.40 | ₹220.00 |
| Line | Amount |
|---|---|
| Energy charge (150 kWh) | ₹510.00 |
| Prepaid vending charge | ₹17.00 |
| Prepaid meter rebate (1% of energy charge) | −₹5.10 |
| Total payable | ₹521.90 |
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| First 500 units | 500 | 6.91 | ₹3,455.00 |
| 501 to 1000 units | 500 | 7.91 | ₹3,955.00 |
| Above 1000 units | 500 | 8.91 | ₹4,455.00 |
| Line | Amount |
|---|---|
| Energy charge (1,500 kVAh) | ₹11,865.00 |
| Meter rent (postpaid three-phase meter) | ₹80.00 |
| Total payable | ₹11,945.00 |
500 kVAh at morning peak, 1,000 kVAh at evening peak and 800 kVAh at off-peak.
| Slab | Units | Rate (₹) | Amount |
|---|---|---|---|
| Normal hours | 7700 | 8.36 | ₹64,372.00 |
| Morning peak 05:00–08:00 (+₹1.00) | 500 | 9.36 | ₹4,680.00 |
| Evening peak 17:00–20:00 (+₹1.00) | 1000 | 9.36 | ₹9,360.00 |
| Off-peak 00:00–05:00 (−₹0.40) | 800 | 7.96 | ₹6,368.00 |
| Line | Amount |
|---|---|
| Energy charge (10,000 kVAh) | ₹84,780.00 |
| Demand charge (₹290 × 300 kVA) | ₹87,000.00 |
| Total payable | ₹1,71,780.00 |
The order defines the minimum charge as a fixed minimum billing amount that applies even when consumption is low or zero. It is a floor, not an extra fee. For a single-phase home the energy charge passes ₹100 at about 42 units, so for most households the minimum never shows up in the bill.
A postpaid energy meter carries rent of ₹40 (single phase) or ₹80 (three phase) a month. Consumers with a prepaid meter pay no meter rent and get a 1% rebate on the energy charge. Prepaid meters carry a ₹17 vending charge per month, which does not apply to smart meters. The order lists no timely-payment rebate, so the calculator does not assume one.
| Charge | Amount |
|---|---|
| Meter rent, single-phase energy meter | ₹40 per month |
| Meter rent, three-phase energy meter | ₹80 per month |
| Maximum demand indicator rent | ₹200 per month |
| Time switch rent | ₹150 per month |
| Prepaid vending charge (not smart meters) | ₹17 per meter per month |
| Disconnection and reconnection, DS and CS | ₹150 |
| Disconnection and reconnection, LTIS, HTS and BS | ₹250 |
| Meter testing, single or three phase | ₹200 |
| Certificate (NDC, NOC and similar) | ₹100 each |
| Security deposit, electronic meter | ₹200 (1 phase), ₹500 (3 phase) |
| Smart prepaid meter cost | ₹6,000 per meter plus ₹12,000 installation |
| Wheeling charge (open access) | ₹0.63 per kWh |
| Annual surcharge on current-year dues | 5% at March end |
The schedule has no electricity duty, no fuel adjustment and no figure for arrears. It says subsidy will follow a later government notification, so the calculator does not apply one. It also does not state how slabs are applied, so this calculator uses the standard telescopic method. Other calculators sometimes add a ₹25 meter rent, a ₹40 fixed charge, a duty and a fuel adjustment by default. None of these match the order. Enter your own figures in Advanced mode.
Every extra slab costs ₹1.00 or ₹0.50 more per unit. Staying under 200 units keeps your rate at ₹4.40 or less.
Prepaid meters carry no meter rent and a 1% rebate on energy, against ₹40 or ₹80 rent on a postpaid meter. The ₹17 vending charge applies to prepaid meters but not to smart meters.
Cold Sikkim winters mean heaters and geysers drive most of the bill. Efficient appliances and timers cut units.
A geyser left on is one of the largest single loads in a hill home.
Rural homestays are being moved to domestic rates, and urban homestays with a 2 kWp or larger rooftop solar plant can use domestic rates. Check your category with the department.
Compare the bill with your own reading so that estimated readings do not push you into a higher slab.
SSERC Tariff Order for the Power Department, Government of Sikkim, Case No. P-01/PDS/2026, dated 30 June 2026, effective 1 July 2026. The tariff schedule is in the Appendix (pages 119 to 133 of the order). Rates in this calculator follow that order. Kalikolom Tools is not affiliated with the Power Department or SSERC.
