Based on the HERC tariff for FY 2026–27 as notified in UHBVN Sales Circular U-03/2026, effective 1 April 2026. Free, no sign-up. An estimate, not your official bill.
Choose your connection and enter your load and units. The calculator applies the HERC FY 2026–27 tariff from 1 April 2026, including domestic slabs by load category, kVAh billing, fixed charges, the prepaid rebate and Electricity Duty.
Based on the HERC tariff for FY 2026–27 as notified in UHBVN Sales Circular U-03/2026, effective 1 April 2026. Free, no sign-up. An estimate, not your official bill.
Pick your connection, then fill in the fields that appear. Each category shows only the inputs its tariff needs.
Homes use Domestic, and the sanctioned load decides Category I, II or III. Shops and offices up to 50 kW use LT non-domestic. Loads above 50 kW, factories and industry use HT supply. Farm pumps, street lights, EV charging and bulk supply have their own entries.
Type the sanctioned load from your bill and the units for the month. HT and bulk supply use contract demand in kVA. Housing societies also enter the number of flats.
For LT commercial and HT, say whether your bill shows kVAh or only kWh. Add temporary supply, a prepaid smart meter or green energy if they apply to you.
See every line from the slab charge to Electricity Duty, the exact total and the rounded bill. Print the result, save it as a PDF or share it.
It applies the rules of the HERC tariff schedule category by category and shows each step of the working.
Domestic Category I, II and III, places of worship, bulk domestic, LT commercial, agro industries, tube-wells, water works, street light, EV charging, HT and bulk supply.
Charges each domestic slab only for the units inside it, and picks the rate table from your sanctioned load.
Handles kVAh tariffs for LT commercial and HT, and converts kWh at power factor 0.90 when your meter records only kWh.
Applies ₹50 or ₹75 per kW for domestic, ₹100 or ₹250 per kW for LT commercial, ₹290 per kVA for HT and ₹150 per kW for bulk domestic.
Checks units per flat against the 800-unit limit and moves the whole bill to ₹6.60 when the limit is crossed.
Handles the 5% prepaid rebate, temporary supply multipliers, green energy premium, Electricity Duty, fuel surcharge and local tax.
A Haryana bill has a few parts. The energy charge is your units billed in domestic slabs or at a flat rate per kWh or kVAh. The fixed charge depends on your load. Temporary supply multipliers and the prepaid rebate then change those two charges. Electricity Duty, the fuel surcharge adjustment and local taxes are added on top.
Bill = energy charge + fixed charge ± temporary supply or prepaid rebate + Electricity Duty + fuel surcharge + municipal tax
The Haryana Electricity Regulatory Commission (HERC) approves the tariff, and the distribution companies UHBVN and DHBVN bill it. The tariff schedule says it does not include Electricity Duty, municipal tax, panchayat tax or the fuel surcharge adjustment, so the calculator shows those as separate lines.
The table lists every category in the schedule, effective from 1 April 2026. Railway traction and DMRC are merged with HT supply.
