Based on the APERC Retail Supply Tariff for FY 2026–27, order dated 25 March 2026. Electricity Duty and FPPCA are not included. Free, no sign-up. An estimate, not your official bill.
Choose your consumer category and enter the load, demand and units. The calculator applies the APERC FY 2026–27 tariff for all LT and HT categories in the order.
Based on the APERC Retail Supply Tariff for FY 2026–27, order dated 25 March 2026. Electricity Duty and FPPCA are not included. Free, no sign-up. An estimate, not your official bill.
Pick your consumer category, then fill in the fields that appear. Each category shows only the inputs its tariff needs.
Pick the category that matches your connection. The table below lists every category with its rates.
LT categories use the sanctioned load in kW. HT categories use contract demand and recorded maximum demand in kVA.
Enter total units. For peak and off-peak categories, enter the units in each time window.
See each line, the total, and the rule that applies. Print, save as PDF or share the result.
It applies the rules from the APERC tariff order, category by category, and shows each step of the working.
Covers the 22 LT and 17 HT categories in the FY 2026–27 order, including agriculture, lift irrigation and railway traction.
Applies telescopic slabs, billing demand, minimum energy billing and peak and off-peak rates where the order sets them.
Adds the fixed charge per kW and the minimum monthly charges set for each category.
For domestic connections, you can enter meter readings or a budget amount.
Each charge is shown on its own line, with the rule used, so you can check it against your bill.
Print, save as PDF or copy the result without creating an account.
The bill is built from up to three parts. The energy charge is the units billed at the category rate. The demand or fixed charge depends on sanctioned load or contract demand. Time-of-Day premiums or rebates apply to units in set hours, and some categories have minimum charges.
Bill = energy charge + demand or fixed charge ± ToD adjustment + any minimum-charge top-up
The order states that tariffs are exclusive of Electricity Duty, FPPCA and true-up or true-down amounts. Those are not included here.
The table lists every category in the APERC order for FY 2026–27. It applies to APSPDCL, APCPDCL and APEPDCL. The order states that there is no tariff increase for any LT or HT consumer.
| Category | Supply | Order reference | Rates and rules |
|---|---|---|---|
| Domestic – telescopic (I(A)) | LT | Cat I(A) LT (telescopic) | Telescopic slabs: 0–30 ₹1.90, 31–75 ₹3.00, 76–125 ₹4.50, 126–225 ₹6.00, 226–400 ₹8.75, >400 ₹9.75 per kWh. Fixed ₹10/kW (and part thereof), ₹75/kW for load above 75 kW. |
| Commercial & Others (II(A)(i)) | LT | II(A)(i) LT | Slabs 0–50 ₹5.40, 51–100 ₹7.65, 101–300 ₹9.05, 301–500 ₹9.60, >500 ₹9.95 per kWh. Fixed ₹75/kW (₹275/kW above 75 kW). Minimum ₹65/month single-phase or ₹200/month three-phase. ToD for 10 kW and above: peak (18–22 h) +₹0.50 (10–20 kW) or +₹1.00 (>20 kW); off-peak (10–15 h) −₹0.50 or −₹1.00. |
| Advertising Hoardings (II(A)(ii)) | LT | II(A)(ii) LT | Fixed ₹100/kW, energy ₹9.95/kWh, minimum ₹300/month. |
| Function Halls / Auditoria (II(A)(iii)) | LT | II(A)(iii) LT | No fixed charge, energy ₹9.95/kWh, minimum ₹300/month. |
| Startup Power (II(B)) | LT | II(B) LT | No fixed charge, energy ₹9.95/kWh. Only for generator start-up, maintenance and lighting. |