A Sikkim bill is the energy charge by slab, topped up to the monthly minimum charge if it falls below it, plus meter rent. For a domestic home the slabs are ₹2.40 up to 50 units, ₹3.40 for 51 to 100, ₹4.40 for 101 to 200, ₹4.90 for 201 to 400 and ₹5.40 above 400 units. Each slab applies only to the units inside it. Electricity duty and fuel adjustment are not in the tariff schedule, so you add them from your bill.
Domestic rates are ₹2.40, ₹3.40, ₹4.40, ₹4.90 and ₹5.40 per unit across the five slabs. Commercial rates are ₹5.05, ₹6.05, ₹7.05, ₹8.05 and ₹8.35. Bulk supply is a flat ₹7.95 and public lighting ₹7.46. The order came into force on 1 July 2026.
Domestic homes pay at least ₹100 a month on a single-phase connection and ₹200 on three phase. Commercial users below 25 kVA pay at least ₹300 (single phase) or ₹500 (three phase). The minimum is a floor on the bill, not an extra charge. If your energy charge is higher, you pay the energy charge.
No. The order describes it as a fixed minimum billing amount that applies irrespective of consumption. A domestic single-phase home using 100 units pays ₹290 in energy charges, which is already above ₹100, so no minimum is added. The calculator shows a top-up line only when the energy charge is below the minimum.
The order lists meter rent of ₹40 a month for a single-phase energy meter and ₹80 for a three-phase meter. A maximum demand indicator costs ₹200 and a time switch ₹150. Consumers with a prepaid meter pay no meter rent. The calculator lets you pick the meter type.
The order gives prepaid meter consumers a 1% rebate on the energy charge and no meter rent. A vending charge of ₹17 per meter per month applies to prepaid meters, but not to smart meters. The calculator applies these when you choose Prepaid or Smart prepaid.
Not in this tariff order. The only rebate in the tariff schedule is the 1% prepaid meter rebate. Some calculators apply a 5% timely-payment rebate, but it cannot be confirmed from the order. If your own bill shows a rebate, enter its percentage in Advanced mode.
A 5% annual surcharge is levied every March end on the outstanding principal of that financial year’s electricity charges. It does not apply to earlier arrears or accumulated surcharge. It is a charge on unpaid dues, so it is not part of the monthly bill estimate.
The schedule lists the slabs but does not state the method. This calculator uses the standard telescopic method, where each block of units pays only its own rate. For 100 units in the domestic category that is 50 units at ₹2.40 and 50 units at ₹3.40, which is ₹290.
Commercial supply uses five slabs from ₹5.05 to ₹8.35. Below 25 kVA the monthly minimum is ₹300 or ₹500. At 25 kVA and above on a shared transformer, a demand charge of ₹60 (rural) or ₹100 (urban) per kVA applies, in addition to energy charges.
HT industrial consumers pay a demand charge per kVA of contract demand plus energy per kVAh. Up to 250 kVA it is ₹250 per kVA and ₹7.86; above 250 to 500 kVA ₹290 and ₹8.36; above 500 kVA ₹560 and ₹8.86. Demand above the contract demand is billed at twice the demand charge. Time-of-Day rates also apply.
From 00:00 to 05:00 the energy charge is ₹0.40 per kVAh lower than normal. From 05:00 to 08:00 and from 17:00 to 20:00 it is ₹1.00 per kVAh higher. All other hours are normal. The calculator has boxes for these units when you choose HT industrial.
Twice the tariff for the corresponding permanent supply, and temporary connections need an energy meter. Two months of assessment on the sanctioned load is paid in advance as a security deposit. The calculator has a temporary supply switch that doubles the rates and the minimum and demand charges.
Units are assessed as sanctioned load in kW × 8 hours × 30 days × 60/100 for most consumers, and × 6 hours for government office buildings. In Advanced mode you can enter the sanctioned load in kW and the calculator works out the assessed units.
No, because the tariff schedule does not contain them. They default to zero. Some calculators add a meter rent of ₹25, a fixed charge of ₹40, a duty and a fuel adjustment by default, none of which match the order. In Advanced mode you can enter duty, fuel adjustment and other items exactly as printed on your bill.
Common reasons are electricity duty, fuel adjustment, arrears, the annual surcharge, a different meter type, a different phase or category, or a different billing period. Enter those items in Advanced mode to compare line by line.
The SSERC Tariff Order for the Power Department, Government of Sikkim, Case No. P-01/PDS/2026, dated 30 June 2026, effective 1 July 2026. The tariff schedule is in the Appendix (pages 119 to 133 of the order). This tool is not an official Power Department or SSERC service.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.