| Category | Group | Rates and rules |
|---|---|---|
| Domestic – Category I / II / III (set by sanctioned load) | Domestic | Category I (up to 2 kW): ₹2.20 for 0–50 units, ₹2.70 for 51–100. Category II (up to 5 kW): ₹2.95 for 0–150, ₹5.25 for 151–300, ₹6.45 for 301–500, ₹7.10 above 500, plus ₹50 per kW fixed charge once the slab goes past 300 units. Category III (above 5 kW): ₹6.50 for 0–500, ₹7.15 for 501–1,000, ₹7.50 above 1,000, plus ₹75 per kW fixed charge. |
| Place of worship (single-part, domestic slabs) | Domestic | Single-part tariff equal to the domestic slabs for the load category, with no fixed charge (Note 10). |
| Bulk supply – Domestic (societies, group housing) | Domestic | ₹5.80 per kWh on all units if consumption is 800 units per flat or less, ₹6.60 per kWh on all units if above 800 units per flat. Fixed charge ₹150 per kW of recorded demand. |
| Non-Domestic / commercial – LT supply (up to 50 kW) | LT non-domestic | Up to 10 kW: ₹6.45 per kVAh, fixed ₹100 per kW. Above 10 and up to 20 kW: ₹6.80 per kVAh, fixed ₹100 per kW. Above 20 and up to 50 kW: ₹6.60 per kVAh, fixed ₹250 per kW. Billed on kVAh; kWh meters are converted at power factor 0.90. |
| Agro Industries – FPO mushroom compost, hydroponics, cold storage units | Agriculture | Up to 20 kW: ₹4.75 per kWh. Above 20 kW: ₹6.50 per kWh. No fixed charge. |
| Agro Industries / FPO – other (pack house, poultry, dairy, fish farm, cold storage) | Agriculture | Up to 20 kW: ₹4.75 per kWh, no fixed charge. 20 to 50 kW: as LT non-domestic (₹6.60 per kVAh, ₹250 per kW). Above 50 kW: as HT supply. |
| Agriculture tube-well – metered | Agriculture | ₹7.48 per unit. Fixed ₹180 per BHP per year for motors up to 15 BHP and ₹144 per BHP per year above 15 BHP. The calculator shows the yearly charge as a monthly twelfth. |
| Agriculture tube-well – un-metered | Agriculture | No energy charge. ₹15 per BHP per month for motors up to 15 BHP and ₹12 per BHP per month above 15 BHP. |
| Public Water Works | Public services | ₹7.35 per kWh. Fixed charge ₹180 per kW. |
| Lift irrigation | Public services | ₹7.35 per kWh. Fixed charge ₹180 per kW or BHP per month. |
| Street light | Public services | ₹7.35 per kWh. Charge of ₹165 per kW per month on connected load. |
| EV charging station – LT level | Special rates | ₹7.48 per unit, equal to cost of supply at LT. No fixed charge. |
| EV charging station – HT level | Special rates | ₹7.24 per unit, equal to cost of supply at HT. No fixed charge. |
| Advocate chamber | Special rates | Single rate of ₹7.48 per unit (cost of supply at LT). No demand or fixed charge. |
| Electric crematorium | Special rates | Concessional ₹2.75 per unit. No demand charge. |
| Gaushala (eligible) | Special rates | ₹2.00 per kWh, subject to payment of subsidy by the State Government. |
| HT supply – 11 kV (industry, commercial, railway traction, DMRC) | HT (above 50 kW) | ₹6.95 per kVAh. Fixed charge ₹290 per kVA of contract demand per month. |
| HT supply – 33 kV (industry, commercial, railway traction, DMRC) | HT (above 50 kW) | ₹6.85 per kVAh. Fixed charge ₹290 per kVA of contract demand per month. |
| HT supply – 66 / 132 kV (industry, commercial, railway traction, DMRC) | HT (above 50 kW) | ₹6.75 per kVAh. Fixed charge ₹290 per kVA of contract demand per month. |
| HT supply – 220 kV (industry, commercial, railway traction, DMRC) | HT (above 50 kW) | ₹6.70 per kVAh. Fixed charge ₹290 per kVA of contract demand per month. |
| HT supply – 400 kV (industry, commercial, railway traction, DMRC) | HT (above 50 kW) | ₹6.55 per kVAh. Fixed charge ₹290 per kVA of contract demand per month. |
| Arc furnace / steel rolling mill – 11 kV | HT (above 50 kW) | ₹7.25 per kVAh. Fixed charge ₹290 per kVA of contract demand. At 33 kV and above the HT tariff of that voltage applies. |
| Bulk supply (non-domestic) – LT | Bulk supply | ₹6.90 per kVAh. Fixed charge ₹250 per kVA of contract demand, or ₹250 per kW of connected load where no contract demand is sanctioned. |
| Bulk supply (non-domestic) – 11 kV | Bulk supply | ₹6.80 per kVAh. Fixed charge ₹250 per kVA of contract demand, or ₹250 per kW of connected load where no contract demand is sanctioned. |
| Bulk supply (non-domestic) – 33 kV | Bulk supply | ₹6.70 per kVAh. Fixed charge ₹250 per kVA of contract demand, or ₹250 per kW of connected load where no contract demand is sanctioned. |
| Bulk supply (non-domestic) – 66 / 132 kV | Bulk supply | ₹6.60 per kVAh. Fixed charge ₹250 per kVA of contract demand, or ₹250 per kW of connected load where no contract demand is sanctioned. |
| Bulk supply (non-domestic) – 220 kV | Bulk supply | ₹6.50 per kVAh. Fixed charge ₹250 per kVA of contract demand, or ₹250 per kW of connected load where no contract demand is sanctioned. |
Domestic tariffs have three categories, set by sanctioned load. Within a category the slabs are telescopic: each rate applies only to the units inside that slab.