| Electric Vehicles / Charging Stations (II(C)) | LT | II(C) LT | No fixed charge, energy ₹6.70/kWh. Charging stations need a separate connection. |
| Green Power (II(D)) | LT | II(D) LT | Optional category. No fixed charge, energy ₹9.95/kWh. |
| Industry (General) (III(A)) | LT | III(A) LT | Fixed ₹75/kW (₹275/kW above 75 kW). Up to 15 kW: ₹6.70 flat. Above 15 kW: normal ₹6.70; peak ₹7.20 (15–25 kW) or ₹7.70 (above 25 kW); off-peak ₹6.20 (15–25 kW) or ₹5.70 (above 25 kW). |
| Seasonal Industries – off-season (III(B)) | LT | III(B) LT | Off-season: fixed ₹75/kW on 30% of contracted load or recorded demand, whichever is higher; energy ₹7.45/kWh. In season the consumer is billed under III(A). |
| Cottage Industries up to 20 HP (III(D)) | LT | III(D) LT | Fixed ₹20/kW/month, minimum ₹30/month; energy ₹3.75/kWh. |
| Utilities – street lighting, PWS (IV(A)) | LT | IV(A) LT | Fixed ₹75/kW (₹275/kW above 75 kW); energy ₹7.00/kWh. |
| General Purpose – government, charitable (IV(B)) | LT | IV(B) LT | Fixed ₹75/kW (₹275/kW above 75 kW); energy ₹7.00/kWh; minimum energy charge ₹50 (single-phase) or ₹150 (three-phase) per month. |
| Religious Places (IV(C)) | LT | IV(C) LT | Fixed ₹30/kW. Energy ₹3.85/kWh up to 2 kW contracted load, ₹5.00/kWh above 2 kW. |
| Agriculture – Corporate Farmers (V(A)(i)) | LT | V(A)(i) LT | Energy ₹3.50/kWh with DSM measures (mandatory); ₹4.50/kWh without DSM. No fixed charge. |
| Agriculture – Non-corporate Farmers (V(A)(ii)) | LT | V(A)(ii) LT | Free power. Urban-feeder and paying lift-irrigation consumption above 1200 units per HP per year is billed at ₹6.40/kWh on an annual basis; this calculator does not compute that. |
| Salt Farming up to 15 HP (V(A)(iii)) | LT | V(A)(iii) LT | No fixed charge, energy ₹2.50/kWh. Above 15 HP is billed under III(A). |
| Sugarcane Crushing (V(A)(iv)) | LT | V(A)(iv) LT | Free power, no monthly charge. |
| Rural Horticulture Nurseries (V(A)(v)) | LT | V(A)(v) LT | Free power, no monthly charge. |
| Floriculture in Greenhouse (V(A)(vi)) | LT | V(A)(vi) LT | Fixed ₹75/kW, energy ₹4.50/kWh. This calculator accepts up to 75 kW only; the order gives a different fixed charge above that. |
| Aquaculture & Animal Husbandry (V(B)) | LT | V(B) LT | Fixed ₹30/kW, energy ₹3.85/kWh. |
| Agro-based Cottage Industries up to 20 HP (V(D)) | LT | V(D) LT | Fixed ₹20/kW, energy ₹3.75/kWh. Above 20 HP is billed under III(A). |
| Lift Irrigation Schemes (V(E)) | LT | V(E) LT | No demand charge, energy ₹6.40/kVAh. Free power up to 1200 units per HP per year. |
| Townships, Colonies, Gated Communities & Villas (I(B)) | HT | I(B) HT | Demand ₹75/kVA on recorded maximum demand. Energy ₹7.00/kVAh, at least 25 kVAh per kVA of billing demand. |
| Commercial (II(A)(i)) | HT | II(A)(i) HT | Demand ₹475/kVA on the higher of recorded maximum demand and 80% of contract demand. Energy by voltage (11 kV ₹7.65, 33 kV ₹6.95, 132 kV ₹6.70, 220 kV ₹6.65 per kVAh), at least 25 kVAh per kVA. ToD: +₹1.00/kVAh for 6 PM–10 PM units. |
| Function Halls / Auditoria (II(A)(iii)) | HT | II(A)(iii) HT | No demand charge, energy ₹9.95/kVAh. |
| Startup Power (II(B)) | HT | II(B) HT | No demand charge, energy ₹9.95/kVAh. Penal 1.2× rate applies if maximum demand exceeds the limit for the plant type; not computed here. |
| Electric Vehicles / Charging Stations (II(C)) | HT | II(C) HT | Energy ₹6.70/kVAh for all voltages. |
| Green Power (II(D)) | HT | II(D) HT | No demand charge, energy ₹9.95/kVAh. |