| Units in the month | Rate per unit | Energy charge at the top of the slab |
|---|---|---|
| 0 – 50 | ₹2.20 | ₹110.00 |
| 51 – 100 | ₹2.70 | ₹245.00 |
| Units in the month | Rate per unit | Energy charge at the top of the slab |
|---|---|---|
| 0 – 150 | ₹2.95 | ₹442.50 |
| 151 – 300 | ₹5.25 | ₹1,230.00 |
| 301 – 500 | ₹6.45 | ₹2,520.00 |
| 501 and above | ₹7.10 | ₹2,520 + ₹7.10 per extra unit |
| Units in the month | Rate per unit | Energy charge at the top of the slab |
|---|---|---|
| 0 – 500 | ₹6.50 | ₹3,250.00 |
| 501 – 1,000 | ₹7.15 | ₹6,825.00 |
| 1,001 and above | ₹7.50 | ₹6,825 + ₹7.50 per extra unit |
A 3 kW home using 250 units pays the first 150 units at ₹2.95 and the next 100 at ₹5.25, not all 250 at one rate. Category I is meant for consumption up to 100 units; above that the calculator works the bill out on the Category II slabs.
| Category | Fixed charge | Example |
|---|---|---|
| Category I (up to 2 kW) | Nil | 2 kW home: ₹0 |
| Category II (up to 5 kW) | ₹50 per kW, once the slabs go past 300 units | 3 kW with 350 units: ₹150. With 300 units or less: ₹0 |
| Category III (above 5 kW) | ₹75 per kW in every slab | 6 kW: ₹450 a month, even with zero units |
The old minimum monthly charge (MMC) was replaced by fixed charges in the order of 28 February 2025. The schedule shows the ₹50 per kW charge against the 301–500 and above-500 slabs only, so this calculator adds it when units pass 300.
The table shows the bill for a 1 kW home (Category I), a 3 kW home (Category II) and a 6 kW home (Category III). It includes the assumed Electricity Duty of ₹0.10 per unit and is for a postpaid meter. Fuel surcharge and local tax are extra.
| Units | 1 kW home | 3 kW home | 6 kW home |
|---|---|---|---|
| 50 | ₹115 | ₹153 | ₹780 |
| 100 | ₹255 | ₹305 | ₹1,110 |
| 150 | ₹458 | ₹458 | ₹1,440 |
| 200 | ₹725 | ₹725 | ₹1,770 |
| 250 | ₹993 | ₹993 | ₹2,100 |
| 300 | ₹1,260 | ₹1,260 | ₹2,430 |
| 400 | ₹1,965 | ₹2,065 | ₹3,090 |
| 500 | ₹2,620 | ₹2,720 | ₹3,750 |
| 750 | ₹4,420 | ₹4,520 | ₹5,563 |
| 1000 | ₹6,220 | ₹6,320 | ₹7,375 |
At 150 units the 1 kW and 3 kW bills are equal, because a Category I home above 100 units is worked out on the Category II slabs.
| Line | Working | Amount |
|---|---|---|
| Energy charge | 150 × ₹2.95 + 100 × ₹5.25 | ₹967.50 |
| Fixed charge | Nil, units are 300 or less | ₹0.00 |
| Electricity Duty | 250 × ₹0.10 (assumed) | ₹25.00 |
| Total | ₹992.50 | |
| Bill after rounding | Nearest rupee | ₹993 |
Shops, offices, clinics and small workshops up to 50 kW are billed per kVAh, with one rate for all units in the month.
| Connected load | Rate per kVAh | Fixed charge |
|---|---|---|
| Up to 10 kW | ₹6.45 | ₹100 per kW |
| Above 10 and up to 20 kW | ₹6.80 | ₹100 per kW |
| Above 20 and up to 50 kW | ₹6.60 | ₹250 per kW |
LT consumers up to 20 kW are billed on kVAh, with kWh billing only where the meter is not kVAh compliant. In that case the schedule says to use a power factor of 0.90, so kVAh equals kWh divided by 0.9.
| Line | Working | Amount |
|---|---|---|
| Energy, kVAh meter | 200 × ₹6.45 | ₹1,290.00 |
| Fixed charge | 5 kW × ₹100 | ₹500.00 |
| Electricity Duty | 200 × ₹0.10 (assumed) | ₹20.00 |
| Total | ₹1,810.00 |
If the same shop has a kWh-only meter, the 200 kWh become 222.22 kVAh. The energy charge rises to ₹1,433.32 and the total to ₹1,953.32.
Bulk supply (domestic) covers group housing and societies with a single point of supply. It is not slab based. The whole month is billed at one rate, chosen by units per flat or dwelling unit.
| Units per flat in the month | Rate on all units | Fixed charge |
|---|---|---|
| 800 or less | ₹5.80 per kWh | ₹150 per kW of recorded demand |
| Above 800 | ₹6.60 per kWh | ₹150 per kW of recorded demand |
Example: 20 flats using 12,000 units a month average 600 units per flat, so all 12,000 units cost ₹5.80, which is ₹69,600. With a recorded demand of 40 kW the fixed charge is ₹6,000, and the total with assumed duty is ₹76,800.00. If the same society used 20,000 units, the average of 1,000 per flat moves every unit to ₹6.60.
HT supply covers industry and commercial connections above 50 kW, including railway traction and DMRC. Fixed charges are levied on contract demand in kVA.
| Supply voltage | Energy rate (kVAh) | Fixed charge |
|---|---|---|
| 11 kV | ₹6.95 | ₹290 per kVA |
| 33 kV | ₹6.85 | ₹290 per kVA |
| 66 / 132 kV | ₹6.75 | ₹290 per kVA |
| 220 kV | ₹6.70 | ₹290 per kVA |
| 400 kV | ₹6.55 | ₹290 per kVA |
| Arc furnace / steel rolling mill at 11 kV | ₹7.25 | ₹290 per kVA |
Bulk supply (non-domestic) pays ₹6.90 at LT, ₹6.80 at 11 kV, ₹6.70 at 33 kV, ₹6.60 at 66/132 kV and ₹6.50 at 220 kV per kVAh, with a fixed charge of ₹250 per kVA of contract demand. Where no contract demand is sanctioned, it is ₹250 per kW of connected load.
Example: an 11 kV HT industry with a contract demand of 100 kVA and 15,000 kVAh pays ₹1,04,250 for energy and ₹29,000 as fixed charge. With assumed duty the total is ₹134,750.00.
| Connection | Energy charge | Fixed charge |
|---|---|---|
| Tube-well, metered, motor up to 15 BHP | ₹7.48 per unit | ₹180 per BHP per year |
| Tube-well, metered, motor above 15 BHP | ₹7.48 per unit | ₹144 per BHP per year |
| Tube-well, un-metered, up to 15 BHP | Nil | ₹15 per BHP per month |
| Tube-well, un-metered, above 15 BHP | Nil | ₹12 per BHP per month |
| Agro industries (FPO mushroom, hydroponics, cold storage) | ₹4.75 up to 20 kW; ₹6.50 above | Nil |
| Other agro industries up to 20 kW | ₹4.75 per kWh | Nil |
The tube-well rate of ₹7.48 is the cost of supply. The tariff notes say the State Government may continue a subsidised tariff if it pays the subsidy in advance each quarter, so farmers may be billed less than this. Fish farms on an agriculture feeder stay on the subsidised tube-well tariff.