| Industry (General) (III(A)) | HT | III(A) HT | Demand ₹475/kVA on the higher of recorded maximum demand and 80% of contract demand. ToD by grid season: High grid (Apr–May, Sep–Oct, Feb–Mar) peak ₹7.80/7.35/6.90/6.85; Low grid (Jun–Aug, Nov–Jan) peak ₹7.30/6.85/6.40/6.35 (11/33/132/220 kV). Normal ₹6.30/5.85/5.40/5.35; off-peak ₹5.55/5.10/4.65/4.60. At least 50 kVAh per kVA of billing demand. |
| Industrial Colonies (III(A)) | HT | III(A) HT colonies | Energy ₹7.00/kVAh, no demand charge. Applies to separately metered residential colonies of industry. |
| Seasonal Industries – off-season (III(B)) | HT | III(B) HT | Off-season: demand ₹475/kVA on the higher of recorded maximum demand and 30% of contract demand; energy by voltage (11 kV ₹7.65, 33 kV ₹6.95, 132 kV ₹6.70, 220 kV ₹6.65). In season the consumer is billed under III(A). |
| Energy Intensive Industries (III(C)) | HT | III(C) HT | Demand ₹475/kVA. Energy by voltage (11 kV ₹5.80, 33 kV ₹5.35, 132 kV ₹4.95, 220 kV ₹4.90 per kVAh), at least 50 kVAh per kVA of contract demand. |
| Solar PV Module Manufacturing (III(D)) | HT | III(D) HT | No demand charge, energy ₹4.00/kVAh, at least 50 kVAh per kVA of contract demand. |
| Utilities – PWS schemes (IV(A)) | HT | IV(A) HT | Demand ₹475/kVA. Energy by voltage (11 kV ₹7.65, 33 kV ₹6.95, 132 kV ₹6.70, 220 kV ₹6.65 per kVAh). The order sets a minimum of ₹300/kVA per year, which is not applied monthly here. |
| General Purpose – government, charitable (IV(B)) | HT | IV(B) HT | Demand ₹475/kVA. Energy by voltage (11 kV ₹7.95, 33 kV ₹7.25, 132 kV ₹7.00, 220 kV ₹6.95 per kVAh). The order sets a minimum of ₹300/kVA per year, which is not applied monthly here. |
| Religious Places (IV(C)) | HT | IV(C) HT | Demand ₹30/kVA on the higher of recorded maximum demand and 80% of contract demand. Energy ₹5.00/kVAh, at least 25 kVAh per kVA. |
| Railway Traction (IV(D)) | HT | IV(D) HT | Demand ₹350/kVA on the higher of recorded maximum demand and 80% of contract demand. Energy ₹6.50/kVAh, at least 32 kVAh per kVA. |
| Aquaculture & Animal Husbandry (V(B)) | HT | V(B) HT | Demand ₹30/kVA, energy ₹3.85/kVAh, at least 40 kVAh per kVA. The billing-demand rule is not stated in the extracted text; this calculator uses the same rule as other HT demand categories. |
| Lift Irrigation Schemes (V(E)) | HT | V(E) HT | No demand charge, energy ₹7.15/kVAh. Metering is mandatory. |
Domestic telescopic bills for a 1 kW sanctioned load. Totals are before Electricity Duty and FPPCA.
| Units (kWh) | Energy charge | Fixed charge (1 kW) | Total |
|---|---|---|---|
| 50 | ₹117.00 | ₹10.00 | ₹127.00 |
| 100 | ₹304.50 | ₹10.00 | ₹314.50 |
| 150 | ₹567.00 | ₹10.00 | ₹577.00 |
| 200 | ₹867.00 | ₹10.00 | ₹877.00 |
| 250 | ₹1,235.75 | ₹10.00 | ₹1,245.75 |
| 300 | ₹1,673.25 | ₹10.00 | ₹1,683.25 |
| 400 | ₹2,548.25 | ₹10.00 | ₹2,558.25 |
| 500 | ₹3,523.25 | ₹10.00 | ₹3,533.25 |
| 750 | ₹5,960.75 | ₹10.00 | ₹5,970.75 |
| 1000 | ₹8,398.25 | ₹10.00 | ₹8,408.25 |
| Slab (kWh) | Units in slab | Rate (₹) | Amount |
|---|---|---|---|
| 0–30 | 30 | 1.90 | ₹57.00 |
| 31–75 | 45 | 3.00 | ₹135.00 |
| 76–125 | 50 | 4.50 | ₹225.00 |
| 126–225 | 100 | 6.00 | ₹600.00 |
| 226–400 | 25 | 8.75 | ₹218.75 |
| Energy charge | ₹1,235.75 | ||
| Fixed charge (2 kW) | ₹20.00 | ||
| Total (before duty and FPPCA) | ₹1,255.75 |
For domestic connections, the fixed charge depends on sanctioned load, not on units used. It is ₹10 per kW and part thereof, and ₹75 per kW for load above 75 kW.