| Category | Rate |
|---|---|
| Public water works | ₹7.35 per kWh, fixed ₹180 per kW |
| Lift irrigation | ₹7.35 per kWh, fixed ₹180 per kW or BHP per month |
| Street light | ₹7.35 per kWh, ₹165 per kW per month |
| EV charging, HT level | ₹7.24 per unit, no fixed charge |
| EV charging, LT level | ₹7.48 per unit, no fixed charge |
| Advocate chamber | ₹7.48 per unit, no demand or fixed charge |
| Electric crematorium | ₹2.75 per unit, no demand charge |
| Eligible gaushala | ₹2.00 per kWh, subject to State Government subsidy |
| Place of worship | Domestic slabs as single-part tariff, no fixed charge |
The tariff order excludes Electricity Duty, municipal tax and panchayat tax, which the State Government levies, and the fuel surcharge adjustment (FSA), which follows the multi-year tariff regulations. The calculator assumes Electricity Duty of ₹0.10 per unit. FSA changes from month to month, and municipal or panchayat tax applies only in some areas, so both start at zero. Enter the figures from your bill in Advanced mode to match it.
HERC approved the tariff in its order of 25 March 2026, and UHBVN notified it from 1 April 2026 in Sales Circular U-03/2026. Compared with FY 2025–26, the domestic, LT commercial, HT and bulk supply rates stay the same. The changes are small.
These apply to open access consumers, not to ordinary bills, and are listed for reference.
| Charge | Rate |
|---|---|
| Wheeling charge, HT | ₹0.73 per kWh |
| Wheeling charge, LT | ₹0.94 per kWh |
| Cross subsidy surcharge, HT supply | ₹1.45 per kWh |
| Cross subsidy surcharge, LT supply including bulk | ₹1.18 per kWh |
| Additional surcharge | ₹1.15 per kWh |
| Transmission charge, short-term open access | ₹0.34 per kWh |
| Distribution network cost, open access at 66 kV or above | ₹0.45 per unit |
The schedule excludes duty. The calculator assumes ₹0.10 per unit. Change it in Advanced mode to match your bill.
Units above 100 for a Category I home are worked out on the Category II slabs. The schedule does not state this, so check your bill.
The ₹50 per kW charge is added once units pass 300, as the schedule shows it against the upper slabs.
Billing demand, excess demand and penalty rules sit outside this schedule. The fixed charge uses the contract demand you enter.
State subsidies, such as for tube-wells and eligible gaushalas, are not applied. Your bill may be lower.
Arrears, delayed payment surcharge, meter rent, open access charges and any one-off bill item are not part of the estimate.
Haryana has two distribution companies, Uttar Haryana Bijli Vitran Nigam (UHBVN) in the north and Dakshin Haryana Bijli Vitran Nigam (DHBVN) in the south. Both charge the tariff approved by HERC, so one calculator covers either bill.
A Category I home moves to Category II rates after 100 units. A Category II home with a load of 3 kW adds a ₹150 fixed charge after 300 units.
In Category II the rate jumps from ₹2.95 to ₹5.25 after 150 units and to ₹6.45 after 300. Small cuts near an edge save the most.
Category III homes pay ₹75 per kW every month, so a sanctioned load just above 5 kW costs far more than one at 5 kW.
The kWh conversion assumes power factor 0.90. A kVAh meter bills your real power factor, so improve it with capacitors.
Crossing 800 units per flat moves every unit from ₹5.80 to ₹6.60. Check the monthly average before the limit.
Solar cuts the units you draw from the grid, and it helps most when your slab is at ₹5.25 or above.
Uttar Haryana Bijli Vitran Nigam, Sales Circular No. U-03/2026, memo no. Ch-10/TR-72(90)/Tariff/ARR/FY-2026-27/CE/C-I dated 21 April 2026, Schedule of tariff for supply of energy for FY 2026–27, based on the HERC order of 25 March 2026 and effective from 1 April 2026. The Electricity Duty rate used here is an assumption and is outside this circular.
A Haryana bill is the energy charge for your units plus a fixed charge on your load, then Electricity Duty, fuel surcharge and any local tax. Domestic units are billed in slabs by load category. LT commercial and HT supply are billed per kVAh at one rate for the whole month, so there are no slabs.
For domestic Category I (up to 2 kW) the rate is ₹2.20 for the first 50 units and ₹2.70 for 51–100. Category II (up to 5 kW) pays ₹2.95, ₹5.25, ₹6.45 and ₹7.10 per unit across four slabs. Category III (above 5 kW) pays ₹6.50, ₹7.15 and ₹7.50. LT commercial pays ₹6.45 to ₹6.80 per kVAh and HT pays ₹6.55 to ₹6.95 per kVAh.
The first unit of domestic power costs ₹2.20 for a home with a load up to 2 kW. For a 3 kW home the first unit costs ₹2.95, and for a load above 5 kW it costs ₹6.50. The rate depends on your sanctioned load, not only on the units used.
The HERC order for FY 2026–27 keeps the domestic, LT commercial, HT and bulk supply rates the same as FY 2025–26. The visible change is for agriculture tube-wells, where the metered rate moved from ₹7.35 to ₹7.48 per unit, and EV charging now has stated rates of ₹7.24 at HT and ₹7.48 at LT.
Category I homes (up to 2 kW) pay no fixed charge. Category II homes pay ₹50 per kW of connected load once consumption goes past 300 units. Category III homes pay ₹75 per kW in every month. A 6 kW home therefore pays ₹450 even with zero units.
LT commercial consumers with a sanctioned load up to 20 kW are billed in kVAh, and so are LT consumers up to 50 kW and all HT consumers. If your meter records only kWh, the tariff notes allow billing at a power factor of 0.90, which means kVAh equals kWh divided by 0.9. Domestic units stay in kWh.
Housing societies and group housing pay ₹5.80 per kWh on all units if consumption is 800 units or less per flat, and ₹6.60 per kWh on all units if it is above 800 per flat. The fixed charge is ₹150 per kW of recorded demand. The rate is not slab by slab; the whole month moves to the higher rate.
Yes. Consumers on prepaid smart meters get a 5% rebate on both the fixed charge and the energy charge, as set by the HERC prepaid smart metering regulations. The calculator applies it when you choose the prepaid option.
Temporary supply pays 1.2 times the fixed charge and 1.5 times the energy charge of the matching category. If the period is extended, both fixed and energy charges are doubled from the date of extension.
No. The tariff schedule says it excludes Electricity Duty, municipal tax, panchayat tax and the fuel surcharge adjustment (FSA). The calculator assumes ₹0.10 per unit for duty, and lets you enter duty, fuel surcharge and tax from your own bill in Advanced mode.
Category I is the lifeline slab for homes up to 2 kW, with rates of ₹2.20 and ₹2.70 for the first 100 units. Above 100 units, the calculator works the bill out on the Category II slabs. The schedule does not spell this out, so compare the result with your bill.
Yes. UHBVN (Uttar Haryana Bijli Vitran Nigam) and DHBVN (Dakshin Haryana Bijli Vitran Nigam) charge the same HERC-approved tariff. The calculator works for either one.
It follows the UHBVN Sales Circular U-03/2026 line by line. Your real bill can differ because of the meter reading, the fuel surcharge for the month, the duty and tax rates, arrears and any State Government subsidy. Treat the result as an estimate and compare it with your bill.
Calculate your electricity bill using the latest applicable tariff rates for your region. Select your state or union territory below to access a dedicated electricity bill calculator with region-specific rates and charges.