| Sanctioned load | How it is counted | Fixed charge |
|---|---|---|
| 1 kW | Exactly 1 kW | ₹10.00 |
| 2.5 kW | Part of a kW counts as a full kW (3 kW) | ₹30.00 |
| 5 kW | 5 kW | ₹50.00 |
| 80 kW | 75 kW at ₹10 plus 5 kW at ₹75 | ₹1,125.00 |
Domestic supply is for household use. If the supply is used for commercial purposes, a separate commercial connection is required; otherwise the whole supply is charged at the commercial tariff, with possible penal charges.
LT supply is extended on a single phase for a connected load up to 5 kW only.
HT billing demand is the recorded maximum demand or the stated share of contract demand, whichever is higher. Minimum energy billing applies per kVA of billing demand.
Levied under the AP Electricity Duty Act, 1939. The order does not state the duty rate, so it is not calculated here.
The Fuel and Power Purchase Cost Adjustment is set by separate Commission orders.
Adjustments for earlier years are set by separate orders and may appear on your bill.
The calculator follows the FY 2026–27 order. It does not replace your official bill. Please read these points before relying on a result:
The order gives commercial slab rates but does not state the billing method in the text used here. This calculator applies the slab of total consumption to all units.
Some HT categories have a minimum charge per kVA per year. It is not applied to a monthly bill.
Temporary supply, rooftop solar net metering, penal charges, power-factor and capacitor adjustments, and development charges are not calculated.
For aquaculture HT, the billing-demand rule is not stated in the text used here; the same rule as other HT demand categories is applied.
Retail Supply Tariff for FY 2026–27: APERC, Order on Tariff for Retail Sale of Electricity during FY 2026-27 and DISCOMs’ True-up/Down and Performance Review FY 2024-25, dated 25 March 2026. The LT rates are in Chapter XI, Table 11 and the LT Terms and Conditions; HT rates are in the HT Terms and Conditions. The PDF is available from APSPDCL’s regulatory files.
Each category has its own rules. Domestic LT is billed slab by slab (telescopic), with a fixed charge per kW of sanctioned load. Most HT categories add a demand charge per kVA of billing demand plus an energy charge per kVAh. Electricity Duty and FPPCA are separate and not included in this estimate.
All 22 LT categories and 17 HT categories listed in the APERC Retail Supply Tariff for FY 2026–27, from domestic and commercial to agriculture, lift irrigation, railway traction and industry. Temporary supply is not included.
Telescopic billing (domestic) charges each slab at its own rate, so only the units inside a slab are charged that rate. Non-telescopic billing applies the rate of the slab where total consumption falls to all units. The order describes the domestic slabs as telescopic. It does not say so for LT commercial, so this calculator uses non-telescopic billing for that category; please check it against your bill.
For most HT categories, billing demand is the higher of the recorded maximum demand in the month and 80% of contract demand (30% for seasonal off-season). Demand is charged per kVA of billing demand, so both values are needed. Some categories also set a minimum energy billing of 25, 32, 40 or 50 kVAh per kVA.
Time-of-Day (ToD) rules apply peak, normal and off-peak rates to units consumed in fixed hours. Enter the units consumed in each window from your meter data. The remaining units are treated as normal-hour units.
No. The order states that tariffs are exclusive of Electricity Duty, FPPCA and true-up or true-down amounts. The duty rate is set under the AP Electricity Duty Act, 1939, and is not stated in the order.
No. It is an estimate based on the tariff rules. Your bill can differ because of duty, FPPCA, true-up amounts, meter readings, billing period and other items.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.